ML20077M811
| ML20077M811 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 01/10/1995 |
| From: | Denton R BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20077M815 | List: |
| References | |
| NUDOCS 9501130179 | |
| Download: ML20077M811 (1) | |
Text
._
W.
R:cE T E.DENTcN Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant Vice President Nuclear Energy 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 586-2200 Ext.4455 Local 410 260-4455 Baltimore January 10,1995
)
i l
U. S. Nuclear Regulatory Commission d
Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit No.1; Docket Nos. 50-317 Calvert Cliffs Simulator Certification Four-Year Report of Uncorrected Performance Test Failures In accordance with 10 CFR 55.45(b)(5)(ii) and 10 CFR 55.45(b)(5)(vi) please find attached the four-year Certification Report of Uncorrected Performance Test Failures for the Baltimore Gas and Electric Company Calvert Cliffs Simulation Facility.
l Since the original certification on January 11,1991, all tests have been completed in accordance with the l
attached audit. Except as noted, all performance test failures have been corrected to date.
l Should you have any questions regarding this matter, we will be pleased to discuss them with you.
l Very truly yours, RED /CDS/bjd Attachment j
cc:
D. A. Bmne, Esquire
[
J. E. Silberg, Esquire I
L. B. Marsh, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R.1. McLean, DNR J. H. Walter, PSC 100014 od
~ 9501130179 950110
'l PDR ADOCK 05000317 R
pgg n
,