YVL 2NRC-3-053 (412)787 - 5141 Telecopy Nuclear Construction Division July 27, 1983 Robinson Plaza, Building 2, Suite 210 Pittsburgh, PA 15205 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:
Dr. Thomas E. Murley Administrator
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Emergency Diesel Generator Thermostatic Control Valve "O" Ring Significant Deficiency Report No. 83-07, Final Report Gentlemen:
Pursuant to the requirements of 10CFR50.55(e), the Final Report on the Emergency Diesel Generator Thermostatic Control Valve "0" ring (Robert-shaw Model I-1285-S25) is at t ached fo r your review.
If there are any ques t ions concerning this report, ple ase cont act the Beaver Valley No.
2 Project Of fice.
DUQUESN LIG T COMPANY By b-
^
/
E. J. Woolever 3 Vice President JS/wjs At tachment cc:
Mr. R. DeYoung, Director Of fice of Inspection arvi Enforcement (3) (w/a)
NRC Document Control Desk (w/a)
Mr. G. Walton, NRC Resident Inspector (w/a)
Ms. L. Lazo, Project Manager (w/a)
INPO Records Center (w/a)
SUBSCRIBED AND SWORN JO BEFORE ME THIS J7/d DAY OF Od 1983.
/
' Not ary Pub lic ANITA ELAINE REITER, NOTARY PUBLIC q
ROBINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXPIRES OCT0 AFD 20,19SS
/f 8309090512 830727
'/ 1
[i PDR ADOCK 05000412 q
FMER
United Stctss Nuclear R:gulctory Commission
, Dr. Thomas E. Murley Page 2 COMMONWEALTH OF PENNSYLVANIA )
)
SS:
COUNTY OF ALLEGHENY
)
On this
,,2 7// day of d
/ /[3, be fo re me,
a Notary Public in ard fo r said [bommonwealth and County, pe rsonal ly appeared E. J.
Woolever, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to exe-cute and file the foregoing S ubmit tal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the bes t of his knowledge.
C Not ary Pub lic
~
ANITA ELAINE REITER, NOTARY PU2UC ROBINSON TOWNSHIP, ALLEGHENY COUNT /
MY COMMISSION EXFIRES OCTOSER 20,1586 l
BEAVEM VALLEY POWER STATION - UNIT NO. 2 DUQUESNE LIGHT COMPANY Report on Potential Deficiency of Emergency Diesel Generator Thermostatic Control Valve "O" Ring I
i
.l.
SUMMARY
Robert shaw Controls Company reported to the NRC (IE Information Notice No. 83-56) that the Robertchaw thermos t at ic flow control valves (SWEC Mark ' Nos. 2EGS&TCV201-1, 2) provided on the BVPS-2 eme rge ncy diesel generator sets (PO-2BV-230) are potentially defective.
Malfunct ion of these valves could cause overcooling / overheating of the diesel engines.
i 2.
IMMEDIATE' ACTION TAKEN Mr. E.
F.
- Kurtz, Jr.,
Manage r of Duquesne. Light Compa ny's Regula to ry Af fairs Department, not ified Mr. Lowel1 Tripp of the NRC, Region I of fice on June - 27, 1983, on this -reportable significant de fici ency.
Upon notification of' the problem by IE Information Not ice 82-56, SWEC issued a report of this problem to SWEC's engineering department.
i 3.
DESCRIPTION OF DEFICIENCY Robert shaw - thermos tatic flow control valves have an "0"-ring which minimizes bypass leakage within the valve when the valve is positioned to direct. flow from the cooler.
The "O"-ring floats in a groove in the valve body web and is ~ around the valve plug.
It limits flow to ab out one pe rce nt of full flow.
Contamination within the coolant may cause swelling of the "0"-ring which will prevent movement of the valve plug.
4.
ANALYSIS OF SAFETY IMPLICATION The esergency diesel generators are required during design basis events to supply electric power to the safety-related component s.
The pot en-tial malfunct ion of the thermos tat ic control valves may cause extreme overcooling / overheating and, therefore, could adve rs ely af feet the safety of operations.
5.
CORRECTIVE ACTION TO REMEDY DEFICIENCIES Robertshaw Controls Company, working in conjunction with Colt Indus tries (the diesel generator manufacturer), has recommended removal of the "0"-
ring.
This would ' increase bypass flow to about 2 percent of full flow.
Colt Industries has indicated that this increase in bypass flow is acceptable.
6.
FINAL REPORT Correct ive action has been completed by the field forces.
The modifi-c at ion, removal of the "0"-ring, has been comple t ed.
Duquesne Light Company cons ide rs this item. closed and is issuing this as a final report.