ML20077K260

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-30,removing Thimble Plugging Devices During Refueling 4 & Use of COLR
ML20077K260
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/30/1991
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20077K262 List:
References
ULNRC-2450, NUDOCS 9108070163
Download: ML20077K260 (3)


Text

igas cweau nw te Pv:t O!!a e &a 119

+

M tour Munari L?166 e

nus.cuso Gy July 30, 1991 oonaldr schnett E use n u.E3 ATTN:

r" U.S. Nuclear Regulatory Commission "d*

?

Doc' aent Control Desk Mail Station P1-137

)

Washington, D.C.

.20555 ULNRC-2450 Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT MISCELIANEOUS TECHNICAL, SPECIFICATION BASES CHANGES

References:

1.

ULNRC-2274 dated 8-23-90, Thimble Plug Removal 2.

OL Amendment No. 58 dated 11-1-90, Core Operating Limits Report (COLR) 3.

NRC SER dated 4-10-85, Conformance to Regulatory Guido 1.97 Revision 2 4.

OL Amendment No. 13 dated 3-4-86, Peak Containment Internal Pressure 5.

OL Amendment No. 35 dated 3-30-88, Callaway Plant Uprating Union Electric Company herewith transmits several miscellaneous c"nnges to the Callaway Technical Specification Bases which are taken from the above references.

Reference 1 transmitted several changes related to the removal of some of the thimble plugging devices during Refuel 4.

That letter took credit for an all VANTAGE 5 core and the absence of a. transition core DNBR penalty in accommodating the attendant increase in core bypass flow.

Subsequent to the submittal of Reference 1, Reference 2 was issued and revised the Technical Specifications to allow the use of a COLR.

The attachment contains changes to Bases pages B 2-1, B 2-2,.B 3/4 2-4, and B 3/4 2-5 which are associated with References 1 and 2.

Pages.B 2-1 and B 2-2 are revised to delete statements regarding OFA fuel'and its DNB correlation (WRB-1), OFA design and safety analysis-DNBR limits, and the OFA F-delta H limit.

F-delta H equations on page B 2-2 are replaced.

by a reference to the COLR.

Given the issuance of Reference 2, the changes to page B 3/4 2-1 submitted in Reference 1 are no longer needed; however, the changes to pages B 3/4 2-4 and B 3/4 2-5 with its Insert A from Reference 1 are still needed and are enclosed herein.

' ' " ^ "f108070163 910730 MO Ud PDR ADOCK 05000483 V

. The change to Bases page B 3/4 3-4 is taken from Reference 3.

Callaway's conformance to Regulatory Guide 1.97, Revision 2 is clarified in FSAR Appendix 7A.

The change to Bases page B 3/4 6-2 is taken from Reference 4.

The peak containment pressure following a steam line break is 48.1 psig, as noted in Reference 4 and in FSAR Tables 3.11(B)-2 and 6.2.1-2.

The change to Bases page B 3/4 7-1 is taken from Reference 5.

FSAR Tables 5.1-1 and 10.3-2 were revised to reflect the uprated secondary side steam flow of 15.92 E06 lbs/hr at the licensing basis 10%

steam generator tube plugging.

Further, the main steam safety valve capacities listed on FSAR Table 10.3 add up to a four loop total of 18.23 E06 lbs/hr, rather than 18.28 E06 lbs/hr.

This typographical error has existed since the original issuance of the Technical Specification Bases; no changes to the safety valvo discharge capacities have been made since original plant licensing.

If you have any questions on the attached Bases changes, please contact us.

Note that, as stated above, the changes requested in Reference 1 are superseded by the attachment.

Ver truly you s, onald F.

Schnell GGY/kaa Attachment

4 cc :.

T.

A.

Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge

.2300 N. Street, N.W.

Washington, D.C.

20037 Dr. J.

O.

Cermak CFA, Inc.

18225-A Flower Hill Way Gaithersburg, MD 20879-5334 R.

C.

Knop Chief, Reactor Project Branch 1 U.S. Nuclear' Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137-Bruce Bartlett callaway Resident Office U.S. Nuclear Regulatory Co=rission RR#1 Steedman, Missouri 65077 M.

D.

Lynch (2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD 20852 Manager, Electric Department Missouri Public Service Commission P.O.

Box 360 Jefferson City, MO 65102 Ron Kucera Department of Natural Rosources P.O.

Box 176 Jefferson City, MO 65102 l

L L

l

= -.. -.

.-