Second Interim Rept Re Significant Const Deficiency 84 Concerning Tube Track Welding Defects.Completion of Corrective Action Scheduled for 831115.Final Rept Will Be Submitted by 831129
ML20078A291
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/02/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
84, W3I83-0297, W3I83-297, NUDOCS 8309230117
Download: ML20078A291 (1)


Text

- _ _ _ _ _ _

l_OUISIANA / 142 ORARONDE STREU POWER & LIG HT/ P O BOX 6008

  • NEW ORLEANS. LOUISIANA 70174 . (504) 366 2345

$uSN5vsNU September 2, 1983 W3183-0297 Q-3-A35.07.84 Mr. John T. Collins Regional Administrator, Region IV Nl q U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000

-g(pg if f 76012 C Arlington, Texas

SUBJECT:

Waterford SES Unit No. 3 N... ,

j Docket No. 50-382 Significant Construction Deficiency No. 84 -

" Tube Track Welding Deficiencies" Second Interim Report

REFERENCE:

LP&L Letter No. W3I83-0214, dated June 15, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of an update or Final Report to the USNRC no later than August 31, 1983.

At the present time, the date for corrective action completion for SCD No. 84 has been scheduled for November 15, 1983.

Therefore, a Final Report will be submitted by November 29, 1983 to the USNRC.

Very truly yours, 0 0 Y w~Y F. . Drummond Manager, Engineering & Technical Services cc: 1) Director 3) Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555

2) Director 4) Mr. W. M. Stevenson Of fice of Managenient Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8309230117 030902 DR ADOCK 0500039g Pon IE-n llI