ML20077M116
| ML20077M116 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/24/1983 |
| From: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20077M119 | List: |
| References | |
| REF-SSINS-6820 IEB-83-02, IEB-83-2, NUDOCS 8309120181 | |
| Download: ML20077M116 (2) | |
Text
..
- 3..
v 1
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 i
PHILADELPHIA. PA 19101 SHIELDS L. DALTROFF ELacTmic Pn o c ton I
August 24, 1983 Docket No. 50-277 50-278 Dr. Thomas E. Murley, Administrator Office of Inspection and Enforcement U.S. Nuclear Regalatory Commission 631 Park Avenue King of Prussia, PA 19046
Subject:
Additional Limiting Conditions for Operation dealing with Reactor Coolant Leakage for Philadelphia Electric
-Company's Peach Bottom Station t
Reference:
Letter to Dr. T.E. Murley, from S. L. Daltroff, dated August 9, 1983; Response to I.E.Bulletin 83-02 for Peach Bottom Unit 3
Dear Dr. Murley:
i As a result of a telephone conversaton with Peach
- Bottom's NRC Project Manager, attached are surveillance requirements and limiting conditions for operation for Peach Bottom Unit 2 and Unit 3.
We commit to implement these conditions for operation until such time as the Technical Specifications are amended.- These surveillance requirements and limiting conditions for operation will supersede the ones transmitted to you in the reference letter.
In addition, we commit to submit our plans for inspection, corrective actions and/or any modifications, including replacement of the recirculation and/or other reactor cooling pressure boundary piping systems for the next Unit 3
-refueling outage.
These plans will be submitted to the NRC for review at least -three months before the start of the next refueling outage.
\\\\'
B309120181 830824
{Ig PDR ADOCK 05000277
{
C PM
.. - =..._.
.o Dr. Thomas E. Murley Page 2 Should you have any questions or require additional information, please do not hesitate to contact us.
Very truly yours,
'M
'I Attachment cc: A. R. Blough, Site Inpsector J.F. Stolz (NRC)
Branch 4 Chief Operating Reactors Division of Licensing NRC Document Control Desk
'1
~. - -....
...-..--,,--,w,.
.