ML20077M217
| ML20077M217 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 07/31/1991 |
| From: | Parker T, Paustian H NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9108130232 | |
| Download: ML20077M217 (5) | |
Text
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _
Northem States Power Compviy 414 Nicollet Mall Minneanahs, Minnesota 55401 1927 T elephone (612) 330 $$00 August 7, 1991 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatcry Commission Attn: Document Control Desk Wshington, DC 20555 MONTICELID NUCLEAR GENERATING PIANT Docket No. 50 263 Licence No. DPR 22 Monthly Operating Report July 1991 Attached a the nnthly Operating Report for July,1991 for tha Manticello Nuclear ent a ng 'lant,
/Tl mas M
'a er l
Manager Nuclear Support Service TMP/mk1 C:
Director, Office of Resource Manac,ement Regional Administrator III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman l
Attachment l
l l
),
9108130232 910731
)
PDR ADOCK 050002g..,
R PDR
OPERATING DATA REPORT s
DOCKET NO.
50-263 DATE 8-1-91 COMPLETED BY 11. 11. Paustian TELEPilONE 612/295-5151 OPERATING STATUS Thotes 1
- 1. Unit Name :
Monticello 1
1
- 2. Roporting period:
JULY l
- 3. Licensed Thermal Power (MWt):
1670 t
t
- 4. Nameplate Rating (Gross MWe):
569 1
1
'5. D3 sign Electrical Rating (Net MWe):
545.4 1
1
- 6. Maximum Dependable Capacity (Gross MWe):
564 1
1
- 7. Maximum Dependable Capacity (Not MWe):
~~536 I
._ t
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To which Restricted, If Any (Net MWe):
N/A
- 10. Reasons for Restrictions, If Any: __N/A T !! I S M O N T !!
YR.-TO-DATE CUMULATIVE
- 11. Ilours In Reporting Period 744 5087 176064
- 13. Reactor Reserve Shutdown flours 0.0 0.0
139778.5
- 12. Number Of Hours Reactor Was Critical 7T4.0 3435.7 940.7
- 14. Hours Generator On-Line 744.0 3367.2
~~I77117.7
-~
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 1234426 5172046
~209494980
- 17. Gross Electrical Energy Generated (MWil) ~ 411032
~ 1727072 70855632
- 18. Het Electrical Energy Generated (MWH)
~~391182
-~1644272
~~67751519
~~
- 19. Unit Service Factor
~~100.0%
~~
66.2%
77.9%
- 20. Unit Availability ractor
~ 100.0%
66.2%
77.9%
- 21. Unit Capacity Factor (Using MDC Net)
~~ 98.1%
60.3%
~~~~ 71.8%
- 22. Unit Capacity ractor (Using DER Net)
~~ 96.4%
59.3%
70.6%
- 22. Unit Forced Outage Rate 0.0%
5.1%
4.0%
~~
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)-
__None
- 25. If Shut Down At End Of Report Period,. Estimated Date Of Startup N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
NARRATIVE
SUMMARY
OF OPERATIliG EXPERfE!dCE
+
DOCKET NO.
50-263 DATE 0- 1-91 COMPLETED BY 11. 11. Paustian~
TELEPilONE 612/295-5151 MONTH JULY l
l 7-1-91 to Power operation.
7-28-91 Power reduction to 70% of rated power to calibrate 7-28-91 Electro-Chemical Probe for use with !!ydrogen Water Chemistry System.
j 7-20-91 to Power operation.
l 7-31-91 i
t i
l l
l.
l i
Note Power operation defined as essentially 100% of j
rated power except for weekend load drops for specified surveillance testing.
l l
?
L
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UllIT Monticello ~"
DATE 8-1-91 COMPLETED SY 11. 11. Paustian TELEPl!ONE 612/295-5151 MONT!!
JULY j
DAY AVERAGE DAILY POWER-LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1-533' 17 527 2
526 18 529 3
530 19 526 4
533 20 525 5
-530 21 521 1
6 528 22 523 7
534 23 529
-8 504 24 526 9
529 25 530 10 532 26 529 11 529 27 532 12
- _526, 28 460 13 534 29-529-14-530 30 528 15 526 31 535 16 526 INSTRUCTIONS-i.
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole. megawatt.
~
j._
i
Do m No. 50-263 UIIT SHUITXMIS AND POWER REDUCTI0 tis GIIT NAME -~Monticello
~
DATS W-01-91 N:TED BT -~H. H. Paustian TEI.E*rTot2 _612/295-5151--
REPORT mot.Td July Cause & Corrective No.
Date Type Duration Reason Method LER S* stem Comp.
Action to Prevent Recurrence l
(1)
(hours)
(2) of No.
e Code Shutdown (4)
(31 (3)
Reduced pmr to 70% to calibrate Electro-Chemical 6
07-28-91 5
0.0 B
4 ruA TJi DET Probe for Hydrogen Vater Chemistry System.
1 i
4 3
Draft IEEE Standard 1
2 Method:
Reason:
1-Manual 805-1984(F805-D5)
F: Forced S: Scheduled A-Equipment F:tilure (Explain) 2-Manual Scram B-Maintenance or Test 3-Automatic Scras 5
C-Refueling 4-Other (Explain)
IEEE Standard 803A-1933 D-Regulator Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
_