Provides Implementation Status for SBO Commitments to Nrc. Procedure Changes,Programs & Mods for Unit 2 Completed
ML20078F691
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 11/09/1994
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M89659, NUDOCS 9411150346
Download: ML20078F691 (2)


Text

-.

1

,1 Tennessee Vaney Asathonty Post Omce Box 2000. SodacDa,sy Tennessee 37379 November 9,1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket No. 50-328 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SON) - IMPLEMENTATION OF STATION BLACKOUT (SBO) COMMITMENTS FOR UNIT 2 (TAC NO. M89659)

The purpose of this letter is to provide the implementation status for SBO commitments to NRC. The procedure changes, prograrns, and modifications for Unit 2 have been completed. The modifications to the turbine-driven auxiliary feedwater level control valves have been completed to satisfy the last action for the Unit 2 SBO implementation. This same modification is the last remaining item for the Unit 1 SBO implementation and will be completed in the Unit 1 Cycle 7 refueling outage scheduled in September 1995.

Please direct questions concerning this issue to Keith Weller at (615) 843-7527.

Sincerely, kt N, R. H. Shell Manger SON Site Licensing cc: See page 2 f

0 94111 sos 46 941109 PDR ADOCK 0500o328 P

PDR

5

.s, U.S. Nuclear Regulatory Commission Page 2 November 9,1994 cc: Mr. D. E. LaBarge, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector 4

Sequoyah Nuclear Plant 2600 lgou Ferry Road Soddy-Daisy, Tennessee 37379-3624 l