ML20077H680
| ML20077H680 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 07/15/1983 |
| From: | Dixon O SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| REF-PT21-83-945-000 PT21-83-945, PT21-83-945-000, NUDOCS 8308110207 | |
| Download: ML20077H680 (2) | |
Text
..
4
..s i
USNRC PEWOijTH CAROLINA ELECTRIC & GAS COMPANY ATL ANU. GE.ORGI A
,..,o,,,,,,
COLuusiA, South CAMOLINA 29216 MN$
July 15, 1983 NuctrAm O,enAttoND Mr. James P. O'Reilly Regional Administrator U.S.
Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta Street, N.W.
i Atlanta, Georgia 30303 i
SUBJECT:
Virgil C. Summer Nu. clear Station Docket No. 50/395 Operating License No. NPF-12 Westinghouse 7300 Process System 1
10 CFR 21 Response f
Dear Mr. O'Reilly As discussed with Mr.
R. C.
Butcher on July 15, 1983, South Carolina Electric and Gas Company (SCE&G) provided in a letter dated June 17,_1983, a report under the provision of 10 CFR 21 concerning two (2) potential problems within:the 7300 Process Protection System.
This letter stated that' relay contacts on the
~
NTC cards in question would be bypassed by permanently installed jumpers by July 15, 1983; however, due to delays in finalizing the proper jumper placement, installation will_not be completed-by the estimated date.
~
Instructions for the permanent jumper installationLhave been finalized-and work is ongoing at this time.
Jumper. installa tion l
should be completed by August 15, 1983.
i-The June 17, 1983, letter also stated that an investigation would ina performed to determine the number of Loop Power. Supply (NLP) l cards requiring heat sink replacement.
Also,'it was stated that.
an inspection of these identified cards will be conducted during i
_each periodic system test as required by Technical Specifications
~
until the heat sinks are replaced.
To date, the aforementioned L
investigation has been performed with no loose heat sinks discovered on installed cards.
l i
l i
Il
()
03os110207 830715
- OFFICJAL COPY-l PDR ADOCK 05000395 c- -
S PDR ego
=
Mr. James P.
O'Reilly Page 2 July 15, 1983 A monthly visual inspection of the subject NLP cards will be performed until they are replaced.
Ver truL.yours, gf r r-O. W.
XON, JR.
MNB:MDQ:OWD/dwf cc:
V.
C.
Summer E.
H. Crews, Jr.
T.
C.
Nichols, Jr./O. W.
Dixon, Jr.
E.
C. Roberts H. N. Cyrus Group / General Managers O.
S. Bradham R.
B.
Clary C.
A.
Price A.
R. Koon D.
A. Lavigne C.
L. Ligon (NSRC)
G. J. Braddick J. C. Miller J.
L.
Skolds J.
B. Knotts, Jr.
I&E (Washington)
Document Management Branch INPO Records Center NPCF File (Lic./Eng.)
i t
1 I
f f
y y
.w---
y-,,,.pr._
..y ym wv.,,,.e-
,wa
,,,,i.
,.,--.%.,-,-e
..,..e-.-,
n m.
.,-,e
..we.-