ML20078A283

From kanterella
Jump to navigation Jump to search
Third Interim Rept Re Significant Const Deficiency 78 Concerning American Bridge Structural Steel Defects. Corrective Actions & QA Review of Supporting Documentation Incomplete.Final Rept Will Be Submitted by 831028
ML20078A283
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/02/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
78, W3I83-0293, W3I83-293, NUDOCS 8309230099
Download: ML20078A283 (1)


Text

  1. "

,e LOUISIANA ua onAnonoe sincer POWER & LIGHT P O BOX 6008. NEW ORLEANS. LOUISIAflA 7M v4 * (504) 366-2345 Ur?u?$504l0 September 2, 1983

~

W3I83-0293 Q-3-A35.07.78

$ $ b N W,-

P Mr. John T. Collins i

Regional Administrator, Region IV 7 0 - Rj983 I

t U. S. Nuclear Regulatory Commission

'l 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 i

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 78 "American Bridge Structual Steel Deficiencies" Third Interim Report

REFERENCE:

LP&L Letter W3I83-0196 dated June 15, 1983

Dear Mr. Colline:

The above referenced letter indicated submittal of a Final Report to the USNRC by August 31, 1983.

At the present time, the corrective actio2 and the engineering and Quality

. > Assurance review of the supporting documentation is expect to be completed by October 7, 1983.

'A Final Report will therefore be su$.mitted to the USNRC by October 28, 1983 Very tru

yours, Mm F. J. Drummond Manager, Engineering & Technical Services cc:

1)

Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 2)

Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8309230099 830902 PDR ADOCK 05000382 l3 h 9

PDR pp J