Rev 1 to Procedure 6575-SUR-4523.01, Quarterly Facility Insp Procedure
ML20078A270
Person / Time
Site: Saxton File:GPU Nuclear icon.png
Issue date: 12/03/1993
From: Good B
SAXTON NUCLEAR EXPERIMENTAL CORP.
To:
Shared Package
ML20078A208 List:
References
6575-SUR-4523.0, NUDOCS 9501240341
Download: ML20078A270 (12)


Text

Number SAUM HMM S'** " "" '**' 5*P* *"

'P ' "

Policy and Procedure Manual 6575-SUR-4523.01 Trs.

a.vtsson No.

Quarterly Facility inspection Procedure 1

w ice =a w e a pon im ome.

en.cirv. o==

Saxton Tech. Spec. quarterly inspections 6675 12/14/93 This document is within QA plan scope X

Yes No Safety Reviews Required X

Yes No List of Effective Pages

,P_ggg Revision f_agg Revision P.agg Revision P gg Revision a

a 3

1.0 1

2.0 0

3.0 1

4.0 1

5.0 1

El-1 0

El-2 0

E13 1

~

E21 0

E3-1 0

E4-1 1

ES 1 1

GpUN DOCUWr ; ggg CCY r > gg Yf..

COPV N

m b

y

  • I y..;

gwwg,gx

~g m,

SNEC Radiation Safety ONicer

,p g nJDh SL Q

Saxton General Manager /VP, SNEC 4

f) v 1.0 inu 9501240341 950112 PDR ADOCK 05000146 p

PDR

SAXTON NUCLEAR 8'*'"""***"*'

Policy and Procedure Manuel 6575-SUR-4523.01

.Dee.

m no.

Quarterly Facility inspection Procedure.

0 1.0 PURPOSE To ensure that the Sexton facEty is in a status that wW not endanger the health and safety of the public, and that the facity is maintained in compliance wth its Technical Specifications.

2.0 APPUCABlWTY/ SCOPE This procedure is applicable to aR Tech. Spec. quarterly inspections performed at the Saxton Nuclear

-)

Experimental Corporatkm (SNEC) facity.

DEFINITION 8 None 4.0 PROCEDURE 4.1 Discussion 4.1.1 At least two (2) people, one of whom wil be a quaillied Radiological Cuarols Techmcien, wBI l

make the inspection.

i 4.1.2 The inar=*wn wW be made in accordance wth this procedure and Ref. 6.7 j

4.1.3 if any of the locks, doors, or gates inspected are found open, or appser to be tampered, i

Ref. 6.3 shall be implemented as appropriate i

4.2 Accaretus

-i 4.2.1 Set of keys to open a8 SNEC locks.

I 4.2.2 Flashlight 4.2.3 Calibrated portable survey meters for ftxed point Containment Vessel radiation I

measurements and Exclusion Area fence survey i

4.2.4 Sample bottles.

4.3 Performance i

f NOTE i

The order of performing the inspection steps we be at the discretion of personnel performing the inspection.

1 4.3.1 The SNEC General Manager or RSO wW designate personnel to conduct this survallance.

4.3.2 AN inspection sheets ws be submtted to the SNEC RSO for review. Upon RSO review, au Inspection Sheets we be forwarded to the Saxton General Manager for final review and 3

fring.

1 2.0 ame

SAXTON NUCLEAR 8'*' " ""d'" "****"*" C 'a "

Policy and Procedure Manuel 8575-SUR-4523.01 no..

~

N No.

' Quarterly Facility inspection Procedure 1

4.4 Perform facElties check as outlined in Exhbit 1, Part 1.

Send contamment sump and CV pipe tunnel water samples for appropriate analysis Water-4.4.1 samples are requred to be analyzed for groes beta gamme activity and for the isotopic j

concentration of an signecent radionuclides.

4.4.2 The use of the TMI Chemetry results are for quality control purposes only. A split GA I

sample for TMI Chemistry wEl be taken of CV sump water. Reguistory reporting of results from TMI Chemistry can only be used it: 1) other sources of analysis are not avalable, and l

2) the results must as a mmimum have an LLD consistent with 10 CFR 20, Appendk B, Table 2. Column il concentrations,3) and/or approval of the SNEC General Manager.

4.5 Performance of the Ouarterty Containment Vessel Survey This survey is intended to trend the migration of the contamination within the containr.ient structure, l

to verNy does rates, to sample the CV sump if poselbie and change out the high officency futer on j

the containment vessel breather tube.

NOTE 1

i The breather tube akms for an exchange of air between the outside air and the containment environment. The high offidsney futer is in place

[

to fBter particulate metter, 4.5.1 Before opening the CV outer door caN the Diaparch at (814) 535-6466 State your name and inform them you are about to make a Contamment Vessel entry.

4.5.2 The twenty fixed point locations (see Exhibit 2) serve as the location for general area beta gamma does rates and contamination survey points. These locations are also posted inside containment. At each location a general area beta-gamma does rate and smear sample are to be taken. The RO-? is the preferred instrument for does rate measurements.

In addition to the flued point locations, random does rates and smears should be taken.

Five to ten random locations are suggested. Radiation and contamination surveys to be done in accordance with Ref. 6.4 and Ref. 6.5. Exhibit 1, Part 2 shall also be fBled out for the ftxed point survey resuka 4.5.3 The breather tube futer shal be changed out and surveved quarterfy. Contact the SNEC RSO to ensure the availablity of replacement fBters.

4.5.3.1 To replace the fIter, loosen the wing nuts and remove the retaining plate.

i 4.5.3.2 Remove the used filter.

4.5.3.3 Bag the used fIte* and visuaNy inspect the breather tube port for any obstructions

i 3

4.5.3.4 instal the new filter, replace the retaining plate and tighten the wing nuts.

[

3.0 mu i

~

Number SAXT0N NUEN Saxt n Nu leer Experimental Corporation Policy and Procedure Manual 6575-SUR-4523.01 Tru.

Amason No.

Quarterly Facility inspection Procedure 1

4.5.3.5 Romme fRter to low background area and survey for unrestricted release. When filter is redged for unrestricted use t is to be forwarded to a laboratory for gamma specu%f. Contact SNEC RSG for help in notWying applicable lab and/or initiating sample coEection sheets. FIter gamma spec results are to be maintained with Exhibit 1 for each quarterly survey.

4.5.4 Checking the CV Sump Level and Taking the Sample 4.5.4.1 Proceed to the 812' elevatkn of the Containment Vessel (See Map, Exhibit 2).

Unlock and open grating. Note you are entering a posted, locked, high rad and step off pad area. Proceed down the stairs to the basement level, go around the shield wall. The CV sump is near the Rod Room door. Verify the Roo Room door is locked and document on Exhibit 1.

NOTE Exhibit 3 shows a cross section of the Containment Vessel and the sump location.

E 4.5.4.2 Measure the water level of the sump. Document water level on the appropriate line on Exhibt 1.

4.5.4.3 Use the hand pump prwided to pull two,500 mi samples. Rinse each sample bottle and cap wth the sump water prior to taking the sample. The required sample ar":mt can vary so contact the SNEC RSO for the necessary sample volume.

NOTE The sump sample actMty typicaNy requires that the TMI Wasta Disposal Group package and ship the sample to the applicable labs for analysis.

Contact the Waste Disposal Group to arrange support.

4.5.4.4 Take appropriate measures to ensure the sample (s) are less than 1000 dpm/100 2

cm for smearable, extemal betagamma contamination for rernoval from the Containment Vessel. If the Waste Disposal Group representative is present, tum the sample (s) over to him/her for processing. If the indMdual is not present the samples are to be staged where appropriate and posted per the requirements of Ref. 6.6 unt8 the samples can be packaged and shipped.

4.5.5 A general area radiation and contamination survey should be documented to support the entry into the lower elevations per References 6.4 and 6.5.

4.5.6 Secure all locks, doors and gates and notify Dispatch again when the outer CV door is secured.

4.5.7 Ensure Exhibit 1 is completed and forward al survey results to the SNEC RSO for review.

4.0 mu

Number SAXTON NUCLEAR Saxton Nuclear Experimental Corporation Policy and Procedure Manuai es7s. sun.4s23.o1 Tine f%msem No.

Quarterly FaciHty inspection Procedure 1

4.6 Fence Survey 4.6.1 A radiation survey shall be performed around the outside of the SNEC sto fence, the Containment Vessel (exclusion area) fence, common SNEC/Penelec fence (s), and the Penelec outer fence which describes the limts ct the SNEC /Penelec line shack property The survey shall consist of general area dose rates. As a minimum, an instrunant wth uRom/hr senskMty shall be used for this survey. Highest general area dose rates are to be filled in on Exhibit 1, Part 2. Readings should be recorded on Exhibits 4 and 5 or equivalent forms, as appropriate.

5,0 RESPONSIBlWTIES Inspections shad be conducted no less than once per calendar quarter. The Saxton General Manager or designee is responsible for ensuring that the quarteriy inspections are conducted according to this procedure. Technical Specification violations shah be reported to the SNEC Ucensing engineer or his/her designee, W is responsible for notifying the NRC in accordance wth Tcchnical Specification Section B.S.a.

6.0 REFERENCER 6.1 SNEC Technical Specircations 6.2 6675-PLN4542.01, *SNEC Radiation Protection Plan

  • 6.3 6675-ADM4500.06,
  • 6.4 6675-ADM4500.11, "Radbetion Surveys
  • 6.5 6675-ADM-4500.10, " Surface Contamination Surveys" 6.6 6675-ADM4500.14, " Establishing and Poeting Areas
  • 6.7 6575-ADM4500.24, " Initial Containment Vessel Entry' 6.8 6575-ADM4500.22, " Environmental Monitoring
  • 7.0 ATTACHMENTS 7.1 Exhibit 1 - SNEC Inspection Sheet 7.2 Exhibit 2 - Permanent Survey Points SNEC Reactor Containment Bldg. Map 7.3 Exhibit 3 - Containment Vessel Cross-Sectional View 7.4 Exhibit 4 SNEC Site and Exclusion Area Fence Map 7.5 Exhibit 5 - PENELEC Perimeter 5.0 mu

i l

1 Number SAXTON H M M Saxt n Nu lear Experimental Corporation Policy and Procedure Manual 6575-SUR-4523.01 true r*ws on te.

Quarterly Facility inspection Procedure 0

EXHIBIT 1 LNEC Iftspection Sheet Part 1 Page 1 of 3 (Facilities Check Ust)

Date:

Name of indindual(s) Performmg Checkhet (Print / Sign)

Initials:

1.

Call the Depatch to inform them of irnpending Containment Building entry (814-535-5455).

2.

Confined space permit generated for CV entry.

3.

CV fenced area gates are in satisfactory condition and locked.

4.

Extemal Cc,a^ naent Bu8 ding in so afactory condition.

5.

Containment area fence in satrefactory condition and property posted (as per RSO)..

6 Breather pipe is ret clogged by woual inspecton and the filter is changed out.

7.

Ca-,i,-si personnel hatah asaled.

8.

Equipment hatch sealed.

g.

Red Meterial sign on the Containment Building door is in satsfactory conditort. Vessel door is in satisfactory condition and double locked, f

1ocked High Rad staarwelt grating is in n _

-T-y condreon; locked, property posted, and lock is 10.

in satsfactory condibon.

11.

Inspect auxiliary compartrrAnt to see that no water is present and that its condition is satefactory.

12.

Check the containment sump for water. Measure and record the water level (rf appropnate), sample and attach results (when received from analytical lab).

CV Sump Water Lavol 13.

Rod room door is in satisfactory condibon and is locked.

14.

Remove allinspecton equipment from Levels below 812'.

15.

Lock the stairwell gate.

16.

Remove all inspecton equipment from Lavels 812' and 818'.

17.

Turn off all uloctneal breakers.

18.

Close and took CV outer door.

19.

Ensure that the CV Pipe Tunnel hatches are in satisfactory condition.

)

20 Open the East CV Pipe Tunnel hatch, measure and record the water level (if appropnate), sarnple and send for analysis. Oose hatch. Note: Attacti analysis results when rooerved from analytical lab.

]

CV Pipe Tunnel Water Lavel E1,1 mu l

1 1

k SAXTON' NUCLEAR S** " "d" **""

"P"*""

Policy and Procedure Manual 6575 SUR-4523.01 rree

%s on wo.

Quarterly Facility inspection Procedure O

EXHIBIT 1 (Cont'd)

SNEC inspection Sheet Part 1 (Cont'd)

Page 2 of 3 (Facilities Check Ust) bitials 21.

Does and sock CV fenced area gates.

22.

Check condellon of exclusive area locks, vehicle gates and/or intrusion barriers.

23.

hopect exclusion area fence and ensure proper postng as per RSO.

Call the Dispatch and ensure that the intrueion alarm was received and has been reset (814-635-5465).

24.

25.

Re6ock all doors and secunty gates upon leaving if not already accomplished.

i Reviewed By-(Signatare)

(Dete)

Saxton Radiation Safety Omcor Reviewed Br (Signature)

(Dato)

Saxson General Manager i

E12 mu

)

1 l

J Number SAXT0as asiI0I EnR Saxton Nuclear Expenmental "6 ion A

m av L po, icy,no e,oc ou,, u,no )

ss73. sun-4s23.oi noo Remion No.

Quarterly FaciHty inspection Procedure 1

EXHIBIT 1 (Cont'd)

SNEC inspection Sheet Part 2 Fage 3 of 3 (Rediological Controts Check Ust)

Date:

1.

Survey general area insi6e Comainment Bdg.

Sgnature 2.

Survey the 20 permanerrtly marked survey points.

Sgnature 1

mRom/hr 6

mRom/hr 11 mRom/hr 16 mRom/hr 2

mRorn/hr 7

mRom/hr 12 mRom/hr 17 mrem /hr 3

mRom/hr 8

mRom/hr 13 mRom/hr 18 mRom/hr a

mRom/hr g

mRom/hr 14 mRom/hr 1g mRom/hr 5

mrem /hr 10 mRom/hr 15 mRom/hr 20 mRom/hr 3.

P' ovide radiation surwy instrument informaton below:

Segnature Instrument type:

Serial Number

  • Calibration Due Date:

4.

Smear 20 permarwntly marked survey points.

(attach copy of cornp6eted survey form)

Sgnature 2

2 2

2 1

dpm/100cm 6

dpm/100cm 11 dpm/100cm 16 dpm/100cm 2

3 2

2 2

dpm/100cm 7

dpm/100cm 12 dpm/100cm 17 dpm/100cm 2

2 2

3 dom /100cm 8

dpm/100cm 13 dpm/100cm 18 dpm/100cm2 2

3 2

2 4

dprn/100cm g

dpm/100cm 14 dpm/100cm Ig dpm/100cm 2

2 2

2 5

dpm/100cm 10 dom /100cm 15

, dpm/100cm 20 dpm/100cm 5.

Perform the fence radiological survey.

Sgnature Provide radiation survey instrurnent information bok Instrurnent typer:

Serial Number:

Calibration Due D **:

Show the highest does rates:

SNEC EA SNEC CV.

Pene6ec Yard:

pRem/hr prom /hr pRem/hr Rev. owed by SNEC RSO:

(Sgnature)

Date Saxton Radiation Safety Omoor Amewed by Saxton Ganeral Managen (Sgnature)

Date Sexton General Manager E14 mu.

m-

SAXTON NUCLEAR S** " ""c'* *"*"*

'a '"" "

Policy and Procedure Manual 6575-SUR-4523.01 re.

% on No.

Quarterly FacilRy linpaction Procedure o

EXHIBIT 2 20 Permanent Survey Points Map Containment Vessel 818' and 812' Elevation s

m-=

.*g Peas.,s aw, was ewesa MTtet

  • g s

~

g.

I I

/

l 0 m

a.

=

I s

l l

t I

8 g

(

l

. ;ry 2

s 8

\\ as se so e o m, M M======.

B 1

mest bO8 3

'S i

T

=

's, E

s i

}:,:b b

's N<

s- _ _ _ - _ _

E p

A baru Q=r 4

1 E2-1

SAXTON NUCLEAR S**on * = e5= * =ntd c apa a n Policy and Procedure Manual 6575-SUR-4523.01 a

on m.

Quarterly Facility inspection Procedure O

1 EXHIBIT 2 containment vessel cross-sectional ymw i

L 4

=e f

.F m_._

-81F*4*

i

[

s S es-f mi -c si t h i

w

--,or 1

=

e a

o 1

h pg*,y y;

7 x

/

sF 5

~C

-a.

I II5lEIEE E3-1

Number SAXTON NUCLEAR S'" n Nuder EqMnwntal Cwination Pdicy and Procedure Manual 6575-SUR-4523.01 Tree

%.en No.

Quarterly Facility inspection Procedure 1

EXHIBIT 4 SNEC Exclusion Area Map SURVEY INFORMATION RADIATION SURVEY Location inst

_ inst S.N.

S.N.

Reason Cal.Due Cal.Due B.C.F.

B.C.F.

Date Time Tech Tech Notes: Radiation in rnRem/hr unless otherwise Reviewed By noted. Dosa rates are general area unless am ed s.-

jg cs

- q.

co u.. n

.Ij.

1 a >:,6 !; '-py. f

  • M.4 7

N LEGENO gegpsese Q Ea, hb 2

~*

f :3'o""s Vesent jp Personnel

(

r Access Door r'

r

[

l n

,y

/\\

E4-1 mu

SAXTON NUCLEAR S'" n NWw Egwunwnal Capwadon Policy and Procedure Manual 6575 SUR-4523.01 To m m.

Quarterly Facility inspection Procedure 1

iDole n s PENELEC Perimeter SURVEY INFORMATION RADIATION SURVEY Location Inst Inst S.N.

S.N.

Reason Cal.Due CalcsJe B.C.F.

B.C.F.

Date Time Tech Tech Notes: Radiation in rnRem/hr unless Power Level othenmee noted. Does rates are general Reviewed By N

U SU85TATION W

AREA SNEC LARE SHAfr GARAGE ES 1 mu

-