Category:INTERVENTION PETITIONS
MONTHYEARML20046D0121993-08-0909 August 1993 Pacific Gas & Electric Co Response to Supplemental Requests for Production of Documents Filed by San Luis Obispo Mothers for Peace.* W/Certificate of Svc.Related Correspondence ML20045D1991993-06-11011 June 1993 PG&E Supplemental Response to Miscellaneous Requests for Production of Documents Filed by San Luis Obispo Mothers for Peace.* W/Certificate of Svc.Related Correspondence ML20045A6571993-05-28028 May 1993 PG&E Response to Second Set of Supplemental Interrogatories & Requests for Production of Documents Cable Failures at Dcnpp Filed by San Luis Obispo Mothers for Peace.* W/Certificate of Svc.Related Correspondence ML20045A6501993-05-26026 May 1993 PG&E Response to Miscellaneous Requests for Production of Documents Filed by San Luis Obispo Mothers for Peace.* W/Certificate of Svc.Related Correspondence ML20056C0921993-03-16016 March 1993 San Luis Obispo Mothers for Peace Second late-filed Contention.* Suppls San Luis Obispo Mothers for Peace Suppl to Petition to Intervene.License Extension Request Should Be Denied Until Situation Resolved.W/Certificate of Svc ML20128B8181992-11-30030 November 1992 NRC Staff Response to San Luis Obispo Mothers for Peace Suppl to Petition to Intervene.* Petitioner 920818 Petition Requesting Hearing as Suppl by 921026 Suppl to Petition to Intervene Should Be Denied ML20128A1301992-11-18018 November 1992 Pacific Gas & Electric Co Response to Petitioner Suppl to Petition to Intervene.* Certificate of Svc Encl ML20116F0321992-10-26026 October 1992 San Luis Obispo Mothers for Peace Suppl to Petition to Intervene.* Petitioner Requests That PG&E Be Denied Request for Extension of License & That NEPA Stds Be Met. W/Certificate of Svc ML20127D5071992-09-0404 September 1992 Pacific Gas & Electric Co Answer to Request for Hearing & Petition to Intervene.* Ltr, Requesting Hearing & Intervenor Status Does Not Satisfy Requirements for Intervention & Should Be Denied.W/Certificate of Svc ML20247Q6091989-07-24024 July 1989 Sierra Club Request to Withdraw Contentions.* Requests That All Outstanding Contentions in Current Proceedings Be Withdrawn W/Understanding That Further Discussion W/Nrc Re Implementation of NEPA Will Occur.W/Certificate of Svc ML20151T4351988-04-25025 April 1988 Amended Petition to Intervene.* License Condition 2.C.(7) of Full Power License DPR-80 Requires That Long Term Seismic Program Final Rept Be Submitted on 880731.Util License Amend Request Inadequate & Must Be Denied.W/Certificate of Svc ML20155H1111986-05-0909 May 1986 Response Supporting Amended Petitions of San Louis Obispo Mothers for Peace,Consumers Organized for Defense of Environ Safety & Sierra Club for Leave to Intervene & Request for Hearing.W/Certificate of Svc ML20203L5191986-04-26026 April 1986 Petition of Consumers Organized for Defense of Environ Safety for Leave to Intervene & Request for Hearing ML20203L5361986-04-26026 April 1986 Contentions Opposing Util Request to Increase Waste Storage by Reracking Spent Fuel Pools.Alternatives to Reracking Not Considered.Consideration of Seismic Design Premature Since Program Not to Be Completed Until 1988 ML20203G2681986-04-24024 April 1986 Contentions of Sierra Club Re Consideration of Issuance of Amends to Licenses DPR-80 & DPR-82 on Proposed Reracking of Spent Fuel Pools & Proposed NSHC Determination Before NRC ML20210K6791986-04-22022 April 1986 Contentions on Util Request to Increase Waste Storage by Reracking Spent Fuel Pools.Alternatives to Proposed Reracking Listed,Including Contracting Out or Transshipment of Spent Fuel for Storage at govt-owned Spent Fuel Facility ML20147D9761986-03-17017 March 1986 Mothers for Peace Amend to Petition to Intervene.* Forwards Sworn Statement from N Culver Authorizing Mothers for Peace to Act on Her Behalf in NRC Proceedings Re Util Application Re Spent Fuel Storage.W/O Statement.Served on 860325 ML20154D5581986-03-0303 March 1986 Response Opposing Consumers Organized for Defense of Environ Safety & Sierra Club Petition for Leave to Intervene Re Util Request to Increase Spent Fuel Storage Capacity.W/Notice of Appearance & Certificate of Svc ML20154C2911986-02-27027 February 1986 Response to Mothers for Peace 860207 Petition for Leave to Intervene Re Util Request for Amends to Licenses DPR-80 & DPR-82,increasing Spent Fuel Storage Capacity.Time Needed to Satisfy Standing Requirements.W/Certificate of Svc ML20154B7811986-02-27027 February 1986 Answer to Consumers Organized for Defense of Environ Safety (Codes) Petition for Leave to Intervene.Petition Fatally Defective & Should Be Denied.Certificate of Svc Encl ML20205J7621986-02-12012 February 1986 Petition of Consumers Organized for Defense of Environ Safety for Leave to Intervene & Request for Hearing.Served on 860225 ML20205J6821986-02-10010 February 1986 Petition of Sierra Club for Leave to Intervene in Any Hearing Called by Commission to Hear Arguments on Amends to Licenses DPR-80 & DPR-82.Served on 860225 ML20147E0081986-02-0707 February 1986 License Amend to Rerack Spent Fuel Pools.* Request for Hearing & Petition for Leave to Intervene in Consideration of Issuance of Amends to Licenses DPR-80 & DPR-82 Re Spent Fuel Pool Reracking ML20087J1931984-03-20020 March 1984 Renewal of Application for Stay to Permit Review of Joint Intervenors Emergency Motion.Unexecuted Affidavit of M Kaku & Certificate of Svc Encl ML20087F2181984-03-15015 March 1984 Motion for Leave to File Reply to Util Answer in Opposition to Motion to Reopen Record.Certificate of Svc Encl ML20080B5181984-02-0303 February 1984 Motion for Leave to File Reply to Util & NRC Answers to Joint Intervenors 840109 Petition for Review of ALAB-756 ML20090H3641983-10-25025 October 1983 Reply to Util Objections to Joint Intervenors Proposed Exhibits.Objections Should Be Overruled.Certificate of Svc Encl ML20085L3571983-10-20020 October 1983 Objection to Joint Intervenors Proposed Exhibits 128 & 129 & State of CA Governor Exhibit 11 Re Design Qa.Exhibits Irrelevant & Immaterial to Proceeding.Certificate of Svc Encl ML20078F5591983-10-0404 October 1983 Response Opposing Governor Deukmejian & Joint Intervenors 830929 Addl Contentions on Qa.Contentions Lack Specificity &/Or Fail to Meet Criteria for late-filed Contentions. Certificate of Svc Encl ML20080M5911983-09-29029 September 1983 Addl Contentions on Design QA ML20078B5191983-09-22022 September 1983 Response Opposing Governor Deukmejian & Joint Intervenors 830908 Particularization of Contentions 3 & 4 Submitted Per Aslab 830826 Order.Contentions Are Unaccompanied by Facts Upon Which Claims Based.Certificate of Svc Encl ML20078A5151983-09-21021 September 1983 Answer Opposing Joint Intervenors 830906 Request for Hearing on Decision to Lift Suspension of License DPR-76.No Legal or Factual Basis Provided.Precedent Re TMI Restart Hearing Inapplicable.Certificate of Svc Encl ML20080J2731983-09-21021 September 1983 Response Opposing Joint Intervenors 830908 Request for Formal Hearing on Reinstatement of Low Power Ol.Neither Atomic Energy Act Nor Rationale for TMI-1 Hearing Mandates Formal Hearing.Certificate of Svc Encl ML20080F1031983-09-13013 September 1983 Answer Opposing Joint Intervenors 830829 Request for Hearing on Util 830817 Request for Extension of License DPR-76 from 1 to 3 Yrs from Date of Issuance.Request Subsumed by full-term OL Request.Certificate of Svc Encl ML20077N3701983-09-0808 September 1983 Governor Deukmejian & Joint Intervenors Contentions on Design Qa.Certificate of Svc Encl ML20081A4551983-09-0808 September 1983 Contentions on Design QA Re Verification of Samples for Idvp ML20024F3691983-09-0606 September 1983 Request for Hearing on Issues Re Lifting of Suspended Low Power OL & Effectiveness of 1-yr Low Power OL 2 Yrs After Issuance.Certificate of Svc Encl ML20076G8921983-08-29029 August 1983 Request for Hearing on 830817 Application for Amend to License DPR-76 to Extend Term of Suspended Low Power OL to 3 Yrs from Date of Issuance.Certificate of Svc Encl ML20076B9741983-08-16016 August 1983 Reply to Util & NRC Responses to Joint Intervenors & Governor Deukmejian Contentions on Design Qa.Adequate Basis for Contentions Supplied by June 1982 Motion to Reopen Record.Certificate of Svc Encl ML20080C2291983-08-16016 August 1983 Reply to Util & NRC Responses to Governor Deukmejian Contentions on Design Qa.Focus of Hearing Should Be on Effectiveness of Idvp & Internal Technical Program (ITP) & Whether Programs Assure Safety.Certificate of Svc Encl ML20024D6191983-08-0101 August 1983 Response Opposing Governor Deukmejian & Joint Intervenors Proposed Contentions on Design Qa.Contentions Should Be Dismissed for Noncompliance W/Applicable Regulations & Case Law.Certificate of Svc Encl ML20077F9121983-07-19019 July 1983 Contentions Re Failure of Applicant & Major Subcontractors to Develop & Implement Timely Qa/Qc Program for Design & Redesign of Structures,Sys & Components Important to Safety ML20024D2201983-07-15015 July 1983 Contentions of Governor Deukmejian Re Failure of Applicant & Major Subcontractors to Develop & Implement Timely Qa/Qc Program for Design & Redesign of Structures,Sys & Components Important to Safety ML20027B2501982-09-13013 September 1982 Reply to Util Opposition to Joint Intervenors 820811 Request for Hearing on Util 820803 Application for Amend to Unit 1 Ol.Regulations Provide No Distinction Between Amend to OL & Amend for OL Renewal.Certificate of Svc Encl ML20063K2561982-09-0101 September 1982 Response Supporting Joint Intervenors 820817 Request for Hearing.Util Application for License Amend Extending Suspended Low Power OL Expiration Date Requires Hearing. Certificate of Svc Encl ML20063M2191982-09-0101 September 1982 Reply Opposing Joint Intervenor 820817 Request for Hearing on Util Application for Renewal of Low Power Ol.License Renewals Are Not Amends within Rules Governing Proceedings. Certificate of Svc Encl ML20062M9371982-08-17017 August 1982 Request for Hearing on Util 820803 Application for Amend to License DPR-76,which Would Renew Low Power License Granted on 810921 & Suspended on 811119.Certificate of Svc Encl ML20236N2081974-01-23023 January 1974 Answer to 740114 Petition for Leave to Intervene Filed by Jj Forster & L Valentine.Petition Should Be Denied. Certificate of Svc Encl ML20236N2861973-11-20020 November 1973 Petition of Jj Forster & L Valentine for Leave to Intervene ML20236N3151973-11-15015 November 1973 Petition of Ee Apfelberg & SA Silver as Representatives of San Luis Obispo Mothers of Peace for Leave to Intervene 1993-08-09
[Table view] Category:RESPONSES & CONTENTIONS
MONTHYEARML20046D0121993-08-0909 August 1993 Pacific Gas & Electric Co Response to Supplemental Requests for Production of Documents Filed by San Luis Obispo Mothers for Peace.* W/Certificate of Svc.Related Correspondence ML20045D1991993-06-11011 June 1993 PG&E Supplemental Response to Miscellaneous Requests for Production of Documents Filed by San Luis Obispo Mothers for Peace.* W/Certificate of Svc.Related Correspondence ML20045A6571993-05-28028 May 1993 PG&E Response to Second Set of Supplemental Interrogatories & Requests for Production of Documents Cable Failures at Dcnpp Filed by San Luis Obispo Mothers for Peace.* W/Certificate of Svc.Related Correspondence ML20045A6501993-05-26026 May 1993 PG&E Response to Miscellaneous Requests for Production of Documents Filed by San Luis Obispo Mothers for Peace.* W/Certificate of Svc.Related Correspondence ML20056C0921993-03-16016 March 1993 San Luis Obispo Mothers for Peace Second late-filed Contention.* Suppls San Luis Obispo Mothers for Peace Suppl to Petition to Intervene.License Extension Request Should Be Denied Until Situation Resolved.W/Certificate of Svc ML20128B8181992-11-30030 November 1992 NRC Staff Response to San Luis Obispo Mothers for Peace Suppl to Petition to Intervene.* Petitioner 920818 Petition Requesting Hearing as Suppl by 921026 Suppl to Petition to Intervene Should Be Denied ML20128A1301992-11-18018 November 1992 Pacific Gas & Electric Co Response to Petitioner Suppl to Petition to Intervene.* Certificate of Svc Encl ML20116F0321992-10-26026 October 1992 San Luis Obispo Mothers for Peace Suppl to Petition to Intervene.* Petitioner Requests That PG&E Be Denied Request for Extension of License & That NEPA Stds Be Met. W/Certificate of Svc ML20127D5071992-09-0404 September 1992 Pacific Gas & Electric Co Answer to Request for Hearing & Petition to Intervene.* Ltr, Requesting Hearing & Intervenor Status Does Not Satisfy Requirements for Intervention & Should Be Denied.W/Certificate of Svc ML20247Q6091989-07-24024 July 1989 Sierra Club Request to Withdraw Contentions.* Requests That All Outstanding Contentions in Current Proceedings Be Withdrawn W/Understanding That Further Discussion W/Nrc Re Implementation of NEPA Will Occur.W/Certificate of Svc ML20151T4351988-04-25025 April 1988 Amended Petition to Intervene.* License Condition 2.C.(7) of Full Power License DPR-80 Requires That Long Term Seismic Program Final Rept Be Submitted on 880731.Util License Amend Request Inadequate & Must Be Denied.W/Certificate of Svc ML20155H1111986-05-0909 May 1986 Response Supporting Amended Petitions of San Louis Obispo Mothers for Peace,Consumers Organized for Defense of Environ Safety & Sierra Club for Leave to Intervene & Request for Hearing.W/Certificate of Svc ML20203L5191986-04-26026 April 1986 Petition of Consumers Organized for Defense of Environ Safety for Leave to Intervene & Request for Hearing ML20203L5361986-04-26026 April 1986 Contentions Opposing Util Request to Increase Waste Storage by Reracking Spent Fuel Pools.Alternatives to Reracking Not Considered.Consideration of Seismic Design Premature Since Program Not to Be Completed Until 1988 ML20203G2681986-04-24024 April 1986 Contentions of Sierra Club Re Consideration of Issuance of Amends to Licenses DPR-80 & DPR-82 on Proposed Reracking of Spent Fuel Pools & Proposed NSHC Determination Before NRC ML20210K6791986-04-22022 April 1986 Contentions on Util Request to Increase Waste Storage by Reracking Spent Fuel Pools.Alternatives to Proposed Reracking Listed,Including Contracting Out or Transshipment of Spent Fuel for Storage at govt-owned Spent Fuel Facility ML20147D9761986-03-17017 March 1986 Mothers for Peace Amend to Petition to Intervene.* Forwards Sworn Statement from N Culver Authorizing Mothers for Peace to Act on Her Behalf in NRC Proceedings Re Util Application Re Spent Fuel Storage.W/O Statement.Served on 860325 ML20154D5581986-03-0303 March 1986 Response Opposing Consumers Organized for Defense of Environ Safety & Sierra Club Petition for Leave to Intervene Re Util Request to Increase Spent Fuel Storage Capacity.W/Notice of Appearance & Certificate of Svc ML20154C2911986-02-27027 February 1986 Response to Mothers for Peace 860207 Petition for Leave to Intervene Re Util Request for Amends to Licenses DPR-80 & DPR-82,increasing Spent Fuel Storage Capacity.Time Needed to Satisfy Standing Requirements.W/Certificate of Svc ML20154B7811986-02-27027 February 1986 Answer to Consumers Organized for Defense of Environ Safety (Codes) Petition for Leave to Intervene.Petition Fatally Defective & Should Be Denied.Certificate of Svc Encl ML20205J7621986-02-12012 February 1986 Petition of Consumers Organized for Defense of Environ Safety for Leave to Intervene & Request for Hearing.Served on 860225 ML20205J6821986-02-10010 February 1986 Petition of Sierra Club for Leave to Intervene in Any Hearing Called by Commission to Hear Arguments on Amends to Licenses DPR-80 & DPR-82.Served on 860225 ML20147E0081986-02-0707 February 1986 License Amend to Rerack Spent Fuel Pools.* Request for Hearing & Petition for Leave to Intervene in Consideration of Issuance of Amends to Licenses DPR-80 & DPR-82 Re Spent Fuel Pool Reracking ML20087J1931984-03-20020 March 1984 Renewal of Application for Stay to Permit Review of Joint Intervenors Emergency Motion.Unexecuted Affidavit of M Kaku & Certificate of Svc Encl ML20087F2181984-03-15015 March 1984 Motion for Leave to File Reply to Util Answer in Opposition to Motion to Reopen Record.Certificate of Svc Encl ML20080B5181984-02-0303 February 1984 Motion for Leave to File Reply to Util & NRC Answers to Joint Intervenors 840109 Petition for Review of ALAB-756 ML20090H3641983-10-25025 October 1983 Reply to Util Objections to Joint Intervenors Proposed Exhibits.Objections Should Be Overruled.Certificate of Svc Encl ML20085L3571983-10-20020 October 1983 Objection to Joint Intervenors Proposed Exhibits 128 & 129 & State of CA Governor Exhibit 11 Re Design Qa.Exhibits Irrelevant & Immaterial to Proceeding.Certificate of Svc Encl ML20078F5591983-10-0404 October 1983 Response Opposing Governor Deukmejian & Joint Intervenors 830929 Addl Contentions on Qa.Contentions Lack Specificity &/Or Fail to Meet Criteria for late-filed Contentions. Certificate of Svc Encl ML20080M5911983-09-29029 September 1983 Addl Contentions on Design QA ML20078B5191983-09-22022 September 1983 Response Opposing Governor Deukmejian & Joint Intervenors 830908 Particularization of Contentions 3 & 4 Submitted Per Aslab 830826 Order.Contentions Are Unaccompanied by Facts Upon Which Claims Based.Certificate of Svc Encl ML20078A5151983-09-21021 September 1983 Answer Opposing Joint Intervenors 830906 Request for Hearing on Decision to Lift Suspension of License DPR-76.No Legal or Factual Basis Provided.Precedent Re TMI Restart Hearing Inapplicable.Certificate of Svc Encl ML20080J2731983-09-21021 September 1983 Response Opposing Joint Intervenors 830908 Request for Formal Hearing on Reinstatement of Low Power Ol.Neither Atomic Energy Act Nor Rationale for TMI-1 Hearing Mandates Formal Hearing.Certificate of Svc Encl ML20080F1031983-09-13013 September 1983 Answer Opposing Joint Intervenors 830829 Request for Hearing on Util 830817 Request for Extension of License DPR-76 from 1 to 3 Yrs from Date of Issuance.Request Subsumed by full-term OL Request.Certificate of Svc Encl ML20077N3701983-09-0808 September 1983 Governor Deukmejian & Joint Intervenors Contentions on Design Qa.Certificate of Svc Encl ML20081A4551983-09-0808 September 1983 Contentions on Design QA Re Verification of Samples for Idvp ML20024F3691983-09-0606 September 1983 Request for Hearing on Issues Re Lifting of Suspended Low Power OL & Effectiveness of 1-yr Low Power OL 2 Yrs After Issuance.Certificate of Svc Encl ML20076G8921983-08-29029 August 1983 Request for Hearing on 830817 Application for Amend to License DPR-76 to Extend Term of Suspended Low Power OL to 3 Yrs from Date of Issuance.Certificate of Svc Encl ML20076B9741983-08-16016 August 1983 Reply to Util & NRC Responses to Joint Intervenors & Governor Deukmejian Contentions on Design Qa.Adequate Basis for Contentions Supplied by June 1982 Motion to Reopen Record.Certificate of Svc Encl ML20080C2291983-08-16016 August 1983 Reply to Util & NRC Responses to Governor Deukmejian Contentions on Design Qa.Focus of Hearing Should Be on Effectiveness of Idvp & Internal Technical Program (ITP) & Whether Programs Assure Safety.Certificate of Svc Encl ML20024D6191983-08-0101 August 1983 Response Opposing Governor Deukmejian & Joint Intervenors Proposed Contentions on Design Qa.Contentions Should Be Dismissed for Noncompliance W/Applicable Regulations & Case Law.Certificate of Svc Encl ML20077F9121983-07-19019 July 1983 Contentions Re Failure of Applicant & Major Subcontractors to Develop & Implement Timely Qa/Qc Program for Design & Redesign of Structures,Sys & Components Important to Safety ML20024D2201983-07-15015 July 1983 Contentions of Governor Deukmejian Re Failure of Applicant & Major Subcontractors to Develop & Implement Timely Qa/Qc Program for Design & Redesign of Structures,Sys & Components Important to Safety ML20027B2501982-09-13013 September 1982 Reply to Util Opposition to Joint Intervenors 820811 Request for Hearing on Util 820803 Application for Amend to Unit 1 Ol.Regulations Provide No Distinction Between Amend to OL & Amend for OL Renewal.Certificate of Svc Encl ML20063K2561982-09-0101 September 1982 Response Supporting Joint Intervenors 820817 Request for Hearing.Util Application for License Amend Extending Suspended Low Power OL Expiration Date Requires Hearing. Certificate of Svc Encl ML20063M2191982-09-0101 September 1982 Reply Opposing Joint Intervenor 820817 Request for Hearing on Util Application for Renewal of Low Power Ol.License Renewals Are Not Amends within Rules Governing Proceedings. Certificate of Svc Encl ML20062M9371982-08-17017 August 1982 Request for Hearing on Util 820803 Application for Amend to License DPR-76,which Would Renew Low Power License Granted on 810921 & Suspended on 811119.Certificate of Svc Encl ML20236N2081974-01-23023 January 1974 Answer to 740114 Petition for Leave to Intervene Filed by Jj Forster & L Valentine.Petition Should Be Denied. Certificate of Svc Encl ML20236N2861973-11-20020 November 1973 Petition of Jj Forster & L Valentine for Leave to Intervene ML20236N3151973-11-15015 November 1973 Petition of Ee Apfelberg & SA Silver as Representatives of San Luis Obispo Mothers of Peace for Leave to Intervene 1993-08-09
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARDCL-99-123, Comment on Prs 10CFR50 & 72 Re Reporting Requirements for Nuclear Power Reactors & Draft NUREG-1022, Event Reporting Guidelines. Util Areas of Concern Includes ESF Actuations, Significantly Degraded Components & Historical Limitations1999-09-20020 September 1999 Comment on Prs 10CFR50 & 72 Re Reporting Requirements for Nuclear Power Reactors & Draft NUREG-1022, Event Reporting Guidelines. Util Areas of Concern Includes ESF Actuations, Significantly Degraded Components & Historical Limitations ML20205N4081999-04-14014 April 1999 Comments Opposing Proposed Rules 10CFR2,19 & 20 Re Proposed Repository at Yucca Mountain.Requests Information on How Much Radiation Being Released Now at Diablo & Hanford NPPs ML20205N4601999-03-21021 March 1999 Introduces K Schumann as Representative of Nuclear Waste Committee (Nuwic) of San Lius Obispo County.Informs That Nuwic & Nuclear Waste Management Committee Concerned with Transportation of Spent Nuclear Fuel Rods from Dcnpp ML20195E8841998-11-24024 November 1998 Petition for Mod to OLs to Require Plant Owner to Have Independent Contractor Evaluate Plant Safety Culture ML20236T3011998-07-24024 July 1998 Order Prohibiting Involvement in NRC Licensed Avtivities (Effective Immediately).Lh Brooks Prohibited for 5 Yrs from Date of Order from Engaging in NRC Licensed Activities ML20248C2261998-05-22022 May 1998 Comment Opposing Revised Proposed Rule 10CFR50 Re Protection & Safety Sys ML20129J4191996-10-18018 October 1996 Order Approving Application Re Corporate Restructuring of Pacific Gas & Electric Company by Establishment of Holding Company DCL-95-206, Comment Supporting Petition for Rulemaking PRM-50-61 Re Improving Fire Protection Regulations1995-10-0606 October 1995 Comment Supporting Petition for Rulemaking PRM-50-61 Re Improving Fire Protection Regulations ML20091P8721995-08-23023 August 1995 Comment Opposing Petition for Rulemaking PRM-50-61 Re Nuclear Energy Institute Proposed Amends on Fire Safety for All NPPs DCL-95-001, Comment on Proposed Changes to Reactor Pressure Vessel Integrity Rule 10CFR50.Endorses NEI Comments1995-01-0303 January 1995 Comment on Proposed Changes to Reactor Pressure Vessel Integrity Rule 10CFR50.Endorses NEI Comments ML20077M7521994-12-30030 December 1994 Comment Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operation for Nuclear Power Reactors DCL-94-270, Comment on Proposed Rules 10CFR2,51 & 54 Re Rulemaking for NPP License Renewal.Endorses Comments & Changes Proposed by NEI 941208 Submittal1994-12-0808 December 1994 Comment on Proposed Rules 10CFR2,51 & 54 Re Rulemaking for NPP License Renewal.Endorses Comments & Changes Proposed by NEI 941208 Submittal ML20149H0851994-11-0404 November 1994 Initial Decision (Construction Period Recovery/Recapture).* Renewed Motion to Reopen Record 940808,denied.Served on 941104.W/Certificate of Svc ML20072L2651994-08-23023 August 1994 PG&E Opposition to San Luis Obispo Mothers for Peace Renewed Motion to Reopen Record.* Util Opposes San Luis Obispo for Peace Motion Based on Affidavit Stating No Evidence Found in Motion Re Flaw in Program.W/Certificate of Svc ML20072F0291994-08-12012 August 1994 Erratum to San Luis Obispo Mothers for Peace Motion to Reopen Record.* Intervenors Corrects Error in Renewed Motion to Reopen Record Re Application for License Amend to Extend Term of Operating License for Plant.W/Certificate of Svc ML20072B2651994-08-0909 August 1994 Comment Supporting Proposed Rule 10CFR26 Re FFD Requirements Concerning Random Drug Testing ML20072A5821994-08-0808 August 1994 San Luis Obispo Mothers for Peace Renewed Motion to Reopen Record Re PG&E Application for Amend to Extend Term of OL for Plant.* Motion to Reopen Record to Introduce Insp Rept Identifying Alleged Problems W/Plant.W/Certificate of Svc ML20071L2061994-07-26026 July 1994 Comment Supporting Proposed Rule 10CFR26 Re Changing Current Drug Testing Policies to Exclude All Personnel in nonsafety-related Positions ML20072B8481994-07-26026 July 1994 Comment Opposing Proposed Rule 10CFR26 Re Changes to FFD Requirements Concerning Random Drug Testing ML20071L1901994-07-20020 July 1994 Comments on Proposed Rule 10CFR26 Re Relaxing Rule on Drug Testing of Employees Working at NPP DCL-94-134, Comment Supporting Petition for Rulemaking PRM-50-60 Re Amend to 10CFR50.54 by Changing Frequency W/Which Each Licensee Conducts Independent Reviews of Emergency Preparedness Program1994-06-27027 June 1994 Comment Supporting Petition for Rulemaking PRM-50-60 Re Amend to 10CFR50.54 by Changing Frequency W/Which Each Licensee Conducts Independent Reviews of Emergency Preparedness Program DCL-94-135, Comment Supporting Petition for Rulemaking PRM-50-59 Re Proposed Amend to 10CFR50.54(p) Concerning Frequency W/Which Licensee Conducts Independent Reviews of Security Programs1994-06-27027 June 1994 Comment Supporting Petition for Rulemaking PRM-50-59 Re Proposed Amend to 10CFR50.54(p) Concerning Frequency W/Which Licensee Conducts Independent Reviews of Security Programs ML20064D1791994-03-0707 March 1994 Pacific Gas and Electric Co Reply in Opposition to San Luis Obispo Mothers for Peace Motion to Reopen Record.* Motion to Reopen Record Denied.W/Certificate of Svc ML20064D1961994-03-0404 March 1994 Affidavit of Mj Angus Re Motion to Reopen Record ML20063L5721994-02-25025 February 1994 San Luis Obispo Mothers for Peace Re Util Application for License Amend to Extend Term of Operating License for Plant.* Advises That Record of Proceeding Should Be Reopened to Consider Insp 93-36 Re Util Surveillance of Asw Sys DCL-94-021, Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication Facilitation1994-01-26026 January 1994 Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication Facilitation ML20059D2431994-01-0707 January 1994 Package of Intervenor Exhibits Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence ML20062N0001993-12-30030 December 1993 PG&E Reply Findings of Fact & Conclusions of Law.* Mothers for Peace Proposed Findings & Conclusions Do Not Provide Any Supportable Rationale to Change Findings & Conclusions Previously Proposed by Pg&E.W/Certificate of Svc ML20058P3931993-12-22022 December 1993 NRC Staff Findings of Fact & Conclusions of Law in Form of Initial Decision.* Certificate of Svc ML20058K7491993-12-0202 December 1993 NRC Staff Motion for Extension of Time.* Board Has Extended Filing Time for Util Until 931230.W/Certificate of Svc. Served on 931206.Granted for Board on 931203 ML20058K8771993-12-0202 December 1993 NRC Staff Motion for Extension of Time.* Requests That Board Extend Date for Staff to File Findings Until 931222. W/Certificate of Svc ML20059M5291993-11-19019 November 1993 Applicant Exhibits A-21,A-22,A-24,A-25,A-26,A-29 & A-F1, Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence ML20058E0741993-11-19019 November 1993 San Luis Obispo Mothers for Peace Proposed Findings of Fact & Conclusions of Law Re Licensee Application for License Amend to Extend Term of Operating License for Plant.* W/ Certificate of Svc ML20059E8931993-10-28028 October 1993 Memorandum & Order (Motion for Extension of Time).* San Luis Obispo Mothers for Peace 931018 Request for two-wk Extension of Time to File Proposed Findings of Fact & Conclusions of Law Granted.W/Certificate of Svc.Served on 931029 ML20059E8531993-10-27027 October 1993 NRC Staff Response to Board Memorandum & Order Re Extension of Time.* Staff Believes That San Luis Obispo Mothers for Peace Has Shown No Good Cause for Requesting Extension to File Proposed Findings of Fact.W/Certificate of Svc ML20059E8631993-10-25025 October 1993 Pacific Gas & Electric Co Response to Motion for Extension of Time.* Util Does Not Agree W/Board Assessment That Mothers for Peace Request Appears to Be Reasonable But Will Not Oppose Request.W/Certificate of Svc ML20059B2191993-10-19019 October 1993 Memorandum & Order (Responses to Motion for Extension of Time).* Board Believes Intervenor Request for Extension of Time to File Proposed Findings of Fact Appears Reasonable. W/Certificate of Svc.Served on 931019 ML20059B1071993-10-18018 October 1993 San Luis Obispo Mothers for Peace Motion for Extension of Time for Filing Proposing Findings of Fact & Conclusions of Law.* Requests Extension of Two Wks or Until 931119 to File Proposed Findings of Fact.W/Certificate of Svc ML20057D0531993-09-23023 September 1993 Notice of Appearance.* Notice Given That Undersigned Attorney Enters Appearance in Listed Matter & Listed Info Provided.W/Certificate of Svc ML20057B0401993-09-14014 September 1993 NRC Staff Reply to PG&E Response to Staff Motion to Amend Protective Order.* NRC Staff Moves Board to Adopt Language Requested in 930817 Motion as Stated.W/Certificate of Svc ML20056G4891993-08-30030 August 1993 Pacific Gas & Electric Co Response to Motion to Amend Protective Order.* Staff Asks That Protective Order Be Clarified by Adding New Footnote to Paragraph 3 of Order. W/Certificate of Svc ML20059M1381993-08-24024 August 1993 Staff Exhibit S-1,consisting of Re 920519 Enforcement Conference ML20059D2071993-08-24024 August 1993 Intervenor Exhibit I-MFP-193,consisting of Review of LER 1-90-015-00,re Docket 50-275,dtd 910118 ML20059D2241993-08-24024 August 1993 Intervenor Exhibit I-MFP-220,consisting of Protest of Util ML20059M8621993-08-24024 August 1993 Intervenor Exhibit I-MFP-35,consisting of Rept, Self- Evaluation of Diablo Canyon Power Plant, Dtd Jul 1993 IR 05000275/19920261993-08-24024 August 1993 Intervenor Exhibit I-MFP-118,consisting of Notice of Violation & Insp Rept Re Docket 50-275/92-26 & 50-323/93-26,dtd 921113 ML20059D0841993-08-24024 August 1993 Intervenor Exhibit I-MFP-139,consisting of Insp Rept Re Dockets 50-275 & 50-323,dtd 920417 IR 05000275/19920131993-08-24024 August 1993 Intervenor Exhibit I-MFP-140,consisting of 920416,mgt Meeting Repts 50-275/92-13 & 50-323/92-13 IR 05000275/19910061993-08-24024 August 1993 Intervenor Exhibit I-MFP-71,consisting of Rept of EC W/Util Mgt,Re Rept Numbers 50-275/91-06 & 50-323/91-06,dtd 910411 IR 05000275/19930111993-08-24024 August 1993 Intervenor Exhibit I-MFP-26,consisting of Re Insp Repts 50-275/93-11 & 50-323/93-11 1999-09-20
[Table view] |
Text
-. _
r__
. y*
~
0 @ 0 $ 0 M il\ l CCtdETED USt2C 1 UNITED STATES OF AMERICA
'83 001 -6 P2:14 2 NUCLEAR REGULATORY COMMISSION 3 0FFCE F SE M .-
00CdEI!hG Ie IEP'4"
!?.4 t:CM 4
BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD 5
6 7 In the Matter of )
) Docket No. 50-275 8 PACIFIC GAS AND ELECTRIC COMPANY ) Docket No. 50-323
)
9 Diablo Canyon Nuclear Power Plant ) (Reopened Hearing --
Units Nos. 1 and 2 ) Design Quality 10 ) Assurance) 11 12 13 PACIFIC GAS AND ELECTRIC COMPANY'S RESPONSE TO 14 GOVERNOR DEUKMEJIAN'S AND JOINT INTERVENORS' ADDITIONAL CONTENTIONS 15 ON QUALITY ASSURANCE 16 17 18 On September 29, 1983 Governor Deukmejian and 19 Joint Intervenors filed Additional Contentions on Design 20 Quality Assurance with this Board. The first group of 21 sub-contentions (3(o) to 3(t)) deal with seismic design 22 quality assurance matters. In addition, they have added a 23 utterly new contention concerning a totally unrelated matter 24 which was last documented in SSER No. 16, NUREG-0675, issued 25 on August 26, 1983 dealing with the component cooling water 26 system at Diablo Canyon.
8310110073 931004 PDR ADOCK 05000275 G pon 1 sol
f-- .
i 1 As to the group of contentions pertaining to 2 seismic design quality assurance matters [3(o) to 3(t], they 3 suffer from the same lack of specificity required for 4 contentions as we expressed in our Response of September 22, 5 1983 to the revised contentions which had been submitted by 6 the Governor and Joint Intervenors on Septe'mber 8, 1983 1
7 pursuant to this Board's Order of August 26, 1983. As we
~8 stated then (Response p. 2), the Board required the 9 Intervenors to " particularize the critical facts upon which -
10 they base their claim." August 26 Order at p. 2. In each 11 instance, the contentions 3(o) to 3(t) fail to meet this 12 criterion in that they have failed to specify any, let alone
- 13 the critical, facts of how the particular item fails to meet f
14 licensing criteria.
. 15 As respects proposed contention No. 9 dealing with 16 the component cooling water system, the Governor and Joint i 17 Intervenors have once again flagrantly disregarded the 18 Commission's regulations for late filed contentions as well 4
19 as the Board's Orders of April 21 and August 26, 1983.
20 In the first place, the proposed contention, which 21 involves matters not heretofore made an issue in this 22 proceeding, must be considered a late filed contention.
23 However, the Governor and Joint Intervenors have not made 24 any attempt to satisfy the requirements of 10 C.F.R.
- 25 2.714(a)(1) for late filed contentions and for this reason 26 it must be excluded. See Pacific Gas and Electric Company I, _ . _ . _ , _ _ , . - -
1 (Diablo Canyon Nuclear Power Plant, Units 1 and 2),
2 CLI-82-39, 16 NRC (December 23, 1982 slip op, at 4).
3 Secondly, even assuming arguendo that the proposed 4 contention was deemed to involve issues made a part of the 5 verification program, the filing does not comply with the 6 terms of the Board's Order of August 26, 1983 which required 7 contentions to be . particularized by September 12, 1983 8 except for " issues depending on matters contained in yet 9 unfiled ITR's [which] must be in the hands of the other
.10 parties by September 30. " Order p. 7. Since itidoes not 11 meet these requirements it cannot be admitted.
12 ///
13 ///
14 ///
15 16 17 18 19 20 21 22 23 i
24 25 26 4
1 For the foregoing reasons the additional 2 contentions proposed by the Governor and the Joint 3 Intervenors in their September 29, 1983 filing should be 4 disallowed.
5 6 Respectfully submitted, 7 ROBERT OHLBACH PHILIP A. CRANE, JR.
8 RICHARD F. LOCKE Pacific Gas and Electric Company 9 P.O. Box 7442 San Francisco, California 94120 10 (415) 781-4211 11 ARTHUR C. GEHR Snell & Wilmer 12 3100 Valley Center Phoenix, Arizona 85073 13 (602) 257-7288 14 BRUCE NORTON .
Norton, Burke, Berry & French, P.C.
15 P.O. Box 10569 Phoenix, Arizona 85064 16 (602) 955-2446 17 Attorneys for Pacific Gas and Electric Company 18 A
20 By ld /
Richard F. Locke 21
~
22 DATED: October 4, 1983.
23 24 25 26 O
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 00U.ETEi.
U%c In the Matter of )
)
) Docket No. 50-2733 E;T -6 P2::14 PACIFIC GAS AND ELECTRIC COMPANY
) Docket No. 50-323 Diablo Canyon Nuclear Power Plant, ) C'RCE r F EJ3t'U-Units 1 and 2 ) 00CKETm3 a SEFVIU BRANCH
)
CERTIFICATE OF SERVICE The foregoing document (s) of Pacific Gas and Electric Company has (have) been served today on the following by deposit in the United States mail, properly stamped and addressed:
Judge John F. Wolf Mrs. Sandra A. Silver Chairman 1760 Alisal Street Atomic Safety and Licensing Board San Luis Obispo CA 93401 US Nuclear Regulatory Commission Washington DC 20555 Mr. Gordon Silver 1760 Alisal Street Judge Glenn O. Bright San Luis Obispo CA 93401 Atomic Safety and Licensing Board US Nuclear Regulatory Commission wJohn Phillips, Esq.
Washington DC 20555 Joel Reynolds, Esq.
Center for Law in the Public Interest Judge Jerry R. Kline 10951 W. Pico Blvd. - Suite 300 Atomic Safety and Licensing Board Los Angeles CA 90064 US Nuclear Regulatory Commission Washington DC 20555 David F. Fleischaker, Esq.
P. O. Box 1178 Mrs. Elizabeth Apfelberg Oklahoma City OK 73101 c/o Betsy Umhoffer 1493 Southwood Arthur C. Gehr, Esq.
San Luis Obispo CA 93401 Snell & Wilmer 3100 Valley Bank Center Janice E. Kerr, Esq. Phoenix AZ 85073 Public Utilities Commission Bruce Norton, Esq.
State of California 5246 State Building Norton, Burke, Berry & French, P.C.
350 McAllister Street P. O. Box 10569 San Francisco CA 94102 Phoenix AZ 85064 Mrs. Raye Fleming Chairman 1920 Mattie Road Atomic Safety and Licensing Shell Beach CA 93449 Board Panel US Nuclear Regulatory Commission Mr. Frederick Eissler Washington DC 20555 -
- Scenic Shoreline Preservation .
Conference, Inc.
4623 More Mesa Drive Santa Barbara CA -93105 F ,,
Chairman
- Judge Thomas S. Moore Atomic Safety and Licensing Chairman Appeal Panel Atomic Safety and Licensing US Nuclear Regulatory Commission Appaal Board Washington DC 20555 US Nuclear Regulatory Commission Washington DC 20555 ooSecretary US Nuclear Regulatory Commission
- Judge W. Reed Johnson Washington DC 20555 Atomic Safety and Licensing Appeal Board Attn: Docketing and Service US Nuclear Regtlatory Commission Section Washington DC 20555 oLawrence J. Chandler, Esq.
- Judge John H. Buck Henry J. McGurren Atomic Safety and Licensing US Nuclear Regulatory Commission Appeal Board Office of Executive Legal Director US Nuclear Regulatory Comiission Washington DC 20555 Washington DC 20555 Mr. Richard B. Hubbard
- Michael J. Strunwasser, Esq.
t1HB Technical Associates Susan L. Durbin, Esq.
1723 Hamilton Avenue Suite K Peter H. Kaufman, Esq.
San Jose CA 95125 3580 Wilshire Blvd. Suite 800 Los Angeles CA 90010 Mr. Carl Neiberger Telegram Tribune
P. O. Box 112 Lowenstein, Newman, Reis, and San Luis Obispo CA 93402 Axelrad, P.C.
1025 Connecticut Ave NW Washington DC 20036 Date: October 5, 1983 ,
b -
DM. WBBOCK
- Sent via courier on October 4, 1983.
cosent via express mail on October 5, 1983.