Informs of Reduction in Cutoff Level for Initial Screening Tests Associated w/fitness-for-duty Testing
ML20078C603
Person / Time
Site: Peach Bottom, Limerick  
Issue date: 10/24/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9411010116
Download: ML20078C603 (1)


Text

ftstion Suppsrt D:ptrim:nt A

10CFR26, Appendix A,1.1.(2)

~

~M=y EN RGY eccoe"e,9<ce-n v Nuclear Group Headquarters 965 Chesterbrook Boulevard Wayne, PA 19087-5691 October 24,1994 Docket Nos. 50-277 50-278 50-352 50-353 Ucense Nos. DPR44 DPR-56 NPF-39 NPF-85 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 Umerick Generating Station, Units 1 and 2 Reduction in Cutoff Level for Initial Screening Tests Associated with Fitness-for-Duty Testing Gentlemen:

This letter is being submitted in accordance with the requirements of 10CFR26, Appendix A, 1.1.(2), to inform the NRC that PECO Energy Company has lowered the initial testing cutoff level for marijuana metabolites from 100 ng/ml to 50 ng/mi.10CFR26, Appendix A,1.1,(2) stipulates that the NRC must be notified within 60 days when a licensee establishes more stringent cutoff levels for testing of substances under the Fitness-for-Duty Program. PECO Energy has the capability to conduct testing using a lower threshold level, and as of September 1,1994, we established a cutoff level of 50 ng/ml for initial testing for marijuana at our onsite drug testing facilities supporting Peach Bottom Atomic Power Station and Limerick Generating Station. This reduction in cutoff level is consistent with changes made by the U.S. Department of Health and Human Services (HHS) to the guidelines governing dnJg testing in the Federal work place. The changes to the HHS guidelines are discussed in the NRC's Administrative Letter 94-09,

" Changes to the Mandatory Guidelines for Federal Work Place Drug Testing Program."

If you have any questions or require additional information, please do not hesitate to contact us.

l l

Very truly yours,

.a p.

l G. A. Hunger, Jr.

Director - Ucensing cc:

T. T. Martin, Administrator, Region I, USN3C yif N. S. Perry, USNRC Senior Resident inspector, LGS W. L Schmidt, USNRC Senior Resident inspector, PBAPS g6

\\9 l

9411010116 941024 PDR ADOCK 05000277 PDR

!