JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS JULY, 1983 There was one power reduction in the :nonth of July.

The following safety-related maintenance was performed in the montn of July:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Replaced air motor on fuel transfer system.

3.

Performed preventive maintenance on chargiug pumps 2A, 2B and 2C.

4.

Added packing to #7 river water pump.

5.

Performed safety-related maintenance on valve Q2G22V063A (Reactor Makeup Water isolation valve to 2A Waste Gas Compressor).

6.

Repaired 2B waste gas compressor unloader valve.

f l

l t

~

8308140211 830811 PDR Ai>OCK 05000364 7

_,R PDR

t 6,

OPERATING DATA REPORT DOCKET NO.

50-364 DATE 8/01/83 COMPLETED BY IJ.G.Hai rs ton,III TELEPHONE r70si R99-5156 OPERATING STATUS J seph 11. Farley - Unit 2 Notes

1. Unit Name:

1)' Cum 61ative data since

2. Reportsg reriod:

Tulv-lor 1 7/30/81, date of

3. WW ThermalPower (MWt):

'652 860 commercial operation.,

4. Namepiste Rating (Gross MWs):
5. Design Electrical Rating (Net MWe): _329
6. Maximum Dependable Capcity (Gross MWe):

854.7 813.7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,If Any:

M /^

This Month Yr.-to-Date

' Cur'nalative 744 5087 17,568

11. Hours In Reporting Period
12. Number Of Hours Resctor was Critical 74a snR7 15,871.5
13. Reactor Reserve Shutdown Hours 0

0 i,g 6

14. Hours Generator 0n.Line 744 5087 15.689.4
15. Unit Reserve Shutdown Hours n

n 0

16. Gross Thermal Energy Genersted (MWH) 1.960.067 13.451.008 38,872,822
17. Gross Electrical Energy Generated (MWH) 603,884 4,258.568 in ou an9
18. Net Electrical Energy Generated (MWH) 573,532 4,051,788 17!?67 R1R
19. Unit Service Factor 100 n inn n 89.3
20. Unit Availability Factor 100.0 100.0 89.3 l
21. Ucit Capacity Factor (Using MDC Net) 94.7 97.9 85.8 93.0 96.1 84.2
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0

0 5.3

(

24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Eschi:

Refueline outace: Sertember 16. 1983. anproximately six weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status 1 Prior to Commercial Operation):

Forecast Achieved i

INIT!A L CRITICALITY 5/06/81 5/08/81 INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIAL 0PERAT10N 8/01/81 7/30/81 (4/77)

e

..a t

~

UNIT 2

8/01/83 1 1 dan yl COMPLETED BY W.G. Hairston, III (205) 899-5156 ptcoHONE M0tml duly, 1983

/

a

I DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe Net)

(31We Net) l t

g7 778 776

.i 769 779

{

2 13

.]

777'- --

g9_.

78i' 3

}

4' 777

g 7RO 775 i

3 21 777

$,j 6

779 22 779 l

7 y

767 777 l

774 765 8

24 j

{

9 3

771 774 10 776 26 774 t

780 776 gg 7

12 778 m

781 618 781 g3 772 30 781 14 781 IS 771 31 16 776

i Ii ecrIRL'CEONS t

On this form:t. list the aver:ge dsdy umt puwer !cvelin MWe Net for e:ch d y in the reparung month. Compute to d

, the neare:t whole me;: watt.

f (997)

.?

l

)

i l

i i

il

i-

~

--~,,-.r....1.-,.

,~~~m.

-~

l

,c

_v _ -

o O

C

'50-364 UNITSilu1 DOWNS ANI) POWER RElH)CIlONS DOCKETNO. _

UNIT NAME J.M. Farley - Unit 2 D41E 8/02/83 REPORT MONiil JULY COMPLETEp uY U_

n Rai retnn_, III TELLPilONE _(205) 899-5156 I

l l.

.'5 sa :

g "i:

(

c_

re No-()ase 1

I k

3 Sb n

.c 5 a:

Eve.no uv a3 O"" A C"",o*'8I'8 b

ga Aceh.

x Ob fNhl N8P"88 I PsCvcus Recusscucc b

001 830713 F

0 A

4 NA CB INSTRU Power red'uction to 50% due to a high

  1. 1 seal leakoff flow indication for reactor coolant pump 2A.

Unit was returned to 100% power following verification of acceptable #1 seal leakoff flow.

1'

, i l'

I 2

3 4

F: FostcJ Neason:

Method:

Exhibit G -Insisuctions S: SilicifulcJ A Equipmens failure (Explain) 1 Manual for Psepasasieni of Dasa

1 in-Maintenance of Test 2 Manual Scram.

Entsy Sliccas fos 1.icensee C-Hefueling 3 Automalic Scram.

Event Repius (l.ER) File (NUREG-D Regulasoey Resnicehm 4-Oshes (Emplain) 0161)

E-Opesaios Training & ticense Exandnation F-AJudaisisasive 5

G Opciational Luos (limplain)

Exhibis 1 - Same Sous.*e j

(9/77) ll Othes (Explain)

A gr N

l' i

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS JULY, 1983 There was one power reduction in the month of July.

The following safety-related maintenance was performed in the month of July:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Replaced air motor on fuel transfer system.

3.

Performed preventive maintenance on charging pumps 2A, 2B and 2C.

4.

Added packing to #7 river water pump.

5.

Performed safety-related maiutenance on valve Q2G22V063A (Reactor Makeup Water isolation valve to 2A Waste Gas Compressor).

6.

Repaired 2B waste gas compressor unloader valve.

4

o

. OPERATING DATA REPORT 50-364 DOCKET NO.

DATE 8/01/83 COMPLETED BY W.G.Hairston,III TELEPHONE (70s) R99-5156 OPERATING STATUS Notes J seph M. Farley - Unit 2

1. Unit h
1) Cumslative data since

.Tu lv, 1981

2. Reporting Period:

7/30/81, date of

3. I e=aw Thermal Power (MWt):

2652 860

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):

854.7

6. Maximum Dependable Capacity (Gross MWa).

813.7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A N/A

9. Power Level To Wluch Restncted,If Any (Net MWe):
10. Reasons For Restrictions. If Any:

M /^

His Month Yr..to-Date

' Cumulative 744 5087 17,568

11. Hours In Reporting Period
12. Number of Hours Resctor Was Critical 74a sna7 15,871.5 0

0 ias.6

13. Reactor Reserve Shutdown Hours 744 5087 15.689.4
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours n

n 0

1.960.067 13.451.008 38,872,822

16. Gross Thermal Energy Generated (MWH) 603,884 4,258,568 39 a.u nno
17. Gross Electrical Energy Generated (MWH) 573,532 4,051,788 37:267IR1R
18. Net Electrical Energy Generated (MWH) inn n inn n 89.3
19. Unit Service Factor 100.0 100.0 89.3
20. Unit Availability Factor 94.7 97.9 85.8
21. Unit Capacity Factor (Using MDC Net) 93.0 96.1 84.2
22. Unit Capacity Factor (Using DER Net) 0 0

5.3

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Refueline outane: Septembe r 16. 1983. anproximately six weeks.

N/A

25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status IPrior to Commercial Operation):

Forecast Achieved 5/06/81 5/08/81 INIT!A L CRIT!CALITY 5/24/81 5/25/81 INITIAL ELECTRICITY COMMERCIAL OPERATION 8/01/81 7/30/81 (4/77i ma m------

50-364 DOCKET.NO.

e s

UNIT 2

8/01/83

.i DAR

\\ \\ '. '

COMPLEED BY W.G. Hairston, III l,.

(205) 899-5156 j

TEEPHONE l

'l I

3g0NUI July, 1983

I DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE Net)

($fWe-Net)

]

g, 37 776 778

.i 769 779

.i 2

13 78i J,

~

~

777 '---- -

9 --

3 1

4' 777 20 7Rn 775 777

.i y

gg

,1 6

779

. U.

77' 777 767 7

23 774 765 8

24 s

774 771 9

43 -

10 776

~6 774 780 776 gg 2'1 778 3

781 l

12 I,

618 781

}

,3 3

772 30 781 14 781 e

gg 77 't 33 776 16

,i etsTRectoNs l:.

On this form:t. list the avense daily umt puwer levet in MWe-Net for e:ch d:y in the reporting month. Compute to

, the neare:t whuic me;2 watt.

j

'I,!

!i (997)

L?

'f a

~

j~

a. w c

.w

=

.. ~.

n.

s e

'50-364 UNITSiluTDOWNS ANDPOWER REinJCI10NS DOCKET NO.

UNIT NAME J.M. Farley - Unit 2 DATE 8/02/83 NEPORT MONTil JULY COMPLETEu my u G Hairstnn, III TEl.ErilONE (205) 899-5156

's E

E c

c.

h

'"'* A

""*I'*

No-Daic 1

'S k

3 SU p

gg g

.c 5 x Event

{3 Q

Action so I

3sl RePost

  • g Picvens Recunence i

mu o-3

~

d I

001 830713 F

0 A

4 NA CB INSTRU

.ower red'ction to 50% due to a high u

  1. 1 seal leakoff flow indication for reactor coolant pump 2A.

Unit was returned to 100% power following verification of acc~eptable #1 seal leakoff flow.

il l

l t

I 2

3 4

L.

F: Forced Reason:

Method:

Exhibit G -Insisuctions S: Stheduled A-Equipment Failure (Explain) l Manual for Psepasation of Data 4

Il Maintenance ciTest 2 Manual Scsam.

Ent:y Sheets fos 1.iccusec i

C Hefueling 3 Aulomalic Scram.

Evens Repmi (l.ER) File INUREG-D Regulatosy Restsicsion 4-Oaher (Emplain) 01611 E Opesanos Training a license Examination d

F Adminisuasive 5

ju G Opesansonal Luos (limplain) lixhibis 1 Same Sous.e J{

(9/71) ll Othes (Explain) i 0

1

. Memng Address

'Atbam:n Power Company 600 North 18th Street Post Offics Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

senior vice President Alabama Pbwer Flintridge Building the southem electrc system August 11, 1983 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Dea r Si r:

RE: Joseph M. Farley Nuclear Plant Unit 2 Honthly Operating Data Report Attached a re two (2) copies of the July, 1983 Monthly Operating Report for Joseph M.

Fa rl ey Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Speci-fications.

As requested by letter from Mr. John F.

Stolz to M r.

Alan R.

Barton, dated October 21,
1977, a

" Narrative Summa ry of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very tr y

F. L. Cl ayton, J r.

FLCJr/KWM:nac Enclosures xc: M r. Ted Cintula_(1 copy)

Director, IE-(10 copies)

Di rector, RII (1 copy)

J 4+

h