Southern Nuclear Operating Company Post Office Box 1295 Birmingham. Alabama 35201 Telephone (205) 868-5086 Southern Nudear Operating Company J. D. Woodard Executive Vice President the southern electnc system NOvernber 10, 1994 Docket Nos.

50-348 50-364 U. S. Nuclear Regulatory Commission ATFN: Document Control Desk Washington, D.C. 20555 Joseph M Farley Nuclear Plant Monthly _ Operating Data Report Gentlemen:

Attached are the October 1994 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, x

\\k'M_'JAd__A D$Woodard

%)

RWC:jgp Attachments cc:

Mr. S. D. Ebneter Mr. B. L. Siegel Mr. T. M. Ross Fr. j, y a "1 1U d

s w 9411150485 941031 PDR ADOCK 05000348 qt i R

PDR 1

v

s Joseph M. Farley Nuclear Plant Unit 1 Narrative Summary of Operations October 1994 There were no unit shutdowns during the month.

At 1800 on 10/6/94, the unit was ramped down to 53 percent power to replace belts on the generator isophase bus duct cooling system.

The unit was returned to 100 percent power at 0900 on 10/7/94.

i j

v I

OPERATING DATA REPORT DOCKET NO.

50-348 DATE November 7,1994 COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156 OPERATINGAINWS 1.

Unit Name:

.loseph M. Farley - Unit 1 Notes 2.

Reporting Period:

October 1994

1) Cumulative data sincel2-01-77, 3.

Licensed Thermal Power (MWt):

2,652 date of commercial operation.

4.

Nameplate Rating (Gross MWe):

860 5.

Design Electrical Rating (Net MWe):

829 6.

Maximum Dependable Capacity (Gross MWe):

855.7 7.

Maximum Dependable Capacity (Net MWe):

812 8.

If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions. If Any:

N/A This Month Yr.to Date Cumulative

11. Ilours in Reporting Period 745.0 7,296.0 148,296.0
12. Number Of Hours Reactor Was Critical 745.0 6,128.9 117,792.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0

'14. Ilours Generator On-line 745.0 6,083.3 115,989.9

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,966,908.8 15,761,152.2 298,253,557.4
17. Gross Electrical Energy Generated (MWII) 643,716.0 5,121,760.0 96,136,806.0
18. Net Electrical Energy Generated (MWII) 611,766.0 4,845,660.0 90,785,814.0
19. Unit Service Factor 100.0 83.4 78.2
20. Unit Availabilty Factor 100.0 83.4 78.2
21. Unit Capacity Factor (Using MDC Net) 101.1 81.8 75.1
22. Unit Capacity Factor (Using DER Net) 99.1 80.1 73.8
23. Unit Forced Outage Rate 0.0 0.0 6.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down at End Of Report Period, Estimated Date of S'. tup:

N/A

26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved Initial Criticality 08/06/77 08/09/77 initial Electricity 08/20/77 08/l8/77 Commercial Operation 12/01/77 12/01/77 i

DOCKET NO.

50-348 UNIT l

DATE November 7,1994 COMPLETED IW R. D. Ilill TELEPilONE (205) 899-5156 MONTil _. October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 818 17 830 1

2 806 18 828 3

818 19 824 4

826 822 5

827 21 820 6

760 22 823 7

776 23 824 8

819 24 828 9

818 25 829 10 822 26 831 11 830 27 833 12 829 28 833 j

13 826 29 831 l

14 825 30 824 15 829 31 821 16 828 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-348 UNIT NANIE L hl. Farley - Unit I

~

DATE November 7,1994 CON 1PLETED BY R. D. Ilill REPORT N10NTil October TELEPflONE (205) 899-5156 y==7 g

l NIETilOD OF LICENSFE CAUSE ANDCORRtCTIVE DURAllON SIIIJrTING EVENT SYSTD1 CONtPONENT ACrloN To NO-D ATF_JYPE OlbEOURS REASON (2)jDOWN RifACIORQ}

RE PORT #

CODE (4)

CODE 5}_m PRL' VENT RECURRENCE p

l[0057~l0706/9F ~ F 15.0 i

A N/A N/A EL F-~iPBU-~TtTS00 on 10/6/94, the unit was ramped down to

~

ij 53 percent power to replace belts on the generator h(

f isophase bus duct cooling system.

j i

U f

The unit was returned to 100 percent power at

[

l 0900 on 10/7/94.

1 i

b i

i h

I i

!l l

ii n

i n

)

I i

1:

2.

3:

4:

5:

f: Forced Reason Ntethod Exhibit G-Instructions for Exhibit I - Same Saurce S: Scheduled A - Equipment Failure (Explain) 1 - N!anual Preparations of Date Entry It - Ntaintenance or Test 2 - Ntanual Scram Sheets for Licensee Esent C - Refueling 3 - Automatic Scram Report (LER) File (NUREG-0151)

D - Regulatary Restriction 4 - Other (Explain)

E - Operator Training & License Examination F - Administratise G - Operational Error (Explain) li-Other (Explain)

A Joseph M. Farley Nuclear Plant Unit 2 Narrative Summary of Operations October 1994 There were no unit shutdowns or major power reductions during the month.

There was no major safety related rnaintenance performed during the month.

1 l

l i

OPERATING DATA REPORT DOCKET NO.

50-364 DATE November 7,1994 COMPLETED IW R. D. Ilill TELEPilONE (205) 899-5156 OPERATING.STATilS 1.

Unit Name:

Joseph M. Farley - Unit 2 Notes 2.

Reporting Period:

October 1994

1) Cumulative data since 07-30-81, 3.

l.icensed Thermal Power (MWt):

2,652 date of commercial operation.

'4.

Nameplate Rating (Gross MWe):

829 860 5.

Design Electrical Rating (Net MWe):

6.

Maximum Dependable Capacity (Gross MWe):

863.6 7.

Maximum Dependable Capacity (Net MWe):

822 i

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Sinc 7 Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

N/A This Month Yr.to Date Cumulative

11. Ilours in Reporting Period 745.0 7,296.0 116,209.0
12. Number OfI fours Reactor Was Critical 745.0 7,282.0 100,235.7
13. Reactor Reserve Shutdown IIours 0.0 0.0 138.0
14. Ilours Generator On-line 745.0 7,264.8 98,826.6
15. Unit Reserve Shutdown Ilours 0.0 0.0_

0.0

16. Gross Thermal Energy Generated (MWII) 1,975,737.4 19,189,423.1 252,724,775.9
17. Gross Electrical Energy Generated (MWil) 651.169.0 6,311,805.0 82,861,266.0
18. Net Electrical Energy Generated (MWil) 621,025.0 6,013,337.0 78,588,426.0
19. Unit Service Factor 100.0 99.6 85.0
20. Unit Availabilty Factor 100.0 99.6 85.0
21. Unit Capacity Factor (Using MDC Net) 101.4 100.3 82.4 100.6 99.4 81.6
22. Unit Capacity Factor (Using DER Net) 0.0 0.4 4.0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

fefueling/ Maintenance outage, March 10.1995. Approximately 39 days.

25. It' Shut Down at End Of Report Period, Estimated Date of Startup:

N/A t

l

26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved Initial Criticality 05/_06/81 05/08/81 Initial Elcetricity 05/24/81 05/25/81 08/01/81 07/30/81 Commercial Operation

DOCKET NO.

50-364 UNIT 2

DATE_ November 7,1994 COMPl.ETED llY R. D. Ilill TELEPilONE (2_051 899-5156 MONTil October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

___._83_2 _ _

17 838 2

824 18 836 3

822 19 833 4

836 20 828 5

._835 21 828 6

832 22 831 7

828 23 833 8

826 24 837 9

830 25 839 10 838 26 841 11 838 27 843 28 843 12

_ _ _ - __ _ _ _ 8 3 5 __. _. _ _ _

13 835 29 841 14 834 30 834 15 837 31 828 16 839 INSTRUCTIONS On this lbrmat, list the average daily unit power level in MWe-Net Ihr each day in the reporting period. Compute to the nearest whole megawatt.

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-364 UNIT NAhtE 151. Farley - Unit 2 DATE November 7,1994 COh1PLETED BY R. D. Hill REPORT 510NTII October TELEPHONE (205) 899-5156 MET 1tOD OF

LICENSEE j cal'5E ANDCORRECT1\\T g

,fl

! CONIPONENT !.

l DURATION l SIIUTTING

E\\ TNT ' SYSTEM ACTION TO 1

_. ' - -TYPE (1)i liOLRS REASON C).DOWN REACTOR (3)! REPORT *.! CODE (4) I CODE (5) i PRFTTNT RECT'RRENCF h

I

. NO D ATF

!There were no shutdowns or power reductions during the month.

g I

4 I

t I

i I

{

4 i

t

(

i 4

i f

h i

a i

1 o

i 6

y f

l j

i 1:

i i

j 0

l II l

i i

t l

i i

i i

k t

I j

lt i

1 2.

3 4-5:

F - Forced Reason Mctbod Exhibit G-Instructmas fw Edibit I - Same Source S-kheduled A - Eqwpment Failure (Esplain) 1 - Manual Preparatmzis of Date Entry B - Maintenance er Test 2 - Manual Scram Sheets for Ucensee Esent C - Refachng 3 - Automatic Scram Repat tLER) File (NL REG-016I)

D-Regulatory Restnction 4 - Of a (Emplam)

E - Operator Training & Ucense Euminaim F-Adninistrathe G - Operational Erra (Esp!sm) 11 - Cnher (Est ain) l

--