ML20077L197

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Ei 1300.02 Re Unusual Event,Ei 1300.03 Re Alert & Ei 1300.04 Re Site Emergency
ML20077L197
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/07/1983
From:
TOLEDO EDISON CO.
To:
NRC
Shared Package
ML20077L195 List:
References
NUDOCS 8308080570
Download: ML20077L197 (1)


Text

.

A

~

+3ao DAVIS-BESSE REVISION COVER SHEET Julv 7, 1983 O q (o DATE TO:

FROM:

EMERGEN LANNING & PREPAREDNESS SUPV.

SUBJECT:

Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual Changes This letter transmits additions and revisions to the Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual. Control Copy d Instructions for the material are as follows:

INSERT REMOVE AND RETURN (Distributed 6/21/83)

(Corrected Copy) e EI 1300.02.4 - Pg. I thru 7 EI 1300.02.4 - Pg 1 thru 7

(

Pg. 8 thru' 12 - Unusual Event Checklist -

Pg. 8 thru 12 EI 1300.03.4 - Pg. I thru 8 EI 1300.03.4 - Pg. I thru 8 Pg. 9 thru 13 - Alert Checklist -

Pg. 9 thru 13 EI 1300.04.4 - Pg. I thru 8 EI 1300.04.4 - Pg. 1 thru 8 Pg. 9 thru 13 - Site Energency Checklist -

Pg. 9 thru 13 EI 1300.05.4 - Pg. I thru 9 EI 1300.05.4 - Pg. I thru 9 l

Pg. 10 thru 14 - General Energency Checklist - Pg. 10 thru 14 l

Date Revision Entered Addressee Signature STOP #3050 REIG N TO THE OFFICE MANAGER l

)(dof 8308080570 830726 PDR ADOCK 05000346 fj O "B"

-__