November 9, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket No. 50-328 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SQN) - DETAILED CONTROL ROOM DESIGN REVIEW (DCRDR)
PROGRAM IMPLEiENTATION FOR UNIT 2 (TAC No. M87235)
Reference:
NRC letter to TVA dated February 4, 1994, " Evaluation of the Detailed Control Room Design Review Program Implementation at the Sequoyah Nuclear Plant Units 1 and 2 (TAC Nos. M87234 and M87235)"
As requested in the above reference, this letter notifies NRC that TVA has completed the corrective actions for the Unit 2 human engineering discrepancies (HEDs). NRC determined that TVA had identified appropriate corrective actions for the HEDs at SQN by the above reference.
Staf f concerns regarding the SQN DCRDR program have been resolved by completing the corrective actions for safety-significant HEDs.
There are no commitments contained in this submittal. Please direct questions concerning this issue to K. C. Weller at (615) 843-7527.
Sincerely,
, N.
R. H. Shell Manager SQN Site Licensing cc:
See page 2 9411150357 941109
$ s i,0 PDR ADOCK 05000328 s
P peg j
a 4
o U.S. Nuclear tegulatory Commission Page 2 November 9, 1994 cc:
Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711
-