ML20078D784
| ML20078D784 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/28/1983 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | Harold Denton, John Miller Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20078D789 | List: |
| References | |
| NUDOCS 8310040623 | |
| Download: ML20078D784 (1) | |
Text
_ _ _ _ _ _ _ _ - - - - _
l Insconsin Electnc eomcome 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI S3201 September 28, 1983 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Attention:
Mr. J.
R. Miller, Chief Operating Reactors Branch 3 Gentlemen:
DOCKET 50-266 HEALTH PHYSICS ORGANIZATION STEAM GENERATOR REPLACEMENT POINT BEACH NUCLEAR PLANT, UNIT 1 In response to the request of Mr. Tim Colburn of your staff, the attached revision to the Health Physics Organization for the steam generator replacement project is provided.
This revision supersedes that which was submitted with our September 9, 1983 letter.
Very truly yours, lf'
,./
Vice Presid'nt-Nuclear Power e
C. W. Fay Attachment Copy to NRC Resident Inspector Aool ifi 8310040623 830928 PDR ADOCK 05000266 H
PDR i