Monthly Operating Rept for Dec 1994 for Waterford 3
ML20077R909
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/31/1994
From: Becker T, Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-95-0002, W3F1-95-2, NUDOCS 9501230193
Download: ML20077R909 (7)


Text

^

Ent r,;y Cper tion ,Inc.

-== ENTERGY ~

Ku .a l A 78t;6 Tc' ,04 7 R f,7 l A R. F. Burski I4 s k ,f y 1 $4i 3 W3F1-95-0002 A4.05 PR January 16, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of December, 1994. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours, 4J R.F. Burski Director Nuclear Safety RFB/DFL/ssf Attachment cc: L.J. Callan (NRC Region IV)

C.P. Patel, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC Resident inspectors Office

- c' o e e , ,

9501230193 941231 PDR ADOCK 05000382 //

/ [f R /

PDR vf

. . . . . - .~ . - .- . . . .. . ~ . . - . ..

i NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS  :

WATERFORD 3 DECEMBER 1994 The unit operated at an average reactor power of 99.7% and experienced no shutdowns or significant power reductions during the period.

p 0

b h

I 4

.k PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES ,

WATERFORD 3 During the month of December 1994, there were no pressurizer safety valve failures or challenges.

t

?

OPERATING DATA REPORT

  • DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY,1995 COMPLETED BY: T.S. BECKER TELEPHONE: 504-739-6683 OPERATING STATUS
1. Reporting Period: December,1994 Gross Hours in Reporting Period: 744
2. Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104
3. Power Level to which Restricted (if any) (Net MWe): N/A
4. Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE
5. Number of Hours Reactor was Critical 744.0 7,622.8 68,722.8
6. Reactor Reserve Shutdown Hours 7. Hours Generator was On-line 744.0 7,556.1 67,844.3
8. Unit Reserve Shutdown Hours 9. Gross Thermal Energy Generated (MWH) 2,515,464 25,301,132 224,329,609
10. Gross Electrica: Energy Generated (MWH) 835,620 8,313,680 74,734,460
11. Net Electrical Energy Generated (MWH) 801,685 7,931,921 71,242,366
12. Reactor Service Factor 100.0 87 1 84.6
13. Reactor Availability Factor 100.0 87.0 84.6

.t

14. Unit Service Factor 100.0 86.3 83.5
15. Unit Availability Factor 100.0 86.3 83.5
16. Unit Capacity Factor (using MDC) 100.2 84.2 81.6
17. Unit Capacity Factor (Using DER) 97.6 82.0 79.4
18. Unit Forced Outage Rate 0.0 0.4 3.2

OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: JANUARY,1995 COMPLETED BY: T.S. BECKER TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Cord)

19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):

N/A

20. If Shutdown at end of report period, estimated date of startup:
21. Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
22. Hours in Reporting Period 744.0 8,760.0 81,265.0
23. Unit Forced Outage Hours 0.0 31.5 2,210.2
24. Nameplate Rating (Gross MWe): 1200
25. If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons: N/A i

i 1

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFC; 3 DATE OF REPORT: JANUARY, 5 COMPLETED BY: T.S. BECKE TELEPHONE: 504-739-66.

MONDI QECEMBER.1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWe-NET) 1 J075 17 1081 2 1077 18 1081 3 1001 19 1082 4 1077 20 1082 5 1077 21 1083 6 1077 __

22 1083 7 1078 23 1082 8 1078 24 1083 9 1079 25 1083 10 1079 26 1082 11 1979 27 1080 12 1077 28 1081 13 1079 29 1083 14 1081 30 1082 ,

15 1080 31 1083 16 1080 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l I

UNIT SHUTDOWNS AND POWER REDUCTIONS .

1 DOCKET NUMBER: 50-382 . .-

UNIT NAME: WATERFORD 3 -'

DATE OF REPORT: JANUARY,-1995 COMPLETED BY: T.S. BECKER TELEPHONE- 504-739-6683

, REPORT FOR DECEMBER.1994

Type Method of Shutting F = Forced Duration Down *he Reactor or- Cause, Comments and  ;

Number - Date S = Scheduled (Hours) Reason (1) Reducina Power (2) Corrective Actions >

NONE e

i i

(1) REASON (2) METHOD

'A = Equipment Failure (explain) 1= Manual B= ~ Maintenance orTest 2= Manual Scram C= Refueling 3= Automatic Scram ,

D= Regulatory Restriction 4= Continuation from Previous Period

E= Operator Training and 5= Power Reduction -

. License Examination 6= Other(explain)

F= Administrative G= Operational Error (explain)

H= Other (explain) l l .