ML20078A630

From kanterella
Jump to navigation Jump to search
Comments on Insp of tie-down Features of Pressurized Encl Ventilation Sys to Confirm Statement in Re Docket 50-315.Insp Confirmed Adequate tie-downs Installed
ML20078A630
Person / Time
Site: Cook 
Issue date: 09/14/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8309230349
Download: ML20078A630 (1)


Text

I Jhd 1

('\\

O M

G,,,,,

INDIANA & MICHIGAN ELECTRIC C_0MPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 September 14, 1983 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316

Dear Mr. Keppler:

On September 1, 1983, notification was made to Mr. E.R. Swanson at 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br /> that we were removing Unit 2 from service to perform an inspection of the tie-down features of the Pressurizer Enclosure Ventilation System to confirm the statement made in our August 31, 1983, letter (Docket No. 50-315).

This inspection confirmed that adequate tie-downs were installed and the Unit was immediately returned to service.

Sincerely, W.G.

S ith,

/bab cc:

John E. Dolan M.P. Alexich R.F. Kroeger H.

Brugger E.

Swanson/N. DuBry, RO:III R.C. Callen, MPSC G. Charnoff, Esq.

J.M. Hennigan R.0, Bruggee INPO PNSRC J.F.

Stietzel E.L. Townley Dir., IE (40 copies)

SEP 9 883 Dir., MIPC (4 copies) 2 8309230349 830914 PDR ADOCK 05000316

[g G

PDR NO