|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R6481998-07-15015 July 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G7011998-05-31031 May 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at Prairie Island Nuclear Generating Plant,Unit 2 ML20248M0561998-05-31031 May 1998 Rev 5 to CEN-620-NP, Series 44 & 51 Design SG Tube Repair Using Tube Rerolling Technique ML20247E2671998-05-0505 May 1998 Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20217M6901998-04-29029 April 1998 Safety Evaluation Accepting Methodology for Relocation of Reactor Coolant Sys P/T Limit Curves & LTOP Sys Limits Proposed by NSP for Pingp,Units 1 & 2 ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216H0341998-03-31031 March 1998 Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept ML20217D2041998-03-13013 March 1998 Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn ML20236P9801998-03-12012 March 1998 Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys ML20248L3931998-03-10010 March 1998 ISI Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 971018-971212 Cycle 18,960303-971212 ML20216D0911998-03-0606 March 1998 Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept 1999-09-30
[Table view] |
Text
_ _ _ _ _ _
Northem States Power Company Prairie island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 l
1 January 5, 1995 Prairie Island Technical Specificatiens {
Section 6.7.A.3 I
US Nuclear Regulatory Commission j Attn: Document Control Desk l Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Monthly Operating Report December. 1994 Attached is the Monthly Operating Report for December 1994 for the Prairie Island Generating Plant.
/l' c l it t Roger O Anderson l
Director l Licensing and Management Issues ng, p , , ; , ,n. , . . y. , , , . - vw~.
c: fDirectorn Office of, Resource., Management m J Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda r
Attachment 9501100184 941230 / g i PDR ADOCK 05000282 i R PDR
s
' NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE l
DOCKET NO. 50-282 t UNIT PRAIRIE ISLAND NO.1 DATE JANUARY 3, 1995 ;
COMPLETED BY DALE DUGSTAD ,
TELEPHONE 612-388-1121-4376 MONTH: DECEMBER 1994
{
The Unit was base loaded this month, there were no puwer reductions or shutdowns.
t 1
CURRENT CONTINUOUS OPERATING RUN OF 142 DAYS.
s
, i
. r AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-282 r UNIT PRAIRIE ISLAND NO.1 DATE JANUARY 3, 1995 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 MONTH: DECEMBER 1994 DAY AVERAGE DAILY POWER LEVEL (MWE-NET) 1 532 2 532 3 532 :
4 532 5 532 l 6 532 7 531 8 533 ;
9 531 10 533 '
11 535 12 528 13 531 14 531 15 532 16 532 17 533 18 532 19 532 20 532 21 533 22 534 23 531 24 532 25 531 26 532 27 533 28 532 1 29 534 30 531 1 31 532 l AVERAGE LOADS ABOVE 513 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER l
i
f i
l' OPERATING DATA REPORT DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE JANUARY 3, 1995 ,
COMPLETED BY DALE DUGSTAD -
TELEPHONE 612-388-1121-4376 I
OPERATING STATUS
- 1. UNIT NAME: PRAIRIE ISLAND NO. 1 ,
- 2. REPORTING PERIOD: DECEMBER 1994
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE): 593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 545
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 513 i
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT GIVE REASON: NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 8760 184464
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7292.4 157599.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 5571.1
- 14. HOURS GENERATOR ON-LINE 744.0 7259.1 155941.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
- 16. CROSS THERMAL ENERGY GENERATED (MWH) 1225396 11695491 246908639
- 17. CROSS ELECTRICAL ENERGY GENERATED (MWH) 415760 3925580 81349650
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 395846 3715483 76455267
- 19. UNIT SERVICE FACTOR 100.0 82.9 84.5
- 20. UNIT AVAILABILITY FACTOR 100.0 82.9 84.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.7 82.7 82.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.4 80.0 78.2
- 23. UNIT FORCED OUTAGE RATE 0.0 2.2 5.0
- 24. FORCED OUTAGE HOURS 0.0 165.3 8125.9
- 25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, CATE & DURATION OF EACH):
N/A i
- 26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: N/A i
l
4 UNIT SHUTDOWN 3 AND PO2ER REDUCTION t
. DOCKET NO 50-282 UNIT NAME PRAIRIE ISLAND NO. 1 DATE JANUARY 3, 1995 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 MONTH DECEMBER 1994 DATE TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT YY/MM/DD 000.0 94/12/00 None.
4 b
F f
i TYPE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD +
S-5CHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984(P805-D5)
C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING & 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATIONAL ERROR H-OTHER
'E e-
' NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-306 -
UNIT PRAIRIE ISLAND NO.2 DATE JANUARY 3, 1995 ;
COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 l
MONTH: DECEMBER 1994 i
The Unit was base loaded this month, there was one power reduction and no shutdowns.
The reduction was for turbine valves testing and condenser waterbox cleaning. This occurred on the loth of December.
I l
~
4 6
CURRENT CONTINUOUS OPERATING RUN OF 163 DAYS. l i
l l
l l
l l
4
, =
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-306 UNIT PRAIRIE ISLAND No.2 DATE JANUARY 3, 1995 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 MONTH: DECEMBER 1994 DAY AVERAGE DAILY POWER LEVEL (MWE-NET) 1 533 2 531 3 533 4 531 5 534 6 533 7 532 8 533 9 533 10 260 11 531 l
12 531 13 531 532 14 l 15 532 l 16 531 17 532 18 531 19 532 20 532 21 532 22 534 23 531 24 531 25 531 26 531 27 531 28 531 29 531 30 533 31 531 AVERAGE LOADS ABOVE 512 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
'4 r
OPERATING DATA REPORT
,j DOCKET NO. 50-306 !
UNIT PRAIRIE ISLAND NO.2 :
DATE JANUARY 3, 1995 !
COMPLETED BY DALE DUGSTAD i TELEPHONE 612-388-1121-4376 l
OPERATING STATUS j
- 1. UNIT NAME: PRAIRIE ISLAND NO. 2 !
- 2. REPORTING PERIOD: DECEMBER 1994 !
-3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE): 593 .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530 i
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 544 +
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512 _ [
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT GIVE REASON: NONE t
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE '
.10. REASONS FOR RESTRICTIONS, IF ANY: NONE THIS MONTH YR-TO-DATE CUMULATIVE ;
- 11. HOURS IN REPORTING PERIOD 744 8760 175582 '
4
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL- 744.0 8743.2 155110.2 s
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1 !
- 14. HOURS GENERATOR ON-LINE 744.0 8734.3 153722.7 ;
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
- 16. CROSS THERMAL ENERGY GENERATED (MWH) 1206313 14324583 244280222
- 17. CROSS ELECTRICAL ENERGY GENERATED (NWR) 408690 4806870 79712040 -
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 389070 4552960 75357496
- 19. UNIT SERVICE FACTOR 100.0 99.7 '
87.6
- 20. UNIT AVAILABILITY FACTOR 100.0 99.7 87.6
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.1 101.5 85.7 ;
- 22. UNIT. CAPACITY FACTOR (USING DER NET) 98.7 98.1 81.0 l
- 23. UNIT FORCED OUTAGE RATE 0.0 0.2 2.5 i
- 24. FORCED OUTAGE HOURS 0.0 20.7 3984.7
- 25. SHUTDOWNS' SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH):
i f
REFUELING OUTAGE IN MAY 1995.
l
- 26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: N/A l f
t t
UNIT SHUTDOWNS AND POWER REDUCTION I
DOCKET NO 50-306 UNIT NAME PitAIRIE ISLAND NO. 2 !
DATE JANUARY 3, 1995 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 .
MONTH: DECEMBER 1994 ,
P DATE TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT YY/MM/DD 000.0 94/12/10 S 0.0 B 5 N/A Turbine valve testing & condenser waterbox cleaning. ,
P F
-4 TYPE REASON METHOD SYSTEM' CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-:!CHED B-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984(P805-D5)
C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING & 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATIONAL ERROR H-OTHER