ML20077P425
| ML20077P425 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 09/07/1983 |
| From: | Mooney J CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20077P418 | List: |
| References | |
| CSC-6878, NUDOCS 8309130378 | |
| Download: ML20077P425 (1) | |
Text
.
~
I NC 1%
Constimers
$$[
J a en pM nEUv W M'=ger P
J ud 4 n9a optar o
- censes. sees=== enrasu mans. Jaakma, w esaos ampsons September 7, 1983 Mr J J Harrison Midland Project Section U'S Naclear Regulatory Consission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERCY CEhTER CWD 7020 RDEDIAL SOILS WORK AUTHORIZATION Pile: 0485.16 UFI: 42805*22*04 Serial: CSC-6878 12*32 We have completed our-review of the documents for the activities listed below.
Based on our review, we concluded that we are ready to start the work:
4L--402550525 - Temporary backfill new pipe (Train A) c 203150165 - Pill SWPS chambers with water to el. 622 (25')
h 402550446 - Excavate existing pipe (Train B) 4 - 402550562 - Temporary backfill new pipe (Train B) 155052320 - Drift from KC3 to 13 feet east of IC4 165052320 - Drift from KCIO to 9 feet vest of KC9 155052032 - Finger drift to KC4 l
.155053315. Excavate Pier KC4 i
155054310 - Install and load Pier KC4 l
,165052032 - Pinger drift to IC9 l
165053315 - Excavate Pier Kc9 165054310 - Install and load Pier XC9 e 207050601 - SWPS-Install four (4) additional piezameters Also, a Eumber of activity authorizations have passed the 90 day expiration limit. In accordance with the Work Authorization Procedure, we request re-authorization of the following activities:
TRAIN B OF $ERVICE WATER FIFK REPLACENEhT 6 -402550550 - Remove existing pipe e-- 402550560 - Install new pipe and expansion coupling c - 402550561 - Hydro test new pipe 402550508 - Perform profiling and ovality check on new piping e
."M lC DL 3