ML20077F764
| ML20077F764 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 07/27/1983 |
| From: | Mooney J CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20077F739 | List: |
| References | |
| CSC-6817, NUDOCS 8308030028 | |
| Download: ML20077F764 (1) | |
Text
A rn h>nnt A CDDSumBIS
~
~.
Power Company Awa projecs otp
~
f.
?:
194s w s r.rn.ii no.e.a.ek.on, ui 4e2os. is57) vos.o774
=-i,.;">;
o.n.r.i ome :
July 27, 1983 Mr J J Harrison
~ _
~
Midland Project Section
~
U S Nuclear Regulatory Ceasion Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDIAND ENEP&f CEN'IER GWD 7020 RB4EDIAL SOILS W3RK AUIBORIZATION File:
0485.16 UF1:
42*05*22*04 Serial: CSC-6817 12*32 In We have reviewed the wrk packages for the following activities.
accordance with the Work Authorization Procedure, we request your con-currence to perform the work:
162550100 Exploratory probe for UAT (west) 162550012 Pregrout frm UAT (west) 152550100 Exploratory probe for UAT (east) 152550012 Pregrout fr a UAT (east) c-102550135 Install piezcceters B31 and BB2 in Auxiliary Building Control Tower 155052035 Drift to Cr12 from from UAT 155053050 Excavate Pier Cr12 155054045 Install and load Pier Cr12 165052035 Daft to CTI from UAT 165053050 Excavate Pier Cr1 165054045 Install and load Pier CTI
<r -155052030 Drift to Kc3 from Kc2
<.-165052030 Drift Kc10, frcxn Kc11 c -132550027 Install strain gauges and terminate cables (includes testing and calibration) koo*%
JAM /RHW/klm 8309030028 830728 PDR ADOCK 05000 n
_.-