Text
--
LouisiamA P O W E R & L 1 G H T! P O BOX FOO8 NEW ORLEANS. LOUISIANA 70174
,4, celAmoNoE s1 u1
. (504) 366-2345 UlfuSNsysE September 2,1983 W3183-0296 AJ 7.32
{
s
{
s DP3 i
Mr. John T. Collins i
i R;gional Administrator, Region IV
'Y U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000
~
Arlington, Texas 76012
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 32
" Stress Analysis for Welded Pipe Support Attachments Was Not Performed Prior to Fabrication" Fifth Interim Repert
REFERENCE:
LP&L Letter No. W3I83-0219, dated June 23, 1983 D;tr Mr. Collins:
The above referenced letter indicated submittal of a Final Report to the USNRC no later than August 31, 1983.
At the present time, the supporting documentation is under review and is expected to be completed by October 14, 1983.
A Final Report will be submitted by October 28, 1983.
V:ry trul
- ours, F. J. Drummond M: nager, Engineering & Technical Services cc:
1)
Director 3)
Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 2)
Director 4)
Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8309230110 830902 PDR ADOCK 05000382
{f aA PDR S
g_
- _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.