Supplemental Response to Second Set of Interrogatories. Certification of Counsel & Certificate of Svc Encl.Related Correspondence
ML20078D509
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/29/1983
From: Havian E
CENTER FOR LAW IN THE PUBLIC INTEREST, JOINT INTERVENORS - DIABLO CANYON
To:
PACIFIC GAS & ELECTRIC CO.
References
ISSUANCES-OL, NUDOCS 8310040539
Download: ML20078D509 (7)


Text

- -" ..

4- _

8

~f

~

' Ew'~hT:D CO35E20::DDCE n.

UNITED STATES OF AMERICA 00CKETED USl4RC NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APP 10 D 0FFICE OF SECRETAli?

-) 00CKEilHG & SERVICE In the Matter of ) BRAl:CH

)

PACIFIC GAS AND ELECTRIC COMPANY Docket Nos.

) 50-275 0.L.

) 50-323 0.L.

(Diablo Canyon Nuclear Power )

Plant,. Units 1 and 2) ) (Reopened Hearing --

) Design Quality

) Assurance)

JOINT INTERVENORS' SUPPLEMENTAL RESPONSE TO PACIFIC GAS AND ELECTRIC COMPANY'S SECOND SET OF INTERROGATORIES Joint Intervenors submit the following supplemental response to Pacific Gas and Electric Company's ("PGandE") <

Second Set of Interrogatories.

RESPONSE TO INTERROGATORY NO. 1:

Joint Intervenors' review of the FSAR, IDVP Final Report, PGandE Phase I and II Final Reports, ITRs, SER 2 l-Supplement 18, the PGandE/Bechtel Diablo Canyon Project QA Manual and the PGandE 2ngineering Department Procedures Manual, although not complete, has disclosed the following i deficiencies indicating the failure to develop an adequate 5 .5

( 5 Quality Assurance ("QA") Program:

(a) FSAR S 17.0 limits PGandE compliance with j

Appendix B to "the extent possible.". ii5 l

(b) ASLAB Construction QA Hearing Transcript at _

5..

pp. 465-66 indicates PGandE compliance with Appendix B "as l=:- .

practicable." Ef?

~

kk" 0310040539 830929 PDR ADOCK 05000275 O PDR 3N E:L

~""]

, m v ..

(c) PGandE QA Manual excludes Unit 1 from its scope.

(d) SER Supplement 18 indicates that Brookhaven National Laboratory ("BNL") discovered discrepancies in rennalysis and ve,rification of vertical response of the annulus.

4 (e) SER Supplement 18 indicates that BNL discovered discrepancies in verification of piping by Westinghouse and buried diesel tanks by Harding and- Lawson.

(f) ITR 4 reveals numerous deficiencies in the Internal Technical Program's ("ITP") QA program and implemen-

., tation.

(g) PGandE's Engineering Department Procedures are deficient in that the Q-List .does not unambiguously provide

, responsibility for classification of structures, systems and components ("SS&Cs"), revisions'to references are not provided, and regular 0-List distribution is not specified.

(h) Error Open Items ("EOI") 1123-1126, 1128, 1129, and 1131-1142 reveal numerous OA inadequacies.

The above list is only partially complete since the Joint Intervenors' review of all relevant documents is not yet complete.

RESPONSE TO INTERROGATORY NO. 2:

Joint Intervenors' review of the IDVP Final Report, the PGandE Phase I and II Final' Reports, ITRs, SER Supplement

! 18, the Bechtel Project Engineer's Instruction Manual for the Diablo Canyon Project, Bechtel Topical Report BQ-TOP-1, Rev.

1 A

, - , - - --w-ow,-e,- ,,,,e-, a--. . -m------,-m-m--w,,,--y,--w,- - ~ - - - ~ ---s---- m--n- --- ---w- - , - - =p-=---me-ww --e mw- w= --ene~-- -v-r--w-~--~--

4 3A as modified by PGandE's letter dated June 18, 1982, and the Bechtel Quality Assurance Department Procedures Manual, although not yet complete, has disclosed the following deficiencies in the QA programs of PGandE's major subcen-tractors: .

(a) Regarding Bechtel Instruction No. 5, the internal design interfaces and responsibilities were not provided until the revision dated March 11, 1983.

(b) See responses 1(d) and 1(e) supra.

RESPONSE TO INTERROGATORY NO. 3:

The information requested by this interrogatory is

. more readily available to PGa'ndE than to the Joint Intervenors.

Furthermore, the Appeal Board has ruled that Joint Intervenors' contention *regarding non-safety grade SS&Cs important to

, safety is outside the scope, of the reopened proceeding; thus, interrogatories directed to that issue are irrelevant.

RESPONSE TO INTERROGATORY NOS.'16-27:

Because of the fact that many of the criteria of Appendix B are interrelated, it-is not possible to specify with precision the criterion violated by each and every deficiency. See Response to Interrogatory No. 2.

RESPONSE TO INTERROGATORY NOS. 28--46:

See Response to Interrogatory No. 1.

RESPONSE TO INTERROGATORY NOS. 47-49:

See Response to Interrogatory No. 2 RESPONSE TO INTEPROGATORY NOS. 50-55:

See Response to Interrogatory No. 1.

RESPONSE TO INTERROGATORY NOS. 56-61:

See Response to Interrogatory No. 2.

RESPONSE TO INTERROGATORY NOS. 65-67:

See Response to Interrogatory No. 2 RESPONSE TO INTERROGATORY NOS. 68-70:

See Responses to Interrogatory Nos. 1 and 2.

DATED: September 29, 1983 Respectfully submitted, JOEL R. REYNOLDS, ESO.

JOHN R. PHILLIPS, ESO.

ERIC R. HAVIAN, ESO.

Center for Law in the Public Interest 10951 W. Pico Boulevard

. Los Angeles, CA 90064 (213) 470-3000 DAVID S. FLEISCHAKER, ESO.

P.O. Box 1178 Oklahoma City, OK 73101 By 4 - e ERIC R. HAVIAN Attorneys for Joint Intervenors SAN LUIS OBISPO MOTHERS FOR PEACE

-SCENIC SHORELINE PRESERVATION CONFERENCE, INC.

ECOLOGY ACTION CLUB

  • SANDRA SILVER ELIZABETH APFELBERG JOHN J. FORSTER D

e

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD

)

In the Matter of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-275 O.L.

) 50-323 0.L.

(Diablo Canyon Nuclear Power )

Plant, Units 1 and 2) )

)

CERTIFICATION

., I, Eric R. Havian, hereby certify:

1.

I am one of the attorneys for the Joint Intervenors in the above-entitled proceeding and, as such, am authorized to execute this certification.

2. I have read the foregoing Joint Intervenors' Response to Pacific Gas and Electric Company's Second Set of i

Interrogatories and know the contents thereof.

3. I am informed and believe said answers to be true t

and correct.

  • l I certify under penalty of perjury that the foregoing

~is true and correct.

l Executed at San Francisco, California, on September 29, 1983.

l p . m _

ERIC R. HAVIAN l

F l

6 .,.

UNITED STATES OF AMERICA

~

NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD

)

In the Matter'of )

)

PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-275 O.L.

) 50-323 0.L.

(Diablo Canyon Nuclear Power )

Plant, Units 1 and 2)- )

)

)

CERTIFICATE OF SERVICE I hereby certify that on this 29th day of September, 1983, I have served copies of the foregoing JOINT INTERVENORS' SUPPLEMENTAL RESPONSE TO PACIFIC GAS'AND ELECTRIC COMPANY'S SECOND SET OF INTERROGATORIES, mailing them through the U.S.

mails, first class, postage prepaid.

. Mr. Fredrick Eissler Docket and Service Branch Scenic Shoreline Preservation Office of the Secretary Conference, Inc. U.S. Nuclear Regulatory Commission 4623 More Mesa Drive Washington, D.C. 20555 Santa Barbara, CA 93105 -

Lawrence Chandler,-Esq. Janice E. Kerr, Esq'. -

Office of the Executive Legal Lawrence Q. Garcia, Esq.

Director - BETH 042 J. Calvin Simpson, Esq.

U.S. Nuclear Regulatory California Public Utilities Commission Commission Washington, D.C. 20555 5246 McAllister Street San Francisco, CA 94102 John. Van de Kamp, Attorney General .

Andrea Sheridan Ordin, Chief Attorney General Michael J. Strumwasser, Special Counsel to .

the Attorney' General State of California 3580 Wilshire Boulevard, Suite 800 Los Angeles, CA 90010

...._m

David S. Fleischaker, Esq. Richard Hubbard P.O. Box 1178 MHB Technical Associates Oklahoma City, OK 73101 1723 Hamilton Avenue, Suite K San Jose, CA 95725

. Maurice Axelrad, Esq. Arthur C. Gehr, Esq.

Lowenstein, Newman, Reis Snell & Wilmer

& Axelrad, P.C. 3100 Valley Center 1025. Connecticut Avenue, N.W. Phoenix, AZ 85073 Washington, D.C. 20036 Virginia and Gordon Bruno Sandra and Gordon Silver Pecho Ranch 1760 Alisal Street P.O. Jox 6289 San Luis Obispo, CA 03401 Los Osos, CA 93402 Nancy Culver Carl Neiburger 192 Luneta Telgram Tribune San Luis Obispo, CA 93402 P.O. Box 112 San Luis Obispo, CA 93402 Betsy Umhoffer 1493 Southwood San Luis Obispo, CA 93401 r

) KRISTEN f. HOMAR i

l l -

l

.