,1 Tennessee Vaney Asathonty Post Omce Box 2000. SodacDa,sy Tennessee 37379 November 9,1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket No. 50-328 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SON) - IMPLEMENTATION OF STATION BLACKOUT (SBO) COMMITMENTS FOR UNIT 2 (TAC NO. M89659)
The purpose of this letter is to provide the implementation status for SBO commitments to NRC. The procedure changes, prograrns, and modifications for Unit 2 have been completed. The modifications to the turbine-driven auxiliary feedwater level control valves have been completed to satisfy the last action for the Unit 2 SBO implementation. This same modification is the last remaining item for the Unit 1 SBO implementation and will be completed in the Unit 1 Cycle 7 refueling outage scheduled in September 1995.
Please direct questions concerning this issue to Keith Weller at (615) 843-7527.
Sincerely, kt N, R. H. Shell Manger SON Site Licensing cc: See page 2 f
0 94111 sos 46 941109 PDR ADOCK 0500o328 P
5
.s, U.S. Nuclear Regulatory Commission Page 2 November 9,1994 cc: Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector 4
Sequoyah Nuclear Plant 2600 lgou Ferry Road Soddy-Daisy, Tennessee 37379-3624 l
Regional Administrator U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711