Interim Significant Deficiency Rept 83-06 Re Misoperation of Westinghouse Loop Power Supply & Temp Channel Test Cards. Initially Reported on 830616.Cards Not Present in Plant. Next Rept by 830826
ML20077H935
Person / Time
Site: Beaver Valley
Issue date: 07/19/1983
From: Woolever E
DUQUESNE LIGHT CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, 2NRC-3-046, 2NRC-3-46, 83-06, 83-6, NUDOCS 8308120075
Download: ML20077H935 (5)


Text

<

$VL 2NIEC-3'-046 (412)787 - 5141 Telecopy 8-July 19, 1983 Nuclear Construction Division Robinson Plaza, Building 2. Suite 210 Pittsburoh, PA 15205 United States Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, PA 19406 ATTENTION:

Dr. Thomas E. Murley Administrator

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Westinghouse NLP and NTC Cards Significant Deficiency Report No. 83-06, Int erim Report Gentlemen:

This Interim Repo rt is in reference to the pot ent i al mi so pe ra t io n of Westinghouse's loop powe r supply (NLP ) ca rd s and Tempe ra tur e Channel Test (NTC) cards as repo rt ed to the Nuclear Regulatory Commission by S. D.

Hall of Duquesne Light Company on June 16, 1983.

An evaluation of these two ca rd s has de t e rmined that the NLP ca rd s are not pr es e nt in BVPS-2, while the NTC cards require further analysis.

Pursuant to the requirement s of 10CFR50.5 5(e), it is ant icipated that a sub s eq ue nt repo rt on this matter will be submi tted to Region I by August 26, 1983.

An extension was req ue s t ed on Ju ly 18, 1983, to submi t this repo rt by July 19, 1983.

The req ue s t was made to Mr. Lowell Tripp of Region I of the NRC via a phone call, and found this extens ion acceptab le.

DUQUESNE LIGHT COMPANY By 9

(

E.(/. Woolever Vice Pres ident JS/wjs At t achme nt cc:

Mr. R. DeYoung, Director Of fice of Inspection and Enforcement (3) (w/ attachment )

Mr. G. Walton, NRC Resident Ins pector (w/ attachment)

Ms. L. Lazo, NRC Project Manager (w/ attachment)

NRC Document Control Desk (w/ attachment)

INPO Rec o rd s Cent e r (w/ at t achme nt )

SUBSCRIBED AND SWORN TO BEFORE ME THIS

/,ODAY 0 19 83.

5JENAC Not ary Pub lic ELVA G. LESONDAK, NOTARY PUBLIC

]

8308120075 830719 ROBINSON TOWNSHIP. ALLEGHENY COUNTY PDR ADOCK 05000412 MY COMMISSION EXPIRES OCTOBER 20,1985 6

PDR

\\\\

f

~

t United States Nuclear Regulatory Commission Dr. Thomas E. Murley page 2 COMMONWEALTil 0F PENNSYLVANIA )

)

SS:

COUNTY OF ALLEGHENY

)

On this

/ --

day of

/

/ff[

, be fo re me,

/

a Notary Pub lic in and fo r ;/said Comannwe alt h ani County, pe rsonal ly appeared E.

J.

Woolever, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Ligh t, (2) he is duly authorized to exe-cute and file the fo regoi ng Submittal on behalf of said Company, and (3) the s t at ement s set forth in the Submit cal are true and correct to the best of his knowledge.

cI.& W

~

Not ary Pub lic ELVA G. LESONDAK, NOTARY PUBLIC ROBINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXPIRES OCTOBER 20,1986 l

l 1

9 United Str.tes Nuclear Regulatory Commission Mr. James Allen page 3 JS/wjs At t achme nt bec: R. Coupland (w/ attachment)

C. E. Ewing INPO Records Center T. J. Lex (4)

NCD File J. Pedro (NUS)

S. Phillips (W)

P. RaySircar T3)

J. Sutton (S&W)

K. A. Troxle r J. F. Zagorski C. R. Bishop T. D. Jones H. M. Siegel R.J. Swiderski

REFERENCES:

1.

Significant Deficiency Report No. 83-06 2.

DMW-D-3478, dated June 13, 1983 3.

2BV-723, dated July 12, 1983

f

~

1 a

BEAVER VALLEY POWER STATION - UNIT NO. 2 DUQUESNE LIGHT COMPANY l

i Report on Potential Significant Deficiency No. 83-06 Wes tinghouse NLP and NTC Cards 1.0

SUMMARY

Westinghouse has de sc ribed two problems conce rning their 7300 Process Prot ect ion Sys tem.

The pr ob lems are with the loop power supply (NLP) cards and the Temperature Channel Test (NTC) cards.

2.0 IMMEDIATE ACTION TAKEN Mr. S. D. Hall of Duquesne Light Company's Regulatory Af fairs Department not ified Mr. Harry Kister of the NRC Region I of fice on June 16, 1983, of the pot ent ial 10 C FR50.5 5 (e ).

An engineering evalua t io n is unde rway to determine the reportability status of these two cards.

3.0 DESCRIPTION

OF THE DEFICIENCY The first problem conce rns the N LP ca rd s wh ich were sh ip ped fr om Wes t inghou se Industrial E le ct ronic s Division (WIED) between 8/1/80 to 9/1/82.

These cards were found to have adhes ive bond fa ilur e wh ich could cause the heat sink plate to separate and f all of f of the pr int ed c ircui t board.

The plate is a conduct ive metal and unde r ce rt nin circumstances could cause sho rt ing of low level signals if it be came wed ged between ca rd s in the ca rd fr ame.

The af fect ed pr int ed circuit boa rd s are:

5NLP Sub-level 18 and ab ove, and 6NLP Sub-level 18 and above.

The heat sinks of concern can be ident ified by an ins pect ion of the printed circuit ca rd fo r hex nuts visib le on the top side of the assembly.

The second problem deals with a contact bounce experienced during seis-mic testing of the Temperature Channel Test (NTC) cards. This int e rm i t-tant cont ac t bounce will result in signal saturation of the downstream RTD Amplifier (NRA) card in the T hot and T cold circuits of the Westinghouse 7300 Pr oces s Pr ot ect ion System.

This signal saturat ion could result in a possible delay of the overtemperature -

T a nd ove r-power -

T trips for BVPS-2, 4.0 ANALYSIS OF SAFETY IMPLICATION Stone & Webster Engincaring Corporation, pe rfo rmed a rev i ew to de t ermine if any of the NLP were shipped and ' were used in BVPS-2 for BOP applica-t ions.

The result of that rev iew and iaspection has de t e nnined that these cards are not pr es ent in BOP applications.

Wes t inghou se, BVPS-2 's NSSS supplier, has indicated that they have not supplied any NLP ca rd s directly to BVPS-2.

Based on Wes tinghouse and S&W reviews, these cards are not present for BVPS-2.

l l

The sec ond problem concerning the NTC relay ca rd s is cur rent l y unde r l

evalua t ion.

To date our inves tigation has found the NTL cards in ten instrument ch annel s whose cont rolli ng fun ct ion is to operate the HVAC

4 system.

In part icular, the faulty cards could result in poor control of the tempe rature of the Diesel Generator Room and the Emergency Switch Room.

The safety implica t ions, if any, will be de t ermined after the data is completely analyzed.

5.0 CORRECTIVE ACTION TO REMEDY DEFICIENCIES No corrective action need be taken by Duquesne Light Company for the NLP c ard s since they are not pr esent in BVPS-2.

The correct ive act ion for t he NTC c a rd s, if any, will be initiated after the engineering evalua-tion noted in Section 2.0 of this report is complete.

6.0 ADDITIONAL REPORTS An ad di tional repo rt on the status of the NTC cards will be issued by Duquesne Light Company by August 26, 1983.