OPERATI G DATA REPORT DOCKET NO. 50-334 DATE Juiv 5, 1933 COMPLETED BY J. 1,. lioltz TEI.EPHONE. 41 A4 a-1369 OPERATING STATUS Beaver Valley Power Station. Unit #1 Notes
- 1. Unit Name:
June, 1983
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2"O 923
- 4. Nameplate Rating (Gross MWe):
852
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
860 810
- 7. Maximum Dependable Capacity (Net MWe):
8.' If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since last Report, Give Reasons:
\\
- 9. Power Level To Which Restricted If Any (Net MWe):
None
- 10. Reasons For Restrictions,If Any:.
N/A This Month Yr to-Date
' Cumulative 720 4,'343 62,807
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 241.17 3,718.9 23,536.4
- 13. Reactor Reserve Shutdown Hours 0
0 4.482.8
- 14. Hours Generator On-Line 239.4 3,708.2 27,508.4
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 585,214.2 9,476,648.8 61,986,830.2
- 17. Gross Electrical Energy Generated (MWH) 191,900 3,091,400 19,604,040
- 18. Net Electrical Energy Generated (MWH) 173,927 2,946,909 18,159,026
- 19. Unit Service Factor 33.3 85.4 45.9
- 20. Unit Asailability Factor 33.3 85.4 45.9
- 21. Unit Capacity Factor (Using MDC Net) 30.7 83.8 39.3
- 22. Unit Capacity Factor (Using DER Net) 29.2 79.6 37.3
- 23. Unit Forced Outage Rate 0
0 32.3
- 24. Shutdowns Scheduled Over Next 6 Months IType, Date. nd Duration of Each):
Shutdoun for 3rd Refueling on June 10, 1933. Projected duration is 83 days.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startop:
Septeuoer 6, 1983
~
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIA L ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A f, # D 8308110208 830705 PDR ADOCK 05000334 R
1
'+
AVERAGE DAILi UNIT POWER LEVEL t
l 50-334 DOCKET NO.
3U S IInit #1 UNIT DATE July 5, 1983 l
l COMPLETED SY J. L. Holtz.
412-643-1369.
TELEPHONE June, 1933 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Nets 763 o
g7 2
gg 0
776 g,
784 39 o
3 768 3
o 4
768 0
y 763 0
6 3
780 0
7 g
776 0
l-3 3
755 0
k-9 3
10
-697 0
3 0
0 il 27
.0 0
12 73 0
0 13 29 i*
0 0
14 30
- /
0 15 3;
0 I6
~
l 1
INSTRUCTIONS On this format.!ist the average d:ily unit power leselin MWe Net for esch day in the reportin5 munth. Compute io the nestest whole meg:: watt.
(9/77) l
-s
UNITSilOTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-334 UNIT NAME BVPS Unit #1 DATE July S, 1983
. REPORT MONTil _
June, 1983 COMPLETED BY J. L. lioltz TELEP110NE 412-643-1369
- h, C
N O en =*
c No.
Date E.
$e 855 LI""5" 5't g"o Cause & Correceive
.c 3 oc Event ag
- o. o x
- o
=
2@c Reporg a do Ed ACIICH 80
$ib E
E g
6 Prevent Recurrence O
5 06/10/83 S
~480.6 C
1 N/A ZZ ZZZZZZ Shutdown for 3rd refueling and major modifications outage.
I 2
3 F: Forced Reason:
4.
Hethod:
Exhibis G -Instinctions
.S: Scheduled A. Equipment Failure (Explain) 1-Manual fin Picparail.m of Data B. Maintenance of Test 2-Manual scram C. Refueling lintr> Shecis for I.icensee 3-Automatic Scram D Regulainty Restriclion Avent Repius Il.I'RI file iNllREG 4-Continued From Previous Month 0161) 1: Operain: Training A IJcense !!xamination S-Reduction F. Administrative 9-other 5
G Operational liisin (limplain t I'l/77) ll-Osher (Explaini fixhibli 1 Same, Source
Y NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE - JUNE, 1983 June 1 The station was in Operational Mode 1 with the reactor coolant through system at normal operating temperature and pressure. On the June 10 1st, reactor power was escalated following repair of the "C" Main Feedwater Regulating Valve [FCV-1FW-498], which was com-pleted on May 31.
Reactor power was taken to 95 percent at 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br /> and held steady. This power level was maintained until the 10th at 2115 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.047575e-4 months <br /> when a load reduction was commenced to take the station off-line for refueling.
At 2324 hours0.0269 days <br />0.646 hours <br />0.00384 weeks <br />8.84282e-4 months <br />, the Main Unit Generator output breakers were opened, and the turbine was tripped at 2326 hours0.0269 days <br />0.646 hours <br />0.00385 weeks <br />8.85043e-4 months <br />.
June 11 At 0110 hours0.00127 days <br />0.0306 hours <br />1.818783e-4 weeks <br />4.1855e-5 months <br />, the station entered Operational Mode 3, hot standby.
l' June 12 At 0410 hours0.00475 days <br />0.114 hours <br />6.779101e-4 weeks <br />1.56005e-4 months <br /> on the 12th, the station entered Mode 4.
At through 1213 hours0.014 days <br />0.337 hours <br />0.00201 weeks <br />4.615465e-4 months <br /> on the 12th, Cold Shutdown Mode 5 was entered in June 24 preparation for the plant's 3rd Refueling.
\\
June 25 At 2106 hours0.0244 days <br />0.585 hours <br />0.00348 weeks <br />8.01333e-4 months <br /> on the 25th, detensioning of the reactor vessel through hecd commenced, and Mode 6 was entered.
Station remained in June 30 Mode 6 through June 30th.
s I
i 1
l L
1 w
9 if q
r wy-+a a
F vP-
-+t m
g s--
t e
-*-^!
I-
.o MAJOR SAFETY-RELATED MAINTENANCE - JUNE, 1983 1.
The "A" Residual deat Removal Pump [lRH-P-1A] mechanical seal repair was completed.
2.
The "C" Reactor Coolant Pump [RC-P-lC) seal work is currently in progress.
'N l
i i
I l
y. %-
'Af Telephone (412) 393-6000 Nuclear Division P.O. Box 4 Shippingport, PA 15077-0004 July 5, 1983 Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report United States Nuclear Regulatory Commission Director, Of fice of ilanagement Information & Program Control Washington, D.C.
20555 Gentlemen:
In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for the month of June, 1983.
Very truly yours, f
J. J. Carey Vice President Nuclear Division Enclosures cc: NRC Regional Office, King of Prussia, PA I