ML20077S464

From kanterella
Jump to navigation Jump to search
Motion for Reconsideration of ASLB Ruling Re Notification/ Preparation on Evacuation Time Estimates
ML20077S464
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 09/19/1983
From: Holmes G
HOLMES & ELLIS, SEABROOK, NH
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20077S451 List:
References
NUDOCS 8309220096
Download: ML20077S464 (1)


Text

~

DOCKETED uSNRC -

UNITED STATES OF AMERICA 13 SP21 Pl2:17 NUCLEAR REGULATORY COMMISSION

- BEFORE THE ATOMIC SAFETY AND0 LICENSING NOF SECRETAH-00CKE-TING & SERVICI.

BRANCH

)

In The Matter Of: )

  • Public Service Company of )

New Hampshire et a1 ) Docket Nos. 50-443 Seabrook Station, Units 1 and 2) ) 50-444

)

0 -

TOWN OF SEABROOK HOTION FOR RECONSIDERATION OF BOARD'S RULING WITH RESPECT TO NOTIFICATION / PREPARATION ON EVACUATION TIME ESTIMATES 4

Pursuant to 10 C.F.R. 2.730 (c), the Town of Seabrook, New Hampshire, designated as an interested municipality, motions for reconsideration of i the ruling of the Atomic Safety and Licensing Board with respect to its order rejare.ing Massachusetts' contention on evacuation time estimates.

It is set forth that the evacuation time estimates should include'notifica- I tion / preparation time.

Respectfully submitted, TOWN OF SEABROOK By Its Attorneys HOLMES & ELLS Dated: September 19, 1983 By:' & M Gary . Ho}6es /

47 innac/nnetRoad Hampton, NH 03842 (603) 926-6162 fg gO G