Text

- _ _ _

LOUISIANA ,4a onAnoNoe srnEer POWER & LIGHT P O. BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 . (5041 366-2345 EuYNs5sYEr7 September 2, 1983 W3183-0294 Q-3-A35.07.56 R ]@$0Nbl Mr. John T. Collins ,"-b '

Regional Administrator, Region IV .

U. S. Nuclear Regulatory Commission I L 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 56 "RCB Liner Plate Nuclear Coatings Failures" Fifth Interim Report

REFERENCE:

LP&L Letter W3183-0223 dated June 29, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC by September 15, 1983.

At the present time, the completion of corrective action including the final inspection is scheduled for October 28, 1983.

A Final Report will therefore be submitted to the USNRC by November 18, 1983.

Very truly ours.

W rH F. J. Drummond Manager, Engineering & Technical Services

3) Mr. E. L. Blake cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear. Regulatory Commission Washington, D.C. 20555 Director 4) Mr. W. M. Stevenson 2)

Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 E;309230145 830902 *

{DRADOCK 05000382 -

PDR L t -17

- - - - - - - - - - - _ -_ -