JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS JULY, 1983 There was one power reduction in the :nonth of July.
The following safety-related maintenance was performed in the montn of July:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Replaced air motor on fuel transfer system.
3.
Performed preventive maintenance on chargiug pumps 2A, 2B and 2C.
4.
Added packing to #7 river water pump.
5.
Performed safety-related maintenance on valve Q2G22V063A (Reactor Makeup Water isolation valve to 2A Waste Gas Compressor).
6.
Repaired 2B waste gas compressor unloader valve.
f l
l t
~
8308140211 830811 PDR Ai>OCK 05000364 7
_,R PDR
t 6,
OPERATING DATA REPORT DOCKET NO.
50-364 DATE 8/01/83 COMPLETED BY IJ.G.Hai rs ton,III TELEPHONE r70si R99-5156 OPERATING STATUS J seph 11. Farley - Unit 2 Notes
- 1. Unit Name:
1)' Cum 61ative data since
- 2. Reportsg reriod:
Tulv-lor 1 7/30/81, date of
- 3. WW ThermalPower (MWt):
'652 860 commercial operation.,
- 4. Namepiste Rating (Gross MWs):
- 5. Design Electrical Rating (Net MWe): _329
- 6. Maximum Dependable Capcity (Gross MWe):
854.7 813.7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
M /^
This Month Yr.-to-Date
' Cur'nalative 744 5087 17,568
- 11. Hours In Reporting Period
- 12. Number Of Hours Resctor was Critical 74a snR7 15,871.5
- 13. Reactor Reserve Shutdown Hours 0
0 i,g 6
- 14. Hours Generator 0n.Line 744 5087 15.689.4
- 15. Unit Reserve Shutdown Hours n
n 0
- 16. Gross Thermal Energy Genersted (MWH) 1.960.067 13.451.008 38,872,822
- 17. Gross Electrical Energy Generated (MWH) 603,884 4,258.568 in ou an9
- 18. Net Electrical Energy Generated (MWH) 573,532 4,051,788 17!?67 R1R
- 19. Unit Service Factor 100 n inn n 89.3
- 20. Unit Availability Factor 100.0 100.0 89.3 l
- 21. Ucit Capacity Factor (Using MDC Net) 94.7 97.9 85.8 93.0 96.1 84.2
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
0 5.3
(
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Eschi:
Refueline outace: Sertember 16. 1983. anproximately six weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status 1 Prior to Commercial Operation):
Forecast Achieved i
INIT!A L CRITICALITY 5/06/81 5/08/81 INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIAL 0PERAT10N 8/01/81 7/30/81 (4/77)
e
..a t
~
UNIT 2
8/01/83 1 1 dan yl COMPLETED BY W.G. Hairston, III (205) 899-5156 ptcoHONE M0tml duly, 1983
/
a
- I DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe Net)
(31We Net) l t
g7 778 776
.i 769 779
- {
2 13
.]
777'- --
g9_.
78i' 3
- }
4' 777
- g 7RO 775 i
3 21 777
- $,j 6
779 22 779 l
7 y
767 777 l
774 765 8
24 j
{
9 3
771 774 10 776 26 774 t
780 776 gg 7
12 778 m
781 618 781 g3 772 30 781 14 781 IS 771 31 16 776
- i Ii ecrIRL'CEONS t
On this form:t. list the aver:ge dsdy umt puwer !cvelin MWe Net for e:ch d y in the reparung month. Compute to d
, the neare:t whole me;: watt.
f (997)
.?
l
)
- i l
i i
il
- i-
~
--~,,-.r....1.-,.
,~~~m.
-~
l
,c
_v _ -
o O
C
'50-364 UNITSilu1 DOWNS ANI) POWER RElH)CIlONS DOCKETNO. _
UNIT NAME J.M. Farley - Unit 2 D41E 8/02/83 REPORT MONiil JULY COMPLETEp uY U_
n Rai retnn_, III TELLPilONE _(205) 899-5156 I
l l.
.'5 sa :
g "i:
(
c_
re No-()ase 1
I k
3 Sb n
.c 5 a:
Eve.no uv a3 O"" A C"",o*'8I'8 b
ga Aceh.
x Ob fNhl N8P"88 I PsCvcus Recusscucc b
001 830713 F
0 A
4 NA CB INSTRU Power red'uction to 50% due to a high
- 1 seal leakoff flow indication for reactor coolant pump 2A.
Unit was returned to 100% power following verification of acceptable #1 seal leakoff flow.
1'
, i l'
I 2
3 4
F: FostcJ Neason:
Method:
Exhibit G -Insisuctions S: SilicifulcJ A Equipmens failure (Explain) 1 Manual for Psepasasieni of Dasa
- 1 in-Maintenance of Test 2 Manual Scram.
Entsy Sliccas fos 1.icensee C-Hefueling 3 Automalic Scram.
Event Repius (l.ER) File (NUREG-D Regulasoey Resnicehm 4-Oshes (Emplain) 0161)
E-Opesaios Training & ticense Exandnation F-AJudaisisasive 5
G Opciational Luos (limplain)
Exhibis 1 - Same Sous.*e j
(9/77) ll Othes (Explain)
A gr N
l' i
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS JULY, 1983 There was one power reduction in the month of July.
The following safety-related maintenance was performed in the month of July:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Replaced air motor on fuel transfer system.
3.
Performed preventive maintenance on charging pumps 2A, 2B and 2C.
4.
Added packing to #7 river water pump.
5.
Performed safety-related maiutenance on valve Q2G22V063A (Reactor Makeup Water isolation valve to 2A Waste Gas Compressor).
6.
Repaired 2B waste gas compressor unloader valve.
4
o
. OPERATING DATA REPORT 50-364 DOCKET NO.
DATE 8/01/83 COMPLETED BY W.G.Hairston,III TELEPHONE (70s) R99-5156 OPERATING STATUS Notes J seph M. Farley - Unit 2
- 1. Unit h
- 1) Cumslative data since
.Tu lv, 1981
- 2. Reporting Period:
7/30/81, date of
- 3. I e=aw Thermal Power (MWt):
2652 860
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
854.7
- 6. Maximum Dependable Capacity (Gross MWa).
813.7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A N/A
- 9. Power Level To Wluch Restncted,If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
M /^
His Month Yr..to-Date
' Cumulative 744 5087 17,568
- 11. Hours In Reporting Period
- 12. Number of Hours Resctor Was Critical 74a sna7 15,871.5 0
0 ias.6
- 13. Reactor Reserve Shutdown Hours 744 5087 15.689.4
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours n
n 0
1.960.067 13.451.008 38,872,822
- 16. Gross Thermal Energy Generated (MWH) 603,884 4,258,568 39 a.u nno
- 17. Gross Electrical Energy Generated (MWH) 573,532 4,051,788 37:267IR1R
- 18. Net Electrical Energy Generated (MWH) inn n inn n 89.3
- 19. Unit Service Factor 100.0 100.0 89.3
- 20. Unit Availability Factor 94.7 97.9 85.8
- 21. Unit Capacity Factor (Using MDC Net) 93.0 96.1 84.2
- 22. Unit Capacity Factor (Using DER Net) 0 0
5.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Refueline outane: Septembe r 16. 1983. anproximately six weeks.
N/A
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achieved 5/06/81 5/08/81 INIT!A L CRIT!CALITY 5/24/81 5/25/81 INITIAL ELECTRICITY COMMERCIAL OPERATION 8/01/81 7/30/81 (4/77i ma m------
50-364 DOCKET.NO.
e s
UNIT 2
8/01/83
.i DAR
\\ \\ '. '
COMPLEED BY W.G. Hairston, III l,.
(205) 899-5156 j
TEEPHONE l
'l I
3g0NUI July, 1983
- I DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE Net)
($fWe-Net)
]
g, 37 776 778
.i 769 779
.i 2
13 78i J,
~
~
777 '---- -
- 9 --
3 1
4' 777 20 7Rn 775 777
.i y
gg
,1 6
779
. U.
77' 777 767 7
23 774 765 8
24 s
774 771 9
43 -
10 776
~6 774 780 776 gg 2'1 778 3
781 l
12 I,
618 781
}
,3 3
772 30 781 14 781 e
gg 77 't 33 776 16
,i etsTRectoNs l:.
On this form:t. list the avense daily umt puwer levet in MWe-Net for e:ch d:y in the reporting month. Compute to
, the neare:t whuic me;2 watt.
j
'I,!
!i (997)
L?
'f a
~
j~
- a. w c
.w
=
.. ~.
n.
s e
'50-364 UNITSiluTDOWNS ANDPOWER REinJCI10NS DOCKET NO.
UNIT NAME J.M. Farley - Unit 2 DATE 8/02/83 NEPORT MONTil JULY COMPLETEu my u G Hairstnn, III TEl.ErilONE (205) 899-5156
's E
E c
c.
h
'"'* A
""*I'*
No-Daic 1
'S k
3 SU p
gg g
.c 5 x Event
{3 Q
Action so I
3sl RePost
- g Picvens Recunence i
mu o-3
~
d I
001 830713 F
0 A
4 NA CB INSTRU
.ower red'ction to 50% due to a high u
- 1 seal leakoff flow indication for reactor coolant pump 2A.
Unit was returned to 100% power following verification of acc~eptable #1 seal leakoff flow.
il l
l t
I 2
3 4
L.
F: Forced Reason:
Method:
Exhibit G -Insisuctions S: Stheduled A-Equipment Failure (Explain) l Manual for Psepasation of Data 4
Il Maintenance ciTest 2 Manual Scsam.
Ent:y Sheets fos 1.iccusec i
C Hefueling 3 Aulomalic Scram.
Evens Repmi (l.ER) File INUREG-D Regulatosy Restsicsion 4-Oaher (Emplain) 01611 E Opesanos Training a license Examination d
F Adminisuasive 5
ju G Opesansonal Luos (limplain) lixhibis 1 Same Sous.e J{
(9/71) ll Othes (Explain) i 0
1
. Memng Address
'Atbam:n Power Company 600 North 18th Street Post Offics Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.
senior vice President Alabama Pbwer Flintridge Building the southem electrc system August 11, 1983 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Dea r Si r:
RE: Joseph M. Farley Nuclear Plant Unit 2 Honthly Operating Data Report Attached a re two (2) copies of the July, 1983 Monthly Operating Report for Joseph M.
Fa rl ey Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Speci-fications.
As requested by letter from Mr. John F.
Stolz to M r.
Alan R.
- Barton, dated October 21,
- 1977, a
" Narrative Summa ry of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very tr y
F. L. Cl ayton, J r.
FLCJr/KWM:nac Enclosures xc: M r. Ted Cintula_(1 copy)