e 7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
The Toledo Edison Company, Centerior )
Docket No. 50-346 Service Company, and the Cleveland
)
Electric Illuminating Company
)
EXEMPTION I.
The Toledo Edison Company, Centerior Service Company, and the Cleveland Electric Illuminating Company (the licensees) hold Facility Operating License No. NPF-3, which authorizes operation of the Davis-Besse Nuclear Power Station, Unit No. I.
The license provides, among other things, that the facility is subject to all rules, regulations, and Orders of the Nuclear Regulatory Commission (the Commission) now or hereafter in effect.
The facility is a pressurized water reactor located at the licensee's site in Ottawa County, Ohio.
II.
Section III.D.2(b)(ii) of 10 CFR Part 50, Appendix J requires that a full pressure air lock leakage test be performed whenever air locks are opened during periods when containment integrity is not required.
III.
By letter dated October 21, 1994, the licensee requested an Exemption from the requirement of 10 CFR 50, Appendix J, Section III.D.2(b)(ii) identified in Section II above.
If an air lock is opened during Modes 5 and 6,Section III.D.2(b)(ii) of Appendix J requires that an overall air lock leakage test at not-less-than the calculated peak containment pressure from a design-basis loss of coolant accident (Pa) be conducted before plant heatup l
and startup (i.e., before entering Mode 4).
Instead, if no maintenance has been performed on the air locks that affects air lock sealing capabilities, h $00@$
b 6
P
'4 i.
the licensee would conduct as air lock seal leakage test (Section i
III.D.2(b)(iii) of 10 CFR 50, Appendix J), for the full pressure air lock test required by Section III.D.2(b)(ii).
If the periodic six-month test of Section III.D.2(b)(1) of Appendix J and the test required by Section III.D.2(b)(iii) of Appendix J are current, and no maintenance has been performed on the air lock.that affects air lock sealing capabilities, there should be no reason to expect the air lock to leak excessively, just because it has been opened in Mode 5 or Mode 6.
If maintenance has been performed, which could affect air lock sealing capability, then a full-pressure air lock test will be performed following such maintenance.
i The licensee's letter dated October 21, 1994, submitted information to identify the special circumstances for granting this exemption to Davis-Besse, pursuant to 10 CFR 50.12.
The purpose of Appendix J to 10 CFR 50, is to assure that containment leak-tight integrity can be verified periodically, throughout service lifetime to maintain containment leakage, within the limits specified in the facility Technical Specifications.
The proposed alternative test method, along with the six-month test requirement of Section III.D.2(b)(1) of Appendix J, and the testing requirements when maintenance is performed on the air lock that affects sealing capability, is sufficient to achieve this underlying purpose, in that it provides adequate assurance of continued leak-tight integrity of the air lock.
Based on the above discussion, the licensee's proposed substitution of an air lock seal leakage test described in III.D.2(b)(iii) for a full-pressure test, as discussed above, is acceptable.
- e-4 IV.
Accordingly, the Commission has determined that,' pursuant to 10 CFR 50.12, this exemption is authorized by law, and will not present an undue risk to the public health and safety, and is consistent with the common defense and security. The Commission further determines that special circumstances described by 10 CFR 50.12(a)(2)(ii) exist, in that application of the regulation in the particular circumstances is not necessary to achieve the underlying purpose' of the rule, since the licensees have proposed an r
acceptable alternative method that accomplishes the intent of the regulation.
Accordingly, the Commission hereby grants the Exemption as described in Section III above from the requirements of 10 CFR 50, Appendix J,.Section III.D.2(b)(ii).
Pursuant to 10 CFR 51.32, the Commission has determined that the granting of this Exemption will have no significant impact on the quality of the human environment (59 FR 54222).
This Exemption is effective upon issuance.
FOR THE NUCLEAR REGULATORY COMMISSION M
M Elinor G. Adensam, Acting Director Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Dated a Rockville, Maryland this i day of November 1994