Text

_ . . . . . . .

f. *a Research Reactor Center Resea'Ch Park Columbia. FAs ,oun 65211 II Te:eonone (314) 882-4211 FAX [314) 882=3443 UNIVERSITY OF MISSOURl-COLUMBIA December 21,1994 Director of Enforcement US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

REFERENCE:

Docket 50-186 University of Missouri Research Reactor License R 103

SUBJECT:

Reply to a Notice of Violation in Accordance with 10 CFR 2.201

Dear Sir:

This is a written statement required by 10 CFR 2.201 in response to the November 23, 1994 US NRC Region III Notice of Violation [NRC Inspection Report Nos. 50-186/93001(DRSS); 50186/94002 (DRSS); EA 93-058] concerning events at the University of Missouri Research Reactor (MURR).

Two violations were identified; only one requires a written response.

Violation Requiring a Licensee Response B.

On May 5,1994, the licensee delivered to a carrier for transport radioactive materials (a decommissioned irradiator case)in a package that was not designed and prepared for shipment so that under conditions normally incident to transportation the radiation level does not exceed 200 millirem per hour at any point on the external surface of the package. Specifically, the package arrived at its destination with a radiation level of approximately 600 to 800 milliren per hour on the bottom external surface.

Reply

1. Admission or Denial of the Alleged Violation This violation is admitted. MURR was in contact with NRC Region III by telephone on May 6,1994 concerning the problems with this shipment. Written reports were submitted to the US Department of Transportation on May 19,1994 and June 3,1994.

A written report was submitted also to the State of Tennessee, Division of Radiological Health on June 3,1994. Additionalinformation was supplied by the licensee during a September Lisle, Illinois. 29,1994 Enforcement Conference conducted at NRC Region III offices in Cf

"* !g

, h d.b :/k COLUMBIA KANSAS CITY POLLA ST. LOUIS 9501240342 950118 PDR G

ADOCK 05000186 **"***'a PDR

,s.

Ik

' ~

l i Director of Enforcsment, NRC December 21,1994 page 2 4

2. Reasons for the violcu Jadmitted

{

l The reason for the violation was the failure to have in place adequate waste packaging

procedures to ensure that contents of the waste container could not shift and result in
an increase in the dose rate on the bottom of the package. In addition, training for i

personnel responsible for the shipment of radioactive waste was inadequate.

i

The high dose rate on the bottom of the package was caused by three activated metal i parts that apparently had vibrated loose and migrated to the floor of the container i during transport. A more thorough survey of each of the waste items as it was loaded

+ into the container may have identified these discrete point sources. Additional blocking and bracing might have prevented the waste from shifting. Although the package was classified as a Type A shipment,it met all the criteria of an exclusive use, i Low Specific Activity shipment. No intermediate unloading or loading of the vehicle occurred during shipment, and the radiation levels at the package destination were j within the limits for an exclusive use shipment.

i a When formed in 1992 to evaluate isotope shipments from MURR, the Shipping Task j Force did not include the category oflow level radioactive waste in the scope ofits i review. A review of the MURR radioactive waste shipping program by the Shipping

, Task Force may have identified the weaknesses in procedures and training.

j 3. Corrective steps that have been taken and results achieved

?

2 MURR took immediate responsibility for investigating the cause of the change in dose i rate on the package, and took steps to correct the problem and minimize the potential j exposure to the public and personnel at the waste processor. The same day MURR j was informed of the problem with the shipment, a representative of the University was available in Oak Ridge, Tennessee to verify dose measurements and, if needed, i assist with the investigation. When the waste processor was prepared to open the l package on May 19,1994, MURR had a Health Physicist on site to help with identifying j waste components and identifying the cause of the elevated dose rate.

i-i MURR made no additional waste shipments until the staff completed an evaluation of

, the problems associated with this shipment and implemented the appropriate i corrective measures. Procedures were reviewed and revised to correct the weaknesses

. identified. Waste shipping personnel received training on the new procedures and the lessons learned from the shipment in question. Revisions to the procedures include

! specific instructions for more detailed surveying of waste material as it is loaded in the j container. These procedures emphasize identifying material that may require special 1 treatment prior to shipment. Proper blocking and bracing of the waste in the package j is also addressed.

Formal training has been improved for MURR waste shipping personnel in the i processes and procedures associated with radioactive waste shipping. Waste shipping

! personnel attended the " Hazardous Waste Management Sumrr.er Institute" which j covers 49 CFR requirements, and a member of the MURR staff attended the four day i

4 i

u

-4 g o .

Director of Enforcement, NRC December 21,1994 Page 3

" Radioactive Waste Packaging, Transportation, and Disposal Workshop" presented by Chem Nuclear Systems, Inc the week of November 14,1994.

Subsequent radioactive waste shipments have been made by the retrained personnel using the revised procedures. The documentation associated with these shipments was reviewed by NRC personnel during a reactive inspection the week of Augurt 15,1994, and no violations were noted. In addition, two representatives of the US Department of Transportation inspected the MURR hazardous materials shipping program during the week of December 5,1994. Their inspection included a review of waste shipments and no violations were identified.

4. Corrective steps that will be taken to avoid further violations.

i As a result of the problems with the shipment in question, the MURR Shipping Task l Force has broadened the scope ofits responsibilities. The Task Force now reviews all types of radioactive material shipments including waste and spent fuel. A single '

l shipping group now has responsibility for final review of the paperwork and documentation associated with all radioactive shipments leaving MURR.

5. Date when full compliance will be achieved.

I l The University of Missouri Research Reactor believes it is in full compliance at the l present time and has been since procedures were revised and training completed in June of 1994. There have been no problems identified with regard to radioactive waste shipments since May 6,1994.

Sincerely, I 2A# -

John P. Ernst ,

Manager, Reactor Health Physics l ENDORSEMENT: , j .: y s, Reviewed and App ed Q]'y.Q 3f,3 ,"Jj S.!j,g 4 , onsrm M. cqqwir 7 ' '

^v i / _,

g .,

-6 /4 s NOTARY PUBUC STATE OF M!SSOURf txm cewrr f7 * * * " '

J. Charles McKibben Associate Director i xc: Regional Administrator, US NRC Region III S. Weiss, NRC/NRR Reactor Advisory Committee Reactor Safety Subcommittee J McCormick, Interim Vice Provost J.Rhyne

- -