ML20078A287

From kanterella
Jump to navigation Jump to search
Fifth Interim Deficiency Rept Re Significant Const Deficiency 32 Concerning Stress Analysis for Welded Pipe Support Attachments Not Performed Prior to Fabrication. Review of Documentation Incomplete.Final Rept by 831028
ML20078A287
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/02/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
32, W3I83-0296, W3I83-296, NUDOCS 8309230110
Download: ML20078A287 (1)


Text

--

LouisiamA P O W E R & L 1 G H T! P O BOX FOO8

,4, celAmoNoE s1 u1 NEW ORLEANS. LOUISIANA 70174 . (504) 366-2345 UlfuSNsysE September 2,1983 W3183-0296 AJ 7.32

{

s ,

Mr. John T. Collins { s DP3 i i i R;gional Administrator, Region IV  ! 'Y U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 -

~

Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 32

" Stress Analysis for Welded Pipe Support Attachments Was Not Performed Prior to Fabrication" Fifth Interim Repert

REFERENCE:

LP&L Letter No. W3I83-0219, dated June 23, 1983 D;tr Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC no later than August 31, 1983.

At the present time, the supporting documentation is under review and is expected to be completed by October 14, 1983.

A Final Report will be submitted by October 28, 1983.

V:ry trul ours, F. J. Drummond M: nager, Engineering & Technical Services cc: 1) Director 3) Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555

2) Director 4) Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8309230110 830902 aA PDR ADOCK 05000382 PDR S g_ {f

_ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .