's M__
TIIE CINCINNATI GAS & ELECTRIC COMI%NY en -
CINCINN AT4. OHIO 45201 August 4, 1983 LOZ-83-0097 J. WILLIAM S, JR st wson V4CE PRES
- DENT NUCLE Am OPERAflONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:
Mr. J.G.
Keppler Regional Administrator Gentlemen:
RE:
WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50. 55 (e), ITEM M-65, SEISMIC CLEARANCE DEFICIENCIES W.O.
57300, JOB E-5590, FILE NO. 956C, M-65 This letter constitutes an interim report concerning the subject condition initially reported to the Commission on October 29, 1982 as a potentially reportable deficiency under the requirements of 10CFR50.55 (e).
Based on a telephone conversation between Mr. R. F. Warnick (NRC) and D. J.
S tephenson (CG&E) on August 2, 1983, CG&E was granted an extension for submittal of this interim report until Augtet 5, 1983.
CG&E has reviewed the subject condition and has determined that it represents a reportable deficiency under 10CFR50.55 (e).
CG&E is currently implementing the corrective actions given in our previous report, QA-2124, dated November 19, 1982.
Design Documents Changes (DDC's) Numbers SLM-933 and SLM-963 have been issued to revise and clarify Sargent & Lundy Design Specifications H-2173, H-2256, and H-2298.
Procedures, including MIP-13, are being revised as applicable by all Zimmer contractors to ensure that the revised Design Specifications are incorporated in the procedures.
New installations will be curtailed until an adequate procedural program is established to ensure proper installation.
OPP 3.8 has been issued to describe and control the seismic Interaction Clearance Program.
CG&E provided copies of the implementing procedures to the NRC for review and comment prior to beginning the walkdown.
The entire Seismic Interaction Clearance Program is expected to be completed by June 30, 1984.
0300160301 830804 gyQ O Okbg PDR ADOCK 05000358 S
PDR 1
T$$
AD-
/
v.
i l
Mr. J.G.
Keppler Regional Administrator August'4, 1983 LOZ-83-0097 Page 2 Modifications to resolve deficiencies found during this walkdown will be performed upon the relaxation or lifting of the NRC November 12, 1982 " Order to Show Cause and Order Immediately Suspending Construction" for this work.
A follow-up report will be submitted by July 15, 1984.
We trust the above will be found acceptable as an interim report under 1GCFR50.55 (e).
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY
>' 6t- - - [
3 By
. WILLIAMS, /R.
SENIOR VICE PRESIDENT DJS/ JAM /sfr cc:
NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector ATTN:
W.F. Christianson NRC Zimmer Project Inspector, Region III ATTN:
E. R. Schweibinz
-