Text
y',-
e m ma ro w ccc1pany A0 kvr:nen Cenue Pekt.3 i Post 0"ce 80 1295 0,rm.ngna n Alaher a 35201 TeterMne POS B77 7122 L
Georgia Power
- c. K. uccoy vce ennaeni Nocear Voye Pqed r,eoutroen ewx 3.yern November 9, 1994 LCV-0360-G Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT Enclosed are the October 1994, monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units 1 and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.
Sincerely, f
v, C. K. McCoy CKM/JLL Enclosures cc: Osgria Power Comp _any Mr. J. B. Beasley, Jr.
Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle
- R t. n a p
9411150386 941031 PDR ADOCK 05000424 qL R
PDR I
y.
ENCLOSURE 1 4
VOGTLE ELECTRIC GENERATING PLANT - UNIT 1 j
MONTHLY OPERATING REPORT FOR OCTOBER 1994 TABLE OF CONTENTS NARRATIVE REPORT Page Vl-1 i
i OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 j
UNIT SHUTDOWNS AND POWER REDUCTIONS Page Vl-4 i
l l
ll
\\
1 l
NARRATIVE REPORT DOCKET NO. 50-424 UNIT.1 DATE:
NOVEMBER 1,1994 -
COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 1
OCTOBER 01 00:00 UNIT 1 IN DEFUELED MODE, PREPARATION FOR CORE RELOAD IN PROGRESS.
OCTOBER 02 19:50 UNIT 1 ENTERED MODE 6, CORE LOAD IN PROGRESS.
OCTOBER 06 03:24 UNIT 1 CORE LOAD COMPLETE.
OCTOBER 07 17:42 UNIT 1 REACTOR VESSEL HEAD SET.
OCTOBER 08 22:26 UNIT 1 REACTOR VESSEL HEAD TENSIONING COMPLETE, ENTERED MODE 5.
OCTOBER 11 12:44 UNIT 1 ENTERED MODE 4.
l OCTOBER 13 04:58 UNIT 1 ENTERED MODE 3.
OCTOBER 15 11:40 UNIT 1 ENTERED MODE 2.
OCTOBER 15 15:42 UNIT 1 REACTOR CRITICAL.
OCTOBER 16 14:42 UNIT 1 ENTERED MODE 1.
OCTOBER 16 20:15 UNIT 1 GENERATOR TIED TO GRID.
OCTOBER 17 18:46 UNIT 1 TURBINE TRIPPED FOR TURBINE OVERSPEED TESTING.
OCTOBER 17 21:21 UNIT 1 GENERATOR TIED TO GRID.
OCTOBER 22 06:00 UNIT 1 AT 100% POWER.
OCTOBER 31 23:59 UNIT 1 AT 100% POWER, NO OPERATIONAL PROBLEMS.
V1-1
4 OPERATING DATA REPORT DOCKET NO. 50-424 DATE:
NOVEMBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 1
- 2. REPORT PERIOD:
OCTOBER 1994
- 3. LICENSED THERMAL POWER (MWt):
3565 j
- 4. NAMEPLATE RATING (GROSS MWe):
1215
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1169
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1223
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1169
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
NA THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
745 7296 65041
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
393.3 6425.5 56300.6
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
362.2 6383.9 55256.8
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
1099701 21875986 185597184
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
367488 7457837 62440799
- 18. NET ELEC. ENERGY GENERATED (MWH):
341648 7107867 59349159
- 19. REACTOR SERVICE FACTOR 52.8 %
88.1 %
86.6 %
- 20. REACTOR AVAILABILITY FACTOR 52.8 %
88.1 %
86.6 %
- 21. UNIT SERVICE FACTOR:
48.6 %
87.5 %
85.0%
- 22. UNIT AVAILABILITY FACTOR:
48.6%
87.5 %
85.0%
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
39.2 %
83.4 %
82.6%
i
- 24. UNIT CAPACITY FACTOR (USING DER NET):
39.2 %
83.3 %
81.9 %
- 25. UNIT FORCED OUTAGE RATE:
0.0%
0.8%
5.0%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
NONE
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA l
i V1-2
UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE:
NOVEMBER 1,1S94 COMPLETED BY: G. L. HOOPER i
l TELEPHONE:
(706) 826-4104
)
DAY Net MW 1.
0 2.
O l
3.
0 l
4.
0 l
l 5.
0 6.
0 3
7.
0
)
8.
0 9.
0 10.
0 11.
0 12.
0 13.
0 14.
0 0
15.
16.
0 17..
152 18.
356 l
19.
478 20.
816 i
21.
1015 22.
1155 l
23..
1161 l
24.
1166 25.
1166 26.
1172
- l l
27.
1176
- 28.
1176
- 29.
1170
- 30.
1162 31.
1162
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE:
NOVEMBER 1,1994 UNIT NAME:
VEGP UNIT 1 COMPLETED BY: G. L. HOOPER I
TELEPHONE:
(706) 826-4104 REPORT MONTH OCTOBER 1994 i
R M
S E
E Y
T A
T LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE 94-4 9/10 S
380.2 C
4 1-94-6 XX XXXXXX SEE BELOW 94-5 10/17 S
2.6 B
1 NA TA Z77777 LEE BELOW F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLV S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN)
EVENER 4_-4 CAUSE; SCHEDULED REFUELING OUTAGE CORRECIIVEACIJON; NO MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE WAS PERFORMED CRLIlCALEAItiWAS; RELOAD FUEL AND VERIFY CORE, RESTORE AND DECON REFUELING CAVITY, TENSION HEAD AND COMPLETE REASSEMBLY, HEATUP, FUNCTIONAL TESTS FOR MODE 4, FUNCTIONAL TESTS FOR MODE 3, FUNCTIONAL TESTS FOR MODE 2, LOW POWER PHYSICS TESTING FOR MODE 1, RAISE POWER, BREAKER CLOSURE EVENT 94-5 CAUSEL UNIT TAKEN OFF LINE FOR TURBINE OVERSPEED TESTING CORRECINEACIlON:_ TESTING COMPLETED. UNIT RETURNED TO SERVICE.
V1-4
1 ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR OCTOBER 1994 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4 i
j j
NARRATIVE REPORT DOCKET NO. 50-425 UNIT 2 DATE:
NOVEMBER 1,1994 COMPLETED BY: G. L. HOOPER
~
TELEPHONE:
(706) 826-4104 i
OCTOBER 01 00:00 UNIT 2 AT 100% POWER WITH NO ODERATIONAL PROBLEMS.
OCTOBER 31 23:59 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.
V2-1
+
OPERATING DATA REPORT DOCKET NO. 50-425 DATE:
NOVEMBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 OPERATING STATUS
- 1. UNIT NAME:
VEGP UNIT 2
- 2. REPORT PERIOD:
OCTOBER 1994
- 3. LICENSED THERMAL POWER (MWt):
3565
- 4. NAMEPLATE RATING (GROSS MWe):
1215
- 5. DESIGN ELECTRICAL RATING (NET MWe):
1169
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1223
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1169
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
NA THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
745 7296 47785
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
745.0 6643.3 42683.7
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE:
745.0 6599.8 42126.2
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH):
2653771 23265621 140345119
- 17. GROSS ELEC. ENERGY GENERATED (MWH):
912290 7965242 47647279
- 18. NET ELEC. ENERGY GENERATED (MWH):
874260 7605162 45352639
- 19. REACTOR SERVICE FACTOR 100.0 %
91.1 %
89.3 %
- 20. REACTOR AVAILABILITY FACTOR 100.0 %
91.1 %
89.3%
- 21. UNIT SERVICE FACTOR:
100.0 %
90.5 %
88.2 %
- 22. UNIT AVAILABILITY FACTOR:
100.0 %
90.5 %
88.2 %
- 23. UNIT CAPACITY FACTOR (USING MDC NET):
100.4 %
89.2 %
84.9 %
- 24. UNIT CAPACITY FACTOR (USING DER NET):
100.4 %
89.2 %
84.9 %
- 25. UNIT FORCED OUTAGE RATE:
0.0%
5.9%
2.2%
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
REFUELING, FEBRUARY 26,1995,40 DAYS
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP :
NA V2-2
UNIT 2 AVERAGE DAILY DOCKET NO. 50-425 POWER LEVEL DATE:
NOVEMBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 DAY Net MW 1.
1166 2.
1164 3.
1173
- 4..
1180
- 5.
1179
- 1177
- 6.
7.
1175
- 8..
1169
- 9.
1163 10..
1173
- 11...
1181
- 12.
1175
- 13.
1171
- l 14.
1171
- 15.
1173
- 16.
1176
- l 17..
1178
- 18..
1179
- 1 19.
1173
- 20.
1166 21.
1171
- 22.
1170
- 23.
1166 24.
1176
- 25.
1176
- 26.
1180
- 27.
1179
- 28.
1179
- 29.
1180
- 30.
1172
- 31.
1169 *
l V2-3 i
~
UNIT SHUTOOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 DATE:
NOVEMBER 1,1994 UNIT NAME:
VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 REPORT MONTH OCTOBER 1994 R
M S
E E
Y T
A T
LICENSEE SC Y
S H
EVENT TO COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER ME (SUBCODE)
PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLV S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY P.ESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXPLAIN) f V2-4
i
)
ENCLOSURE 3 VOGTLE ELECTRIC GENERATING PLANT-UNITS 1 AND 2 CIIALLENGES TO PORY OR SAFETY VALVES DOCKET NOS. 50-424,50-425 DATE:
NOVEMBER 1,1994 COMPLETED BY: G. L. HOOPER TELEPHONE:
(706) 826-4104 EVENT DATE TAG NO.
TYPE DESCRIPTION NA NA NA NA
-