Text

L o u s sia m a

,4,o,<A,oNoestem 3}

P O W E R & Ll G H T! P o Box caos. NEW ORLCANS LOutSIANA 70174

  • (504) 366 2345 utiut1ts :i stua July 25, 1983 W3183-0244 Q-3-A35.07.70 7%

k 5

U Mr. John T. Collins, Regional Administrator, Region IV 1]

U. S. Nuclear Regulatory Commission L

  • 2 8%

611 Ryan Plaza Drive, Suite 1000 at V

Arlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 l

Docket No. 50-382 Significant Construction Deficiency No. 70

~

"GE 480-V Trip Coils Do Not Drop Out After Tripping" Fourth Interim Report

REFERENCE:

LP&L letter W3I83-0227 dated June 22, 1983

Dear Mr. Collins:

The above referenced letter indicated submittal of a Final Report to the USNRC no later than July 22, 1983.

At the present time, LP&L is in the process of finalizing the review of supporting documentation for SCD 70.

This review is expected to be completed by August 12, 1983.

A Final Report will therefore be submitted to the USNRC by September 12, 1983.

Very truly yours, rJ F. J Drummond Project Support Manager - Nuclear FJD/RWP/ MAL:keh cet

1) Director 3)

Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555

2) Director 4)

Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 8309030408 030725 PDR ADOCK 05000302 S

PDR J E -2 7 s 4 i