Text
-
Auurnar wca w, o
4(! Irtwr<ie ~s Crnfef I,fkAa, PoaOut>Kx10?,
[D sfscr A.:it, ri a : 01 t e 3, s,,c m # s -,
i
/\\lilbillll[1 POWCf J. D. Woodard
,a r.y..,,.. m August 13, 1991 m.
m rm, p.
Docket No, 50-348 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C.
20555 Joseph M. Farley Nuclear Plant Unit 1 Monthlv Goeratina Data Report Attached is the July 1991 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, b
M Woodard AEJ:edb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell k
g' %
{
f w.l U 'V d 3 l
r'1 ('h3 j { Q(7-2f I((w
, ADO k d;
k[bb q
ron
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS July 1991 The outage due to the reactor trip on June 29 continued.
The unit returned to power operation at 0642 on July 1.
There was one major power reduction during the month of July.
On 7-20-91, power was reduced to approximately 15% in response to "RCP IC Brg Upper / Lower Oil Res to Lv1" alarm.
Reactor coolant pump IC lower oil reservoir level was found to be low and oil was added. The source of the leakage was not identified. The unit. was returned to 100% power at 0613 on 7-21-91.
The following major safety-related maintenance was performed during the month:
1.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
2.
Charging pump 1B was removed from service to repair an oil leak and oil deflector ring.
l l
l
OPERATING DATA REPORT DOCKET NO. 50-348 DATE August 7, 1991 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 OPERATING STATUS Notes
- 1. Unit Name:
Joseph M. Farley - Unit 1
- 1) Cumulative data since
- 2. Reporting Period:
July 1991 12-1-77, date of
- 3. Licensed Thermal Power (MVt):
2,652 commercial operation.
- 4. Nameplate Rating (Gross MVe):
860
- 5. Design Electrical Rating (Net MVe): 829
- 6. Maximum Dependable Capacity (Gross MVe):
856.4
- 7. Maximum Dependable Capacity (Net MVe):
814.0
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Vhich Restricted, If Any (Net MVe):
N/A
- 10. Reasons For Restrictions, If Any' N/A This Month Yr-to-Date Cumulative
- 11. Hours In Repotting Period 744 5087 119,783
- 12. Number Of Hours Reactor Vas Critical 744.0 3352.8 92,307.1
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
- 14. Hours Generator On-Line 737.3 3296.7 90,688.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MVH) 1,919,659.2 8,404,210 232,038,191
- 17. Gross Electrical Energy Generated (MVH) 613,378 2,707,368 74,757,706
- 18. Net Electrical Energy Generated (MVH) 580,902 2,542,338 70,545,870
- 19. Unit Service Factor 99.1 64.8 75.7
- 20. Unit Availability Factor 99.1 64.8 75.7
- 21. Unit Capacity Factor (Using MDC Net) 95.9 61.4 7775-
- 22. Unit Capacity Factor (Using DER Net) 94.2 60.3 71.0
- 23. Unit Forced Outage Rate 1.0 1.8 7.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If_ Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 Form 2/34 1
l
DOCKET NO.
50-348 l
UNIT 1
DATE August 7, 1991 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 MORTH July DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL (MVe-Net)
(MVe-Net) 1 366 17 808 2
806 18 808 3
792 19 807 E
4 807 20 506 5
809 21 791 6
809 22 802 7
810 23 802 8
806 24 805 9
806 25 807 10 808 26 804 11 805 27 804 12 800-28 803 13 801 29 804 l-L 14 805 30 805 15 805 31 807 16 805 INSTRUCTIONS-On this format, list the average daily unit power-level in MVe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
I l
l l
l
%.v -
DOCKET !c.
50-348 tEIT SHUTDOWftS AND PCHER REDUCTIG:ts tNIT ItAME J. M. FARLEY
'MIT 1 j
IATE August 7, 1991 COMPLETED BT D. 5. PUPIY TE12THONE (205)899-5156 REPCRT PEN 111_J0LY i
i l
I I rnoD or iLicrastE I I
i cwsz 5 maarcTzvr I
I i
l I
l manim 1 I swrrIm iEvEur l SrsrEM i cmwam l AcrIm w t ro.
ItaTe i mE l(Hours)
I aEAs = 2 ;,,,7y,,3 l RErwT e l axz' I mtx I
rREvEur REcuRuncE I
5 The unit was l
l005 l910701 l
F l
6.7 l
A l
3 l91-007-00l EA l XFMR lTheoutagefromJune29 continued.
l l
l l
l l
l l
l jreturned to power operation at 0642 on 7-1-91.
l 1
l l
l 1
i I
I I
i 1
lReducedpowertoapproximately15%inresponseto l l
l006 l910720 l
F l
J/A l
B l
N/A l
N/A l As l P
l l
l l
l l
l l
l l"RCP IC Brg Upper / Lower 011 Res to Lv1" alarm.
l l
l l
l l
l l
l l
lReactorcoolantpump1Cloweroilreservoirlevel l l
l l
l l
l l
l l
lvas found to be low and oil was added. Inspection l sw. unit w.s I
l 1
l l
1 I
i l
l jr.v.aied no signs of 1..kag..
j l
l l
l l
l l
l lreturnedto100%poweron7-21-91.
l i
t 1
I I
I I
I I
I i
i l
I i
l i
I I
I I
I 1
1 I
1 1
I I
I I
I 1
I I
I I
I I
I i
i i
I I
I I
I i
I I
I i
I I
I i
l i
I I
I I
I l
i I
l i
l i
l I
I I
I I
I I
I I
I I
I i
I i
i l
I i
i l
I I
i l
I I
I I
I I
i l
I I
1 l
I i
1 1
I I
i 1
i i
l l
I I
I I
I I
I I
i i
I I
I I
I I
I I
I l
l I
I I
i i
l i
l i
i i
i I
I I
i i
I i
I Exhibit G-Inctnactions Method:
F: Forced Reason:
for Preparation of Data 1-Manual s: Scheduled A-Equipment Fa lure (Explain)
Entry Sheets for Licensee 2-Manual Scram.
B-Maintenance or Test 3-Automatic Scram.
Event Reporr(IIR) File (EEUPEG-C-Refueling 44Rher (Explain) 0161) l D-Regulatory Restriction E-Operator Training & License Examination Exhibit I -aame Source F-Adninistrative G-operational Error (Explain)
H-other (Explain)