ML20077F261
| ML20077F261 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/20/1983 |
| From: | Foster D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, GN-244, NUDOCS 8308010312 | |
| Download: ML20077F261 (1) | |
Text
Georgia Power Company Post Office Box 4545 Atlanta, Georgia 30302 Telephone 404 526 6526 ATL/T
U7' m' Southern Company Services. Inc.
Georgia Power Post Othce Box 2625 Birmir:gham Alabama 35202 Southern CompanyServices ranw oosameon 83 JUL 21 al0: 5g D. O. Foster Vice President and General Manager Vogtle Prciect July 20,1983 United States Nuclear Regulatory Commission File: X78603-M45 Office of Inspection and Enforcement Log:
GN-244 Region II-Suite 3100 101 Marietta Street Atlanta, Georgia
Reference:
Vogtle Electric Generating Plant - Units 1 and 2 40-424,40-425, NSSS Protection System Relay Cards Attention: Mr. James P. O'Reilly Gentlemen:
On June 16, 1983, Georgia Power Company reported a potential deficiency to the NRC concerning Westinghouse NSSS Protection System Relay Cards.
Westinghouse reported this problem and a solution to the NRC in Westinghouse letter NS-EPR-2774, dated June 1, 1983. At this time, Georgia Power Company is reviewing the design at Plant Vogtle to determine if any modifications are needed.
Georgia Power Company will submit a final report on this issue to the NRC by August 30, 1983.
Your tr ly, b.O.Foste D0F/REF/cc xc:
U. S. Nuclear Regulatory Comission Document Control Desk Washington,,D. C.
20555 R. J. Kelly R. H. Pinson E. D. Groover D. O. Foster B. M. Guthrie L. T tm.
G. F. Head R. A. Thomas-M. Mai i
J. T. Beckham Jr.
J. A. Bailey _
G.-Bockhvid' D. N. MacLemore
- 0. Batum P. D. Rice D. E. Dutton H. H. ' Gregory III J. L. Vota W. F. Sanders R. E. Folker-O @161NLdOW F
gzu 8300010312 830720
~
PDR ADDCK 05000424 S-
' PyR c