[,#E,g l LONG ISLAND LIGHTING COM PANY
~ ~ - - - - -
17 5 EAST OLD COUNTRY ROAD H ICK SVI LLE, NEW YORF 11801 MILLARD S. POLLOCM vsCE PRESIDENT
- NUCLEAR August 8, 1983 SNRC-949 Mr. Richard W.
Starostecki, Director Division of Project & Resident Programs U.S.
Nuclear Regulatory Commission - Region I 631 Park Avenue King of Prussia, PA 19406 NRC Inspection Report 50-322/83-17 Jet Pump Beams - Item 322/83-17-01 Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322
Dear Mr. Starostecki:
Your letter dated July 8, 1983, transmitted the above referenced Inspection Report which contained a Notice of Deviation citing l
one item of noncompliance.
As of June 21, 1983, no non-destruc-tive tests were performed on the Jet Pump Holddown Beams.
Corrected Steps Taken and Results Achieved Subsequent to the finding, LILCO has contracted with General Electric Apparatus & Engineering Services Operations to perform an ultrasonic (UT) baseline examination of all jet pump holddown l
beams installed in the Shoreham Reactor Pressure Vessel.
The UT examination has not been conducted as of this date.
However, the expected results to be achieved will be to ultrasonically " map" each of the holddown beams and to establish a baseline for reference and comparison during future in-service inspections.
It should be noted that the jet pump holddown beams had pre-viously been detensioned and subsequently retensioned.
These UT examinations will, therefore, be performed on the beams in their present retensioned state.
8309120312 830906 PDR ADOCK 05000322 G
August 8, 1983 SNRC-949 Page Two Corrective Steps Taken to Preclude Recurrence The cause for this item of noncompliance was explained in LILCO letter SNRC-907 dated June 23, 1983.
Licensing commitments are recorded and scheduled on a Commitment Action Requirements list and the Site-controlled Master Punch List.
In this one instance, for reasons which were delineated in our June 23, 1983 letter, this item had not been scheduled.
Date of Full Compliance The ultrasonic baseline examination of all jet pump holddown beams will be completed and the results analyzed by August 31, 1983.
Very truly yours,
[6. [
i M.
S. Pollock Vice President - Nuclear Shoreham Nuclear Power Station JPM:jm cc:
J.
Higgins R. Caruso All Parties in Attachment 1
ATTACHMENT 1 Lawrence Brenner, Esq.
Herbert H. Brown, Esq.
Administrative Judge Lawrence Coe Lanpher, Esq.
Atomic Safety and Licensing Karla J.
Letsche, Esq.
Board Panel Kirkpatrick, Lockhart, Hill U.S. Nuclear Regulatory Commission Christoper & Phillips Washington, D.C.
20555 8th Floor 1900 M Street, N.W.
Washington, D.C.
20036 Dr. Peter A. Morris Administrative Judge Atomic Safety and Licensing Mr. Marc W. Goldsmith
' Board Panel Energy Research Group U.S. Nuclear Regulatory Commission 4001 Totten Pond Road Washington, D.C.
20555 Waltham, Massachusetts 02154 Dr. George A. Fergus6n MHB Technical Associates School of Engineering 1723 Hamilton Avenue Howard University Suite K 2300 Fifth Street San Jose, California 95125 Washington, D.
C.
20059 t
Stephen B.
Latham, Esq.
Twomey, Latham &,Shea Daniel F.
Brown, Esq.
33 West Second Street Attorney P.O.
Box 398 Atomic Safety and Licensing Riverhead, New York 11901
' Board Panel U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Ralph Shapiro, Esq.
Cammer and Shapiro, P.C.
9 East 40th Street Bernard M.
Bordenick, Esq.
New York, New York 10016 David A.
Repka, Esq.
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Matthew J.
Kelly, Esq.
State of New York Department of Public Service James Dougherty Three Empire State Plaza 3045 Porter Street Albany, New York 12223 Washington, D.C.