Monthly Operating Rept for Jul 1991 for Jm Farley Nuclear Plant Unit 2
ML20077Q080
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/31/1991
From: Dennis Morey, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9108210051
Download: ML20077Q080 (5)


Text

_

A1atoma % ca ner,-

40 h.wre s cenmr v an v.a ,

~

Pou Oru 0: 4 09:,

. a4 wyam Awa a yv

. Te c 4 . > as t a Ma J. D. Woodard /k!Il Xilllil!'OWCf u .. n. w .n r" August 13, 1991 . ., , ,,,

w, , r, ,

Docket No. 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Unit 2 Monthly Operatina . Data Report Attached is the July 1991 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted,

(

b Woodard -(

AEJ:edb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell 9108210051 910 7 c.: 1 POR f4 DOC r. o :,wuM 4 R pp

$bN

'It

JOSEPH M. FARLEY NUCLEAR DLANT UNIT 2 NARRATIVE

SUMMARY

Of OPERATIONS July 1991 There were no unit shutdowns or major power reductions during the month.

The following major safety-related maintenance was performed during the month:

1. 2A component cooling water heat exchanger was removed from service and two leaking tubes were identified and plugged.
2. Number 2 diesel driven fire pump was removed from service for extensive corrective and preventative maintenance.

. OPERATING DATA RP. PORT  !

9 DOCKET No. 50-364 (

DATE August 7, 1991  ;

COMPIETED llY D. N. More ,

TELEPil0NE]705TBYU 51gJT> l OPERATING STATUS '

k Notes I

1. Unit Name: Joseph H. Farley - Unit 2 1) Cumulative data since  !
2. Reporting Period: July 1991 7-30-81, date of
3. Licensed Thermal Power (HVh e 2,652 commercfal operation.  !
4. Nameplate Rating (Gross MVe):~ EO
5. Design Electrical Rating (Net HVe): 879
6. Maximum Dependable Capacity (Gross RVe): 8 674. 2 ,
7. Maximt.m Dependable Capacity (Net MVe): 824.0 _ _ _ . _

j

8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, j Give Reasons: N/A i
9. Power Level To Vhich Restricted, If Any (Net MVc): _ N/A  ;
10. Reasons For Restrictions, If Anyt, N/A j t

This llonth Tr-to-Date Cumulative

11. Hours In Reporting Period 744 5,087_ 87,696
12. Number Of Hours Reactor Vas Critical 744.0 4,826_.9 75,211.1  :
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Pours Generator On-Line 744.0 4,732 74,283.2 ,

0.0 e

15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Thetmal Energy Generated (HVH) I~lK6,073.5 12,249,914- 139,453,862
  • I
17. Gross Electrical Energy Generated (MVH) 634,882 3i984,152 ~67
18. Net Electrical Energy Generated (HVd) 604,824 ~ 3,783,080 M,190,10877,202 l
19. Unit Service Factor 100.0 93.0 84.7 [
20. Unit Availability Factor 100.0 93.0 _ _8 4. 7 j
21. Unit Capacity Factor (Using HDC Net) 98.7 90.3 82.1  ;
22. Unit Capacity Factor (Using DER Net) 98.1 BVJ 81.T i
23. Unit Forced Outage Rate 0.0 4.5 4.3 i
24. Shutdowns Scheduled Over Next 6 Honths (Type, Date', and Duration of Each): i t

N/A

25. If Shut Down At End Of Report Petiod, Estimated Date af Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/01 '

INITIAL ELECTRICITY 5577T781 05/25/81 COMMERCIAL OPERATION U_H70T/U1 ,57/30/81 I

Form 2/30 ,

?

\

DOCKET No. 50-364 UlGT 2 DATE August 7, 1991 COMPLETED BY D. N. Morey_.

TELEPil0NE (205)899-5156 HONTil July DAY AVERAGE DAILY POVER LEVEL DAY AVERACE DAILY POVER LEVEL (MVe-Net) (MVe-Net) 1 816 17 819 2 814 18 817 3 015 19 815 4 016 20 817 5 815 21 816 6 817 22 014 7 819 23 014 8 816 24 __

B18 9 816 25 820 10 817 26 817 11 814 27 815 12 811 28 814 13 811 29 814 14 751 30 815 __

15 792 31 817 16 816 INSTRUCTIONS On this format, list the average daily unit power level in MVe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

tMIT maan.mu AND POWER RCUCTIGG COCZZT ND. 50-164 +

IINIT MAME J. C3. FARIET - tact 2 DATE Ang2st 7, 10D1 ,

C:MPTJ: ED ST D. 3. M*ET .

FIPCRT M711t JUI.T TEIDHEE (2059899-5156 '

i i I i l 1 nErmo cr i t.ransEE I I I cx st a cz m m 1 1 I I I ImaT2= 1 I smTun  ! Ercer I u=Im To I i TrrE 1 ta xas) i mEAsm2 ; , , ,, ,,,,1 g ,,,,,, , y co,,eI asrae1, coc ,s - -

2

!no.  ; care , ,,,, ,,, _ _ g

[There were no tz.it shut &nes or majer power reductierts dttring the month of Jtily.  ! l l 1 1 I . I I I I I i I 1 1 I I i i l i I i i l i i i i i i i i i i i I

I i i i i f I I I I I I I i i i  ! I i i i  !

i i i i  ! i I I i i i r i l I I I I I I I -1 I I I I I I I I I i  ! I i i i I I i l i i i i i  !

I I I I I I I I 1 1 I i i i i 1 1  ! I I I I I i i  ! i i i l i l I i i i i l i i i l i I I ,

I I I i i 1 I I i i I I i i i I  ! I I I I I i l i 1 i i l i i i 1 l 1 I i i I 1 i  ! I i l i i i i I i i i i i I

! i 1 1 1 1 I I I i I i i l 1 i i I I I I i I I I I I I I I I I I i l 1 I I i l i l i i I  ;

1 I i i l i i I i i i 1 1 I I I I I I I I I f i

2 r: rorced 2,,,,,,, g ,,,,, e ,,,1 ,i, c,_t,,, ,,,,

S: scheduled Jr-Equipment railure (Ezp1 min) lei for Preparatice of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for I.acensee i

) C-Befueling 3-Arztomatic Scram. Event PepertitJ2) File (R.1 REG-IHtegulatory Bestriction 4-other (Explaint 0161)

E-operator Training & I,icense Examination r e tnistrative Exhibat I -Same Source G-operational Error (Explain) ,

! s-other (Explaia)