Second Interim Rept Re Significant Const Deficiency 75 Concerning Station Battery Equalizing Charge Voltage Exceeding Coil Ratings.Initially Reported on 830411. Engineering Evaluation in Progress.Final Rept by 831021
ML20077J479
Person / Time
Site: Waterford 
Issue date: 07/29/1983
From: Drummond F
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I83-0253, W3I83-253, NUDOCS 8308160441
Download: ML20077J479 (1)


Text

f' LOUISIANA 142 DELARONDE STREET POWER & LIGHT P O BOX 6008

  • NEW ORLEANS, LOUISIANA 70174. (504) 366-2345 UTiON dysS[0 July 29, 1983 W3183-0253 Q-3-A35.07.75

% @p@$

I Mr. John T. Collins, Regional Administrator, Region IV I

U. S. Nuclear Regulatory Commission MM - 0 I%3 611 Ryan Plaza Drive, Suite 1000 1

Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 suW ~"

~

Docket No. 50-382 Significant Construction Deficiency No. 75

" Station Battery Equalizing Charge Voltage Exceeds Coil Ratings" Second Interim Report

REFERENCE:

LP&L Ictter W3I83-0118 dated April 11, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC no later than July 29, 1983.

An extensive engineering evaluation is presently underway and is scheduled for completion in late September, 1983.

A Final Report will therefore be submitted to the USNRC by October 21, 1983.

Very truly rs, WW F.

. Drummond Project Support bbnager - Nuclear FJD/WAC/ MAL:keh cc:

1) Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuc1 car Regulatory Commission Washington, D. C.

20555

2) Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 8308160441 830729 PDR ADOCK 05000382

_L

- d-7 S

PDR s