ML20077H412
| ML20077H412 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/13/1983 |
| From: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| To: | Clark R, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20077H411 | List: |
| References | |
| NUDOCS 8308100135 | |
| Download: ML20077H412 (1) | |
Text
.
_.m._.
O Wisconsin Elecinc mia cwmr 231 W. MICHIGAN, P.O. B0X 2046, MILWAUKEE. WI 53201 July 13, 1983 Mr. H.
R. Denton, Director Office of Nuclear Reactor Regulation U.
S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Attention:
Mr.
R. A. Clark, Chief Operating Reactors Branch 3 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are.two copies of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures.
These revisions consist of page changes which should be filed in your copies of the procedures in accordance with the attached instructions.
Please return the receipt form for these two copies to:
Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Very truly yours, Q
Executive Vice President Sol Burstein Attachments Copies to NRC Resident Inspector Incident Response Center, Region III KPDk I
,a t
8308100135 830729 PDR ADOCK 05000266 F
_.