|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20086S6571991-12-27027 December 1991 Application for Amend to License R-84,reissuing Tech Specs in Entirety ML20077R4901991-08-16016 August 1991 Application for Amend to License R-84,requesting Change of Wording in Tech Spec 3.1.1 to Avoid Any Regulatory Questions Re Normal Power Fluctuations While in Servo Mode ML20082N9961991-08-0505 August 1991 Application for Amend to License R-84,reflecting Assignment of R Bumgarner as New Institute Director.Curriculum Vitae Encl ML20055G0351990-07-13013 July 1990 Addendum to 900430 Application for Amend to License R-84, Correcting Typo in Tech Spec Section 3.2.2 ML20043H1631990-06-19019 June 1990 Application for Amend to License R-84,requesting Change to Tech Specs,Per 10CFR50.90 Re Watchdog Scrams to Console ML20042F0271990-04-30030 April 1990 Application for Amend to License R-84,increasing Max Licensed Steady State Power Level from 1,000 Kw to 1,100 Kw, Allowing Implementation of Fuel Follower Control Rods & Future Installation of Microprocessor Based Instrumentation ML20069H6201983-04-0404 April 1983 Application for Amend 18 to License R-84,proposing Minor Administrative Changes to Current & Pending Tech Specs & Pending SAR to Incorporate Mod to Reactor Bldg Ventilation Sys.No Unreviewed Safety Questions Involved.Details Encl ML19338E8401980-10-0303 October 1980 Application to Renew License R-84 for 20 Yrs 1991-08-05
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20086S6571991-12-27027 December 1991 Application for Amend to License R-84,reissuing Tech Specs in Entirety ML20077R4901991-08-16016 August 1991 Application for Amend to License R-84,requesting Change of Wording in Tech Spec 3.1.1 to Avoid Any Regulatory Questions Re Normal Power Fluctuations While in Servo Mode ML20082N9961991-08-0505 August 1991 Application for Amend to License R-84,reflecting Assignment of R Bumgarner as New Institute Director.Curriculum Vitae Encl ML20055J4791990-07-23023 July 1990 Amend 19 to License R-84,approving Installation of Microprocessor Based Instrumentation & Control Sys ML20055G0351990-07-13013 July 1990 Addendum to 900430 Application for Amend to License R-84, Correcting Typo in Tech Spec Section 3.2.2 ML20043H1631990-06-19019 June 1990 Application for Amend to License R-84,requesting Change to Tech Specs,Per 10CFR50.90 Re Watchdog Scrams to Console ML20042F0271990-04-30030 April 1990 Application for Amend to License R-84,increasing Max Licensed Steady State Power Level from 1,000 Kw to 1,100 Kw, Allowing Implementation of Fuel Follower Control Rods & Future Installation of Microprocessor Based Instrumentation ML20069H6201983-04-0404 April 1983 Application for Amend 18 to License R-84,proposing Minor Administrative Changes to Current & Pending Tech Specs & Pending SAR to Incorporate Mod to Reactor Bldg Ventilation Sys.No Unreviewed Safety Questions Involved.Details Encl ML19338E8401980-10-0303 October 1980 Application to Renew License R-84 for 20 Yrs 1991-08-05
[Table view] |
Text
. _ , _ - . . - . _ .
l I
- [,pg' DEFENSE NUCLEAR AGENCY ,
in <
ARMED FORCES R ADIOBiOLOGY RESE ARCH INSitiUTE I BE T H E SD A, M AR'v L AND 20814 5145 SulHECT: Addendum to Request for Cnanges to AFRRI August 16, 1991 i Technical Specifications for License No.
R.84 date April 30,1990.
Document Control Desk i U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l
Gentlemen:
I am writing to request a change of wording in Technical Specification 3.1.1. The purpise of :
this request is to avoid possible regulatory questions regarding normal power fluctuations while l in servo mode an( small changes in the displayed steady state power between thermal power ;
calibrations. The current wording of the second sentence of the specification reads as follows: !
"The normal steady state operating power limit of the r. actor shall be 1.0 megawatt."
We request to change the wording of the fore mentioned sentence tc Ss follows: *
"The normal steady state operating power limit of the reactor should be 1.0 megawatt."
r :
l Please find enclosed a complete replacement page which reflects this requested change. l l
If you have any questions or comments, please contact the Reactu Facility Director, Mr. Mark i Moore, or the Reactor Operations Supervisor, Capt. Matt Forsbacka, at (301)-295-1291. Thank you for your cooperation.
Sincerely, /
/ -
1
/
l f')GI OR/,,IRE W.
ING,11146)u6 j R
Colonel, !!SC, UJAF ,
- Director !
Enclosures:
as stated t
1 i r
l$$"$$b gp2O
// <
+
cc: USNRC - Region 1 Project !!ngineer Division of Reactor Projects USNRC - lleadquarters - Project Manager Nuclear Reactor Regulation
)
i