ML20078G135

From kanterella
Jump to navigation Jump to search
Informs NRC of Completion of Requirements Associated W/ 941230 NOED Re Required Channel Functional Testing on Channel 3 Overtemp Delta-T & Overpower Delta-T for Period from 941230 to 950113
ML20078G135
Person / Time
Site: Beaver Valley
Issue date: 01/24/1995
From: George Thomas
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9502020420
Download: ML20078G135 (1)


Text

^^%

Beaver Va ley Power Stahon Shippingport, PA 15077-0004 1

/#

(4 t ?' 393-5M6 (4:2) 643-8069 FAX GEORGE S THOMAS I

o.wmon vce ere ident Nvckar Se<vges Nuclear Pewer Dmason Japuary 24, 1995 U.

S.

Nuclear Regulatory Commission

~.

Attn:

Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 NOED, Completion of Testing Requirements The purpose of this letter is to inform the Nuclear Regulatory Commission (NRC) of the completion of the requirements associated with the December 30, 1994, Notice of Enforcement Discretion.

The NRC exercised discretion not to enforce compliance with the quarterly surveillance requirements in the Beaver Valley Unit 2 Technical i

Specification Table 4.3-1, Item 7,

Overtemperature Delta-T (OTAT),

and Item 8,

Overpower Delta-T (OPAT) for the period from December 30, 1994, to January 13, 1995, at 1820 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.9251e-4 months <br />.

On January 10, 1995, the technical specification required channel functional testing was successfully completed on the Channel 3

OTAT and OPAT circuits.

The channels were demonstrated operable three days prior to the expiration of the Notice of Enforcement Discretion.

During the period of December 30, 1994, to January 10, 1995, no spikes were recorded on Channel 3 circuits.

The Duquesne Light Company appreciates the NRC's responsive reply to our request for enforcement discretion.

Sincerely, W

George S.

Thomas cc:

Mr.

L.

W.

Rossbach, Sr. Resident Inspector Mr.

T. T.

Martin, NRC Region I Administrator Mr.

G.

E.

Edison, Sr. Project Manager

(

Y b (b,. e l

\\

I 9so2o2o42o 9so124 PDR ADOCK 05o00412 i