Discusses Corrective Action Plan for Control Room Emergency Ventilation Sys.Submittal of long-term Corrective Actions Plan Rescheduled Until 911122.Summary of Commitments Encl
ML20077R942
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/21/1991
From: Zeringue O
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9108260242
Download: ML20077R942 (3)


Text

_

m

[

.~

k Tenmu,eo veey Aufw4 Pod Oke Boa N00. Cw.au Atabama YK9 AUS 21 1991 O.J 'lko'Zenngue Vice Preexte1. Brans Feny Orcems i

t U.S. Nuclear Rcgulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 v

' Gentlemen:

In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - CONTROL ROOM EMERGENCY rENTILATION SYSTEM (CREVS) CORRECTIVE ACTION PLAN i

I

References:

1) TVA letter, dated February 14, 1989, Unit 1, 2, and 3 Technical Specification No. 265T (RIMS L44 890214 803)
2) NRC letter, dated September 18, 1989, Technical Specification Revisions Concerning Operability of the Control Room Emergency Ventilation System (RIMS A02 890921 801)
3) TVA letter, dated September 15, 1958, Control Room Habitability (RIMS L44 880915 801) l In Reference 1, TVA requested approval to allow operation during Cycle 6 i

of Browns Ferry Unit 2 with the CREVS considered technically inoperable since it did not meet its design basis for essentially zero tnfiltered inleakage. CREVS is required to remain functional during Cycle 6 and all L

applicable surveillances are being performed and action statements i

followed. Approval of this proposed technical specification amendment L

was provided in Reference 2.

~ As part of Reference 3,-TVA committed to present the long-term corrective action plan for CREVS to NRC within ninety days after Unit 2 restar*. TVA is still evaluating this issue and the commitment is being rescheduled until November 22, 1991. At that

-time, TVA will submit:

e I'

' 'r t} *~

~

9t'082 0242 910821 ADOCK0500g9

\\

DR I'

ll i

e U.S. Nucicar Regulatory Commission AUB 211931

1) A description of the control room operator dose calculations and a comparison to Standard Revicy Plan methodology, and
2) _A description of the modifications which will be implemented as part of the resolution of this problem.

A summary list of commitments conta!ned in this letter is-provided in the enclosure.

If you have any questions, please telephone Patrick P.

Carier, Site Licensing Manager at (205) 729-3566.

Very truly yours, TElmES EE VALLEY AUTHORITY O

-2e)ringueJul( (LL 0.

Enclosure cc (Enclosure):-

NRC Resident Inspector-Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alab3ma 35609-2000 Mr..Thierry M. Ross, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission

-Regicn II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 w

ENCLOSURE BROWNS FERRY NUCLEAR PLANT

SUMMARY

OF C0!91ITMENTS On November 21, 1991, TVA will submit!

1.

A description of the control room operator dose calculations

-and a comparison to Standard Review Plan methodology, and 2.

A description of the modifications which will be implemented as part of the resolution of la problem.

I I