ML20077H601

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures EP-110 Re Personnel Assembly & accountability,EP-303 Re Partial Plant Evacuation & EP-305 Re Site Evacuation
ML20077H601
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/20/1983
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Murley S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20077H600 List:
References
NUDOCS 8308110117
Download: ML20077H601 (1)


Text

l l

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699

)

PHILADELPHI A. PA.19101 swartosLoatinora a1m m5p ELecTm c P.

c som July 20, 1993 Ret Docket Nos. 50-277 50-279 i

Dr. T.

E. Murley, Administrator Region I Office of Inspection and Enforcement ti.S. Nuclear Regulatory Commission 631 Park Avenue Minq of Prussia, PA 19406 Dest Dr. Murley Enclosed are two contes of additional revisions to the Peach Bottom Atomic Power Station Emergency Plan Implementing Procedurei.

These procedures are submitted, within 30 days of the chance, Der requintions in

.0 CPR 50, Anoendix E,.9ection it.

  • he crocedures being submitted are the following:

EP 110, Rev. 1 EP 303, Rev. 2 EP 309, n v.

5 e

Two copies have been sent under separate cover to the Document Control Desk.

Very truly yours, Gt:g:na: Jg'Od W 3, t,:. CALTP'i3 Enclosure cct Document Control Desk.'

ff.S. Muclear Regulatory Commission Nashington, DC

") 0 9 9 9 Site inspector - Peach Rottom 4-j 8308110117 830805 h

PDR ADOCK 05000277 F

PDR

REGULATURY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACC E S SI.O N NBR 644+4M6H--

00C.DATE: 83/07/20 NOTARIZED: NO DOCKET #

FACIL:'50-277 Peach Bottom Atomic Power Station, Unit 2, Philadelph 05000277 50-278 Peach Bottom Atomic Power Station, unit 3, Philadelph 05000278 AUTH.NAME AUTHOR AFFILIATION DALTROFF,S.L.

Philadelphia Electric Co.

RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.

Region 1, Office of Director SL8 JECT: Forwards Central Files version of revised emergency plan implementing procedures, including Procedures EP-110 re personnel assemoly 6 accountability,EP-303 re parti plant evacuation & EP-395 re site evacuation.

_J J6' 26[

DISTRIBUTION CODE X00SS COPIES RECEIVEu:LTH JI_ ENCL $

SIZE 4

~~~

TITLE: Emerg Plan (CF Avail)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES 10 CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL NRH ore 4 BC 1

0 GEARS,G 01 1

1 INTERNALO 02 1

1 FEMA TECH HAZO9 1

1 IE/DEPER/EPB 03 2

2 IE/DEPER/IRB 1

1 NRR/DSI/AEd 1

1 NRR/OSI/RAB 1

0 REG FILES 07 1

1 l

h TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL

  • 1('

_