ML20078B690

From kanterella
Jump to navigation Jump to search
Responds to 830810 Request for Addl Info Re QA Program Description Per 10CFR50.55(f).Revised QA Program Description Will Be Submitted by 840131
ML20078B690
Person / Time
Site: Beaver Valley
Issue date: 09/16/1983
From: Woolever E
DUQUESNE LIGHT CO.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
2NRC-3-074, 2NRC-3-74, NUDOCS 8309270203
Download: ML20078B690 (2)


Text

ED div e

9

  • 2NRC-3-074 (412)787 - 5141 (412)923 -1960 Telecopy (412) 787-2629 September 16, 1983 Nuclear Construction Division Robinson Plaza, Building 2, Suite 210 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, PA 19406 ATTENTION:

Mr. Richard W. Starostecki Division of Project and Resident Programs

SUBJECT:

10CFR50.55(f) SAR QA Program Gentlemen:

This le t ter is in response to your le t te r to Mr. E. J. Woo leve r,

dated August 10, 1983, reques t ing ad di t ional info rmat ion conce rning the submit tal of BVPS-2 's Quality Assurance Program description in accordance with 10CFR50.55(f) (Reference 3).

RESPONSE

Listed below is the BVPS-2 response to the four items of concern expressed in your letter of Aur,ust 10,1983 (Reference 2).

Item No. 1.

The int ent of ocr submittal dated June 10, 19 83, was to pr o-vide a currenti de sc rip t ion of the QA Program pr eviou sly approved with the BVPS-2 PS AR.

This was provided by submittal of a list of all changes made since the description was last approved, each of which. was cros s-referenced with the pr ev i-corres ponding number ously approved description by placing a

in the margin of the ap pr oved desc rip t ion.

Alt hough the QA Program description was not revised in the PSAR to incorpo ra te the ch ange s, the submittal did provide a ma rked-u p cur rent description which specifically identified each change.

Ad di-l t ional ly, e controlled copy of the DLC QA Program (which is always provided with the lates t revision) is at Region I and was pr ovided prio r to 10CFR50.5 5(f) req uir ement s.

In our discussions with Mr.

P.

Bis set t atti Mr.

P.

K.

Espe n, they indica t ed shat our submi t t al should have incorpo ra t ed the ch anges into the QA Program desc ript ion t ext.

It is our a revised de sc ript ion wil l belief that simply providing obscure the ch anges in the revised text.

Howeve r, per your r eq ue s t, BVPS-2 will provide a current QA Program description, incorporating the changes and submit it by January 31, 1984.

2.

DLC will follow the guidance of ANSI N45.2.10-1973.

gA-[55 8309270203 030916 p

PDR ADOCK 05000412 A

PDR

r-J United Stctes Nuclear Regulstory Commission 4

' Mr. Richard W. Staros tecki page 2 3.

The assignment of quality funct ions can be found in the Des ign and Construction Quality Assurance Program.

4.

Qualifications and expc rience requi r ement s for QA pe rso nnel can be found in the Duquesne Light Company Quality Assurance Depa rtment Job Descriptions Text and for QC personnel can be found in. the Duquesne Light Company Site Quality Cont rol Training Manual.

DUQUESNE LIGHT COMPANY By n'

Ek J. Woolever Vice President JS/wjs cc:

Mr. G. Walton, NRC Resident Inspector Ms. L. Lazo, Project Manager NRC Document Control Desk i

l