ML20078F928

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-4.22 Re post-accident Sampling of Containment Air & EPIP-4.01 Re Radiological Assessment Director
ML20078F928
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/23/1983
From: Dewandel E
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML18141A153 List:
References
NUDOCS 8310110239
Download: ML20078F928 (3)


Text

. . . . _ _ - . . . ~

~ .-

p .

0' _

VIRGINIA ELECTRIC AND DOWER COMPANY Surry Power Station P.O. Sox 315 Surry,Virsmia 23883 September 23, 1983

c. : 7 o >40

^

USNRC DIVISION OF EMERGENCY PREPAREDNESS, 1 AND E MS-AR-5011 WASHINGTON, DC 20555 SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES Y

Enclosed are recently revised pages to the Surry Power Station Taargency Plan Implementing Procedures. Please take the following actions in order to keep your manual updated with the most recent revisions.

j b '~

EPIP-4.22 POST ACCIDEN'" SAMPLING OF CONTAINMENT AIR Remove and Destroy i

Entire Procedure Dated 02-24-83 EPIP-4.01 RADIOLOGICAL ASSESSMENT DIRECTOR CONTROLLING PROCEDURE l

Remove and Destroy Enter Pages 1 of 30 through Pages 1 of 31 through I 30 of 30 31 of 31 Dated 07-29-82 Dated 09-23-83 l

l l ,

I f

DR DO O O GO F PDR /

l

2

  1. ~

EPIP-4.09 SOURCE TERM ASSESSMENT Remove and Destroy Enter

~

Pages 1 of 9 through Pages 1 of 10 through 9 of 9 & Attachment 4 10 of 10 & Attachment 4 Dated 03-03-83 Dated 09-23-83 EPIP-4.12 0FFSITE ENVIRONMENTAL MONITORING INSTRUCTIONS Remove and Destroy Enter

~

Pages 1 of 7 through Pages 1 of 8 through 7 of 7 & Attachment 2 8 of 8 & Attachment 2 Dated 02-24-83 Dated 09-23-83 EPIP-4.13 0FFSITE RELEASE ASSESSMENT WITH ENVIRONMENTAL DATA Remove and Destroy Enter Pages 1 of 8 through Pages 1 of 9 through 8 of 8 and Page 1 of 1 9 of 9, Page 1 of 1 of Attachment 3 of Attachment 3 and Dat'ed 07-29-82 Attachment 5 Dated 09-23-83 EPIP-4.15 ONSITE MONITORING .

Remove and Destroy Enter Pages 1 of 9 and Pages 1 of 9 and Page 1 of 1 of Page 1 of 1 of Attachment 3 Attachment 3 Dated 02-24-83 Dated 09-23-83 EPIP-4.16 0FFSITE MONITORING Remove and Destroy Enter Pages 1 of 11 through Pages 1 of 12 through 11 of 11, Attachment 2 12 of 12 Attachment 2 and Attachment 4 and Attachment 4 Dated 02-24-83 Dated 09-23-83

~~ M 9

. 2

3 .

/"' EPIP-4.18 MONITORING OF EOF Remove and Destroy Enter Page 1 of 8 and Page 1 of 8 and -

Attachment 3 Attachment 3 Dated 02-24-83 Dated 09-23-83 EPIP-4.23 POST ACCIDENT SAMPLING OF REACTOR COOLANT Remove and Destroy Enter Pages 1 of 14 through Pages 1 of 14 through 14 of 14 14 of 14 Dated 02-24-83 Dated 09-23-83

/ e

/ l f

E. P. DeWandel {

Records Management Supervisor EPD/ mag 7-Attachments ,

I l

i 1

,. .a -

l l

1 l

- -_. . - - - -. , , , . - . . - . - - - - - . . , .