____ _-_ _ __ _ _ _ - _ _ _ _ _ _ _ _ _ _ _.

  1. ~'%

\\.....)}

UNITED STATES n5 NUCLEAR REGULATORY COMMISSION waswiwaron, o.c. seeswooi ENTERGY OPERATIONS. INC.

SYSTEM ENERGY RESOURCES. INC.

SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION MISSISSIPPI POWER AND LIGHT COMPANY DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.114 License No. NPF-29 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Entergy Operations, Inc. (the licensee) dated June 17, 1994, as supplemented by letter dated August 17, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I;.

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9501120361 950104 ~

PDR ADOCK 05000416 PDR

2.

Accordingly, the license is amended by changes to paragraph 2.C.(25) of Facility Operating License No. NPF-29 is hereby amended to read as follows:

(25)

Reliability of Diesel-Generators (Sections 8.3.1, 9.6.3 through 9.6.7, SER, SSER #2, SSER #4, SSER #6)

(a)

Prior to startup following the first refueling outage, a heavy duty turbocharger gear drive assembly shall be installed on all EMD diesel-generators.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION J

Paul W. O'Connor, Senior Project Director Project Directorate IV-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the License Date of Issuance: January 4,1995

ATTACHMENT TO LICENSE M1ENDMENT NO. 114_

FACILITY OPERATING L1[ENSE NO. NPF-29 DOCKE ?!a_ 50-416 Replace the following page of the License with the attached page and remove to Facility Operating License No. NPF-27. The revised page is identified by amendment number and contains a vertical line indicating the area of change.

REMOVE INSERT 10 10 I

i w

w w

r

(24) Interolant Communication Systems (Section 9.6.1.2, SER, SSER #2, SSER #4, SSER #5)

Tests of the communication systems used to mitigate the consequences

{

of an event and attain a safe plant shutdown shall be completed during preoperational and startup tests. An evaluation of the test results shall be provided for NRC review within 90 days after test ~

completion. Any system modifications found necessary as a result of NRC review shall be completed prior to startup following the first

)

refueling outage.

(25) Reliability of Diesel-Generators (Sections 8.3.1, 9.6.3 through 4

9.6.7, SER, SSER #2, SSER #4, SSER #6)

(a) Prior to startup following the first refueling outage, a heavy.

duty turbocharger gear drive assembly shall be installed on all EMD diesel-generators.

l (26) Turbine Disc Intearity (Section 10.2.1, SER, SSER #1) i E01 shall ultrasonically inspect the bores and keyways of the low pressure turbine discs for indications of cracking prior to exceeding 50,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of ope-ation. All unacceptable indications and their dispositions shall Le reorted prior to startup for the next cycle of operation. These inspections shall continue on a 50,000 he's interval until the potetial for i.:frbine disc crackh,9 'as been n

assessed and an acceptable alternate insi:::. tion schedule has been established.

(27) Circulatina Water System (Section 10.4.5, SER)

E01 shal: not fill the Unit 2 circulating water system (including the

[

natural draft cooling tower basin) until Unit I flooding concerns related to this system are resolved to the satisfaction of the NRC staff.

(28) Advisor to the Vice President MP&L shall have on its nuclear operations staff, one or more-corporate management officials or advisors (who may be either permanent employees or contracted consultants) who have substantial commercial nuclear power plant operating management experience and who will advise on all decisions affecting safe operation of the plant. This requirement shall be in effect until the plant has accumulated at least 6 months at power levels above 90 percent of full power.

l l

10 Amendment No. 65r114 l

.. -. -