GENERAL OFFICE Nebraska Public Power District
"- " "MERMeS'#2^&^"""
LQA8300224 September 16, 1983 Director of Nuclear Reactor Regulation Attention:
Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing U.S.' Nuclear Regulatory Commission Washington, DC 20555
Reference:
- 1) Letter from J. D. Weaver to B. Siegel dated August 8, 1983, LQA8300185,
" Demonstration of Containment Purge and Vend Valve Operability (B-24)"
- 2) Letter from J. M. Pilant to T. A. Ippolito dated December 18, 1979, " Containment Purge and Vent Valve Operability"
Dear Mr. Vassallo:
Subject:
Operability of Purge Valves (B-24) Response Cooper Nuclear Station NRC Docket No. 50-298, DPR-46 As discussed in Reference 1, the District has received eight pages of questions relating to the operability of containment purge and vent valves at CNS. The response to these questions was discussed with the staff, and this letter is written to confirm the District's expected response date.
Based upon a preliminary review of the questions by NPPD and Allis-Chalmers, analytical efforts have commenced which should produce results within approximately 90 days (by December 15, 1983).
At that time the Diatrict will respond to the NRC's questions and provide an expedited schedule for any necessary valve modifications.
Although the preliminary review indicates that analysis alone will determine the necessary modifications, there is a possibility that testing of the valve configurations will.be required.
It is anticipated that the testing program would also take approximately 90 days.
Even if testing is required, it is anticipated that the necessary modifications vould still be completed at CNS during the next refueling outage (anticipated October 1984). As stated in Reference 2, the District will continue to operate purge valves at CNS in the passive mode as much as possible and go34 8309230251 830916 PDR ADOCK 05000298
(#
P PDR
e.
Mr. Domenic :B. Vassallo September 16, 1983
~Page 2 to limit all purging and venting times to as low as achievable considering the necessary operation of the station.
Sincerely, A
. Pilant Technical Staff Manager Nuclear Power Group JMP:JDW:cmk