ML20078C453
| ML20078C453 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/21/1994 |
| From: | Cerovac F WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| AL-94-12, PBL-94-0330, PBL-94-330, NUDOCS 9410310256 | |
| Download: ML20078C453 (2) | |
Text
-,
O Wisconsin Electnc POWER COMPANY Point Baoch Nuclear Plant 6610 Nuclear Rd., Two Rivers, WI 54241 (414) 755 2321 r
PBL 94-0330 7
October 21, 1994 Document Control Desk U.S. Nuclear Regulatory Commission i
Washington, D.C.
20555 RESPONSE TO ADMINISTRATIVE LE'I"rER 94-12 The attached NRC Form 536 has been prepared in response to the request in the administrative letter 94-12.
It provides our best estimate of the number and type of NRC Operator licenses we plan to have examined during the September PBNP assigned dates from 1995 through 1998.
It also states our intention of having seven individuals take the April 1995 Generic Fundamentals Exam.
At this time we do not intend to request initial licensing examinations for the March PBNP assigned times from 1995 through 1998.
Please feel free to contact myself for additional information.
Sincerely,
<rno F. Cerovac j
Operations Training Coordinator dmd Enclosure l
cc:
Jeff Hansen, U.S. Nuclear Regulatory Commission-c
!y A
0 0 9410310256 941021 sj PDR ADOCK 05000266 V
PDR Asubskfa7ofHisawsinEmm Coryvation
v ATTACHMENT 2 NRC FORM 534 U.S. NUCLEAR REGULATORY COMMIS&lON (s-e4)
APPROVED BY OMS: NO.31504131 EXPtRES: 8131/97 tsumftp sus 0m put afspasst to CopLT wms TMs sponteafles COL!!CTIst Ataut T: 1,Wut.
TIAf WL186TMT SfonasAftm OPERATOR UCENSING Cal 3CTim 5 U. AID TO.8Um SpaNM ase.AtacuRCES fGR nm.a
.R.
C
,n nu anun a 1
EXAMINATION DATA T*==mana maacam **'
==Ca (TmL **
RUC3M RERATON COWWWEL Wa"DW5% BC 3E TO DE PAP 9WOBE BEDUCTuul PR6ACT B1541314 OpRCE 5 anamaammy Aseg guestT.WAmmeTWE.DC 20EAL FACluTY NRC REGION POINT BEACH NUCLEAR PLANT (UNITS 1 AND 2)
REGION III A. PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FY 121 FY 19 96 FY 19 97 FY 19 98 (1o/o1/19. o0/30/ 95:
nofotil. oefsor96 gioiosi 6.cefacy 97 i giomtf97. oefsof 98 AssCNED DA'6E END OF SEPTEMBE 1 SEPTEMBER SEPTEMBER SEPTEMBER PER oENERc LaTTER OL.es-os NUMBER OF RE ACTOR CPERATOR8 0
6 2
4 NUMaER OP sENCR Rf ACTCR cPERAvoRs - msTA NT 1
1 0
0 NuuaER or sENem REACTOR OPERATORS - WPORAct 1
3 1
2 NUWSER OF SENCR REACTOR CPERATORS - LIMITED A$6CNED DATE PER GENERIC LETTER OL 88-03 NUMBER OF REACTOR OPERAT' ORS NUMOER 08 SENIOR REACTOR OMRATORS - DsSTANT NUMBER OF SENIOR REACTOR OPERATORS - WPORADE i
NUh4ER OF SENLOR REACTOR CPERATORS - LIMrTED
- 8. PROPOSED GENERIC FUNDAMENTAL EXAMINATION SCHEDULE FY 1995 APRIL 1995 ocTostnIS _
EST1 MATED NUMBER OF CANDIDATES 7
W w su 66-**)
...rm..,,.,-....
---