ML20077G201
| ML20077G201 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/25/1983 |
| From: | Drummond F LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| W3I83-0244, W3I83-244, NUDOCS 8308030408 | |
| Download: ML20077G201 (1) | |
Text
L o u s sia m a
,4,o,<A,oNoestem 3}
P O W E R & Ll G H T! P o Box caos. NEW ORLCANS LOutSIANA 70174
- (504) 366 2345 utiut1ts :i stua July 25, 1983 W3183-0244 Q-3-A35.07.70 7%
k 5
U Mr. John T. Collins, Regional Administrator, Region IV 1]
U. S. Nuclear Regulatory Commission L
- 2 8%
611 Ryan Plaza Drive, Suite 1000 at V
Arlington, Texas 76012
SUBJECT:
Waterford SES Unit No. 3 l
Docket No. 50-382 Significant Construction Deficiency No. 70
~
"GE 480-V Trip Coils Do Not Drop Out After Tripping" Fourth Interim Report
REFERENCE:
LP&L letter W3I83-0227 dated June 22, 1983
Dear Mr. Collins:
The above referenced letter indicated submittal of a Final Report to the USNRC no later than July 22, 1983.
At the present time, LP&L is in the process of finalizing the review of supporting documentation for SCD 70.
This review is expected to be completed by August 12, 1983.
A Final Report will therefore be submitted to the USNRC by September 12, 1983.
Very truly yours, rJ F. J Drummond Project Support Manager - Nuclear FJD/RWP/ MAL:keh cet
- 1) Director 3)
Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555
- 2) Director 4)
Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555 8309030408 030725 PDR ADOCK 05000302 S
PDR J E -2 7 s 4 i