Page 3 to 830912 Response to Suffolk County Motion to Compel
ML20078A369
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 09/19/1983
From:
HUNTON & WILLIAMS, LONG ISLAND LIGHTING CO.
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20078A366 List:
References
NUDOCS 8309230196
Download: ML20078A369 (1)


Text

r

  • normally placed upon discovery requests y

for access to a party's premises.

Such Yi I.

discovery, if granted, would interfere with the efforts underway to determine i

the cause of the crankshaft failure and to repair the diesel generators.

The County's failure to address the pertinent legal standards confirms the inappropriateness of its discovery re-quests.

Despite this, LILCO agrees that some discovery should occur during the investigation of the diesel generator crank-shaft failure.

The unexpected failure of the crankshaft at a time when the Shoreham plant was essentially ready to load fuel will make it necessary to complete expeditiously any litigation on the diesel generators once the cause of the crankshaft fail-ure and appropriate corrective action have been identified.

The discovery proposed here by LILCO ensures that en expedi-tious schedule can be set without jeopardizing the rights of any of the parties.

LILCO's principal concern is that discov-ery should be appropriately limited so as not to impose an un-necessary burden on LILCO during the investigation of the cause or causes of the crankshaft failure or otherwise interfere with the-investigation.

Consequently, LILCO proposes that the Board limit discovery in each of the three categories requested by l

Suffolk County as set out below:

Category 1:

Documents L

'a.

Diesel Generator Master Plan (which has already been provided) and revisions to the plan, if any.

l l

gjg9230196030919 ADOCK 05000322 g

PDR