Text
_,
January 5, 1995 l
Mr. Roger 0. Anderson, Director
' Licensing and Management Issues Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 l
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT NOS. 1 AND 2 -
ISSUANCE OF AMENDMENTS.RE: EMERGENCY DIESEL GENERATOR TESTING REQUIREMENTS (TAC NOS. M90564 AND M90565) i
Dear Mr. Anderson:
The Commission has issued the enclosed Amendment No.113 to Facility Operating License No. DPR-42 and Amendment No.106 to the. Facility Operating License No.
DPR-60 for the Prairie Island Nuclear Generating Plant, Unit Nos. I and 2.
The amendments consist of changes to the. Technical Specifications in response to your application dated October 3,1994, as supplemented November 30, 1994, The amendments revise Prairie Island Nuclear Generating Plant Technical Specification 4.5, " Periodic Testing of Emergency Power Systems."
Specifically, the amendments modify the emergency diesel generator (EDG) 24-hour load test requirements to provide an indicated load range of 103-110 percent of the continuous rating. The amendments also rephrase various EDG test requirements to provide clarity and delete the requirement to verify that the auto-connected loads for the Unit I and Unit 2 EDGs do not exceed 3,000 kilowatts and 5,100 kilowatts, respectively.
A copy of our related Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's biweekly Federal Reaister notice.
Si re y, Sheri R. Peterson, Proj ct Manager Project Directorate 111-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation
Enclosures:
1.
Amondment No. 113 to DPR-42 2.
Amendment No. 106 to DPR-60 3.
Safety Evaluation cc w/ encl:
See next page DOCUMENT NAME: G:\\WPDOCS\\ PRAIRIE \\PI90564.AMD
- See Previous Concurrence i
To receive e copy of this document, indicate in the box:
'C' = Copy without attachment / enclosure "E" = Copy with attachment / enclosure
'N' = No copy 0FFICE LA:PD31
\\
l ff PM:PD31 LOGC*
l D:PD31
,,o l
)
NAME CJamerson ('k SPeterson (W P 'CABarth JHanno h DATE 1/ 4 /95
/\\
1/(/95 12/30/94 1/ f/95'
)
v 0FFICIAL RECORD COPY 9501100244 950105 PDR ADOCK 05000282 P
PDR j
p>* *th p
t UNITED STATES g
j NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. ace 664001
%.....p January 5,1995 Mr. Roger 0. Anderson, Director i
Licensing and Management Issues Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT NOS. 1 AND 2 -
ISSUANCE OF AMENDMENTS RE: EMERGENCY DIESEL GENERATOR TESTING REQUIREMENTS (TAC NOS. M90564 AND M90565)
Dear Mr. Anderson:
The Commission has issued the enclosed Amendment No.113 to Facility Operating License No. DPR-42 and Amendment No. 106 to the Facility Operating License No.
DPR-60 for the Prairie Island Nuclear Generating Plant, Unit Nos. I and 2.
The amendments consist of changes to the Technical Specifications in response to your application dated October 3,1994, as supplemented November 30, 1994, The amendments revise Prairie Island Nuclear Generating Plant Technical Specification 4.6, " Periodic Testing of Emergency Power Systems."
Specifically, the amendments modify the emergency diesel generator (EDG) 24-hour load test requirements to provide an indicated load range of 103-110 percent of the continuous rating. The amendments also rephrase various EDG test requirements to provide clarity and delete the requirement to verify that the auto-connected loads for the Unit I and Unit 2 EDGs do not exceed 3,000 kilowatts and 5,100 kilowatts, respectively.
A copy of our related Safety Evaluation is also enclosed.
The notice of issuance will be included in the Commission's biweekly Federal Reaister notice.
Sincerely, heri R. Peterson, Project Manager Project Directorate III-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosures:
1.
Amendment No.113 to DPR-42 2.
Amendment No.106 to DPR-60 3.
Safety Evaluation cc w/ encl: See next page j
EC >:
p FT[T..
"~
09003/
WCU
DATED:
January 5',
1995 AMENDMENT NO.113 TO FACILITY OPERATING LICENSE NO. DPR-42-PRAIRIE ISLAND - UNIT 1 AMENDMENT NO.106 TO FACILITY OPERATING LICENSE NO. DPR-60-PRAIRIE ISLAND - UNIT 2 18ecket3 File?
)
w PUBLIC
'PDIII-1 Reading J. Roe i
J. Hannon C. Jamerson S. Peterson (2) l C. Berlinger M. Pratt D. Thatcher OGC G. Hill, IRM (4)
C. Grimes, D0PS/0TSB, 0-11F23 ACRS (4)
OPA i
OC/LFDCB i
W. Kropp, RIII SEDB cc:
Plant Service list i
I 1
r Mr. Roger 0. Anderson, Director Prairie Island Nuclear Generating Northern States Power Company Plant P
cc:
J. E. Silberg, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.
Washington DC 20037 Site General Manager Prairie Island Nuclear Generating Plant Northern States Power Company 1717 Wakonade Drive East Welch, Minnesota 55089 y
Adonis A. Neblett Assistant Attorney General Office of Attorney General 455 Minnesota Street Suite 900 St. Paul, Minnesota 55101-2127 U.S. Nuclear Regulatory Commission Resident Inspector Office 1719 Wakonade Drive East Welch, Minnesota 55089-9642 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Mr. Jeff Cole, Auditor / Treasurer Goodhue County Courthouse Box 408 Red Wing, Minnesota 55066-0408 Kris Sanda, Commissioner Department of Public Service 121 Seventh Place East i
Suite 200 St. Paul, Minnesota 55101-2145 Site Licensing Prairie Island Nuclear Generating Plant Northern States Power Company 1717 Wakonade Drive East Welch, Minnesota 55089 Nemew!M4
.